flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Must see: 57-story modular skyscraper was completed in 19 days

Modular Building

Must see: 57-story modular skyscraper was completed in 19 days

After erecting the mega prefab tower in Changsha, China, modular builder BSB stated, “three floors in a day is China’s new normal.”


By Adilla Menayang, Assistant Digital Content Editor | March 10, 2015
A 57-floor Chinese skyscraper was completed in 19 days

The tower has an office space capacity for 4,000 employees and residential units for 800 households. Screenshot from BSB

With the use of modular pieces, Chinese builder BSB completed a 57-floor mixed-use tower in just 19 days, saying that “three floors in a day is China’s new normal.”

Inhabitat names it “the world’s tallest prefab tower.” Official pictures and a statement are yet to be released.

The tower, called Mini Sky City, is located in Changsha, in the Southeastern Chinese province of Hunan. It is part of the Sky City complex which is to include a 220-story tall skyscraper at 2,749 feet, but is yet to be completed,

According to Sploid, the construction company used 2 million-sf worth of modular blocks they manufactured themselves that are energy efficient. The tightly sealed blocks ensure an efficient use of HVAC systems, as well as protection from outside pollution.

A representative of the company told Sploid "that the use of modules reduced the use of concrete by 15,000 trucks, [which] almost eliminated all the release of dust in the air."

Mini Sky City has 19 atriums that are 33 feet tall each. It has the office space capacity for 4,000 employees, as well as residential units for 800 households.

Read more on Sploid.

 

Related Stories

| Apr 2, 2014

8 tips for avoiding thermal bridges in window applications

Aligning thermal breaks and applying air barriers are among the top design and installation tricks recommended by building enclosure experts.

| Mar 31, 2014

Tips for creating a competitive bid using codes and loads

Landing a project feels like winning a prize, sort of like finding that forgotten $20 bill in the pocket of a pair of jeans you haven’t worn in a while. But living on the “chance” of winning a job isn’t a great way to pay your electric bill. So, how do you swing the chances in your favor?

| Mar 26, 2014

A sales and service showcase

High Plains Equipment, a Case IH dealership in Devils Lake, N.D., constructs a larger facility to better serve its customers.

| Mar 26, 2014

Callison launches sustainable design tool with 84 proven strategies

Hybrid ventilation, nighttime cooling, and fuel cell technology are among the dozens of sustainable design techniques profiled by Callison on its new website, Matrix.Callison.com. 

| Mar 20, 2014

Common EIFS failures, and how to prevent them

Poor workmanship, impact damage, building movement, and incompatible or unsound substrate are among the major culprits of EIFS problems. 

| Mar 19, 2014

Frames: the biggest value engineering tip

In every aspect of a metal building, you can tweak the cost by adjusting the finish, panel thickness, and panel profile. These changes might make a few percentage points difference in the cost. Change the framing and you have the opportunity to affect 10-20 percent savings to the metal building portion of the project.

| Mar 17, 2014

Rem Koolhaas explains China's plans for its 'ghost cities'

China's goal, according to Koolhaas, is to de-incentivize migration into already overcrowded cities. 

| Mar 12, 2014

14 new ideas for doors and door hardware

From a high-tech classroom lockdown system to an impact-resistant wide-stile door line, BD+C editors present a collection of door and door hardware innovations. 

Sponsored | | Mar 10, 2014

A high-performance barn

Bastoni Vineyards replaces a wooden barn with an efficient metal building used for maintenance, storage, and hosting events.

| Feb 14, 2014

Must see: Developer stacks shipping containers atop grain silos to create student housing tower

Mill Junction will house up to 370 students and is supported by 50-year-old grain silos.

boombox1
boombox2
native1

More In Category




Great Solutions

41 Great Solutions for architects, engineers, and contractors

AI ChatBots, ambient computing, floating MRIs, low-carbon cement, sunshine on demand, next-generation top-down construction. These and 35 other innovations make up our 2024 Great Solutions Report, which highlights fresh ideas and innovations from leading architecture, engineering, and construction firms.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021