flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Must see: 57-story modular skyscraper was completed in 19 days

Modular Building

Must see: 57-story modular skyscraper was completed in 19 days

After erecting the mega prefab tower in Changsha, China, modular builder BSB stated, “three floors in a day is China’s new normal.”


By Adilla Menayang, Assistant Digital Content Editor | March 10, 2015
A 57-floor Chinese skyscraper was completed in 19 days

The tower has an office space capacity for 4,000 employees and residential units for 800 households. Screenshot from BSB

With the use of modular pieces, Chinese builder BSB completed a 57-floor mixed-use tower in just 19 days, saying that “three floors in a day is China’s new normal.”

Inhabitat names it “the world’s tallest prefab tower.” Official pictures and a statement are yet to be released.

The tower, called Mini Sky City, is located in Changsha, in the Southeastern Chinese province of Hunan. It is part of the Sky City complex which is to include a 220-story tall skyscraper at 2,749 feet, but is yet to be completed,

According to Sploid, the construction company used 2 million-sf worth of modular blocks they manufactured themselves that are energy efficient. The tightly sealed blocks ensure an efficient use of HVAC systems, as well as protection from outside pollution.

A representative of the company told Sploid "that the use of modules reduced the use of concrete by 15,000 trucks, [which] almost eliminated all the release of dust in the air."

Mini Sky City has 19 atriums that are 33 feet tall each. It has the office space capacity for 4,000 employees, as well as residential units for 800 households.

Read more on Sploid.

 

Related Stories

| Jun 28, 2013

Building owners cite BIM/VDC as 'most exciting trend' in facilities management, says Mortenson report

A recent survey of more than 60 building owners and facility management professionals by Mortenson Construction shows that BIM/VDC is top of mind among owner professionals. 

| Jun 13, 2013

AIA partners with industry groups to launch $30,000 'Designing Recovery' design competition

The program will award a total of $30,000 to three winning designs, divided equally between three locations: Joplin, Mo., New Orleans, and New York. 

| Jun 10, 2013

Lake Washington STEM school combines modular and site-built construction to meet ambitious schedule

When the Lake Washington School District outside Seattle needed a new high school built on an ambitious permitting and construction schedule of seven months, modular construction proved to be an ideal solution.

| Jun 5, 2013

USGBC: Free LEED certification for projects in new markets

In an effort to accelerate sustainable development around the world, the U.S. Green Building Council is offering free LEED certification to the first projects to certify in the 112 countries where LEED has yet to take root.

| Jun 3, 2013

Construction spending inches upward in April

The U.S. Census Bureau of the Department of Commerce announced today that construction spending during April 2013 was estimated at a seasonally adjusted annual rate of $860.8 billion, 0.4 percent above the revised March estimate of $857.7 billion.

| May 30, 2013

The Make It Right squabble: ‘How many trees did you plant today?’

A debate has been raging in the blogosphere over the last few months about an article in The New Republic, “If You Build It, They Might Not Come,” in which staff writer Lydia DePillis took Brad Pitt’s Make It Right Foundation to task for botching its effort to revitalize the Lower Ninth Ward of New Orleans.

| Apr 30, 2013

Tips for designing with fire rated glass - AIA/CES course

Kate Steel of Steel Consulting Services offers tips and advice for choosing the correct code-compliant glazing product for every fire-rated application. This BD+C University class is worth 1.0 AIA LU/HSW.

| Feb 28, 2013

Novel multifamily solutions to be presented at New York Modular Construction Summit

The New York Modular Construction Summit will be co-hosted by the Modular Building Institute and Pratt Institute School of Architecture on May 16, 2013, in Brooklyn, N.Y.

| Feb 22, 2013

Starbucks pilot program rolls out small, modular stores

Coffee giant Starbucks is rolling out mini-stores with maximum local flavor, as part of an international pilot program.

boombox1
boombox2
native1

More In Category




Great Solutions

41 Great Solutions for architects, engineers, and contractors

AI ChatBots, ambient computing, floating MRIs, low-carbon cement, sunshine on demand, next-generation top-down construction. These and 35 other innovations make up our 2024 Great Solutions Report, which highlights fresh ideas and innovations from leading architecture, engineering, and construction firms.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021