The new 525 Olive mixed use San Diego tower was inspired by the coastal experience and luxury travel. The 300,000 sf, 20-story structure is connected to St. Paul’s Cathedral, located on the edge of 1600 acres of parkland and the museums of Balboa Park. Residents occupy 204 rental units (186 market rate and 18 deed-restricted low-income units). The building also houses a corner street-level retail/restaurant space.
Amenities include a rooftop pool deck with sweeping 270 degree views of San Diego from Mission Bay to the north to Mexico to the south. Several 18-foot stone arches on the feature wall are a nod to the gothic architecture of St. Paul’s Cathedral’s cloister and are visible for miles approaching the building. The fifth floor accommodates a state-of-the-art fitness deck that overlooks the treetops of Balboa Park. Additional luxury amenities include organic courtyards with outdoor seating, a pet spa with grooming stations, and conference rooms.
The building features a striking marble entry, pulling elements from the interior design out into the public street. A custom-designed installation composed of hundreds of fluttering hand-cut metal mesh butterflies adorn a see-through wall in the main lobby. The butterfly display is a reference to the surrounding parklands and natural environs.
All units were designed with high-end finishes and a soft, modern gray palette. Studio, 1-bedroom, and 2-bedroom units feature wood emulating plank flooring with quartz countertops
throughout. Kitchens are equipped with high gloss cabinetry with a herringbone marble backsplash. Washer and dryers are available in each unit.
Penthouse units feature 270 degree views, soaring 14-foot ceilings, engineered wood
flooring, and quartz countertops. All units have access to subterranean parking shared with St. Paul’s Cathedral.
The project preserves the historic architecture of the Cathedral, adding modernized and expanded spaces and upgrades to its public courtyard. Despite being in the midst of a bustling, walkable neighborhood, the location and the properties outdoor spaces afford residents an unexpected level of serenity and quiet.
On the Building Team:
Owner and/or developer: Greystar Real Estate and Development, Joint Venture with St. Paul’s Cathedral
Design architect: Jules Wilson Design Studio and Joseph Wong Design Associates
Architect of record: Joseph Wong Design Associates
Interior design: Jules Wilson Design Studio
MEP engineer: McParlane & Associates
Structural engineer: KorStructural (Formerly known as BMZ)
General contractor/construction manager: Greystar Real Estate and Development
Related Stories
University Buildings | Jul 6, 2022
Wenzhou-Kean University opens a campus building that bridges China’s past and future
After pandemic-related stops and starts, Wenzhou-Kean University’s Ge Hekai Hall has finally begun to see full occupancy.
Security and Life Safety | Jul 5, 2022
What AEC firms should look for in a cybersecurity partner
When looking for expert partners in cybersecurity, AEC firms will find quite a lot of companies claiming to be at the forefront of modern threats. Here are five key points to look for when choosing a cybersecurity firm.
Performing Arts Centers | Jul 5, 2022
Tour the new Patricia Reser Center for the Arts in Oregon
This month, the community of Beaverton, Oregon, welcomed a new haven for artistic expression with the opening of Patricia Reser Center for the Arts (The Reser).
Building Team | Jul 5, 2022
Dallas’ Fair Park, home to the State Fair of Texas, will place a park atop a new parking garage
A registered National Historic Landmark, Fair Park is the 227-acre home to the Texas State Fair and various cultural institutions in Dallas, Tex.
Market Data | Jul 1, 2022
Nonresidential construction spending slightly dips in May, says ABC
National nonresidential construction spending was down by 0.6% in May, according to an Associated Builders and Contractors analysis of data published today by the U.S. Census Bureau.
Building Team | Jul 1, 2022
How to apply WELL for better design outcomes
The International WELL Building Institute (IWBI) cites attracting top talent, increasing productivity, and improving environmental, social or governance (ESG) performance as key outcomes of leveraging tools like their WELL Building Standard to develop healthier environments.
Building Team | Jul 1, 2022
Less portable potty, more movable restroom
Some contractors are packing up their portable potties and instead using the H3 Wellness Hub.
Building Team | Jun 30, 2022
Adopting a regenerative design mindset
To help address the current climate emergency, a new way of thinking across the entire architecture, engineering and construction industry is imperative.
Market Data | Jun 30, 2022
Yardi Matrix releases new national rent growth forecast
Rents in most American cities continue to rise slightly each month, but are not duplicating the rapid escalation rates exhibited in 2021.
Headquarters | Jun 30, 2022
Lenovo to build its new global headquarters in Beijing
Washington, D.C.-based architecture and design firm CallisonRTKL has announced it will create the new global headquarters in Beijing for Lenovo Group, a Chinese multinational personal technology company.