flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

My Micro NY will soon be New York's first micro-apartment building

Modular Building

My Micro NY will soon be New York's first micro-apartment building

The Manhattan modular building will be completed in December and will contain apartments with low rents, but small space.


By Mike Chamernik, Associate Editor | October 22, 2015
My Micro NY will soon be New York's first micro-apartment building

The concrete and steel modular units at My Micro NY are currently being stacked and bolted together. Renderings courtesy nArchitects

New York is known for its expensive and cramped living conditions. The city has a solution for one of those stigmas.

My Micro NY, the city's first micro-apartment building, will open shortly after construction is completion in December, Dezeen reports. The nine-story, 35,000-sf modular building is located in Manhattan’s Kips Bay neighborhood and was designed by nArchitects. 

While the median rental price for a one-bedroom apartment elsewhere in Manhattan is a whopping $3,400, market-rate units at My Micro NY start at $2,000. Affordable units will range from $950 to $1,492.

The catch, of course, is that the complex’s 55 units will range from 250 to 370 sf, with 10-foot ceilings. The apartments will have a Juliet balcony, a kitchen, a closet, and a combined living and sleeping area. To get some space, tenants will have access to a gym, lounge, roof terrace, and garden.

The modules are made of steel frames and concrete slabs. They are currently being stacked and bolted together.

My Micro NY also released a trailer for an upcoming documentary on the project.

 

My Micro New York - Trailer from Antti T Seppänen on Vimeo.

Related Stories

| Apr 13, 2012

Best Commercial Modular Buildings Recognized

Judges scored building entries on a number of criteria including architectural excellence, technical innovation, cost effectiveness, energy efficiency, and calendar days to complete, while marketing pieces were judged on strategy, implementation, and quantifiable results. Read More

| Oct 6, 2011

GREENBUILD 2011: Dow Corning features new silicone weather barrier sealant

Modular Design Architecture >Dow Corning 758 sealant used in GreenZone modular high-performance medical facility.

| Sep 29, 2011

Kohler supports 2011 Solar Decathlon competition teams

Modular Architecture > In a quest to create the ultimate ‘green’ house, 20 collegiate teams compete in Washington D.C. Mall.

| Sep 12, 2011

Living Buildings: Are AEC Firms up to the Challenge?

Modular Architecture > You’ve done a LEED Gold or two, maybe even a LEED Platinum. But are you and your firm ready to take on the Living Building Challenge? Think twice before you say yes.

| Sep 9, 2011

$22 million investment made in energy efficient building maker

The buildings use at least 25% less energy than the strictest building codes in the U.S., and as much as 80% less energy in certain parts of the country. 

| Jul 22, 2011

Five award-winning modular innovations

The Modular Building Institute's 2011 Awards of Distinction highlight fresh ideas in manufactured construction projects.

| Mar 11, 2011

Temporary modular building at Harvard targets sustainability

Anderson Anderson Architecture of San Francisco designed the Harvard Yard childcare facility, a modular building manufactured by Triumph Modular of Littleton, Mass., that was installed at Harvard University. The 5,700-sf facility will remain on the university’s Cambridge, Mass., campus for 18 months while the Harvard Yard Child Care Center and the Oxford Street Daycare Coop are being renovated.

| Oct 13, 2010

Prefab Trailblazer

The $137 million, 12-story, 500,000-sf Miami Valley Hospital cardiac center, Dayton, Ohio, is the first major hospital project in the U.S. to have made extensive use of prefabricated components in its design and construction.

| Aug 11, 2010

Morphosis builds 'floating' house for Brad Pitt's Make It Right New Orleans foundation

Morphosis Architects, under the direction of renowned architect and UCLA professor Thom Mayne, has completed the first floating house permitted in the U.S. for Brad Pitt’s Make It Right Foundation in New Orleans.The FLOAT House is a new model for flood-safe, affordable, and sustainable housing that is designed to float securely with rising water levels.

| Aug 11, 2010

Bovis Lend Lease, Webcor among nation's largest multifamily contractors, according to BD+C's Giants 300 report

A ranking of the Top 50 Multifamily Contractors based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants

boombox1
boombox2
native1

More In Category




Great Solutions

41 Great Solutions for architects, engineers, and contractors

AI ChatBots, ambient computing, floating MRIs, low-carbon cement, sunshine on demand, next-generation top-down construction. These and 35 other innovations make up our 2024 Great Solutions Report, which highlights fresh ideas and innovations from leading architecture, engineering, and construction firms.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021