An avalanche of retail closings and bankruptcies, instigated by the coronavirus pandemic and the growing popularity of online shopping, left tens of thousands of stores vacant across the U.S. But at least one market watcher, Coresight Research, recently projected that, for the first time in five years, the 5,083 store openings that retailers announced in 2021 may have topped the 5,079 announced store closings for that year, the lowest number of closings in a half decade.
No one is arguing that retail is a healthy sector yet. But the patient is showing signs of recovery: in its Outlook for the third quarter of 2021, JLL noted that retail sales were tracking upward and that foot traffic in shopping centers was around 25 percent above 2020 levels (a low bar, admittedly). More significantly, JLL also noted that, through the first half of 2021, 41,000 leases representing 121 million sf had been signed. “For the first time since 2017, retailers will open more stores than they close.”
SimonCRE, a national commercial real estate acquisition and development company, is hoping the retail sector can get on a roll again. Among its current developments is Village at Prasada, which the company claims to be the first major power center developed in the western U.S. in over a decade.
Phase 1 of this project, whose construction started last month, will include more than 330,000 sf of retail space. The 250,000-sf Phase 2 is scheduled to begin construction later this year. The cost of developing Village at Prasada is estimated at $500 million, according to SimonCRE.
As of last month, Village at Prasada had commitments for more than 90 percent of its planned space, and had executed leases with retailers such as TJ Maxx, Costco, HomeGoods, Marshalls, Ulta, and PetSmart. The power center will also include a 61,000-sf entertainment concept with bowling and movies called Fat Cats, and a restaurant row that includes local nano-brewery O.H.S.O, and renowned Mexican restaurant Barrio Queen. (Western Retail Advisors is this project’s leasing agent.)
PART OF A MASTER PLAN FOR A BURGEONING SUBURB
The power center is located on 100 acres in Surprise, Ariz., one of metro Phoenix’s fastest-growing suburbs. Village at Prasada is part of a 3,355-acre master plan community by RED Development that will bring medical services, offices, hospitality, 14,000 single-family homes and 360 multifamily units to this market. The power center’s immediate trading area is projected to have a population of 220,029 by 2025, 10 percent more than its estimated population in 2020.
SimonCRE’s involvement in the master plan—which includes the development of two 3- and 4-story multifamily housing projects that will break ground in late 2022 and early 2023—“was borne out of a desire to not only address an unfilled demand for retail in Phoenix’s West Valley, but to be trendsetters by building something bold and new,” said Joshua Simon, CEO and founder of SimonCRE, in a prepared statement.
In an email to BD+C, the company elaborated that it “could see” a “strong enough” need for this kind of outdoor mall, corroborated by a poll of 5,100 residents who specifically requested several of the tenants that will lease space at Village at Prasada.
The Building Team on this project includes Suite 6 Architecture + Planning and Upward Architects (renderings), RKAA Architects, Upward Architects, ADA Architects Inc., HDJ Architects, and Architectural Design Guild (architects), Olsson Engineers, Cypress Civil Engineers, Bowman Consulting (engineers), and Haydon and Stout Building Contractors (GCs).
SimonCRE is slated to complete about 600,000 sf of retail space in greater Phoenix over the next two years, and has more than 1.2 million sf of retail space under development nationally.
Related Stories
| Feb 11, 2011
Chicago high-rise mixes condos with classrooms for Art Institute students
The Legacy at Millennium Park is a 72-story, mixed-use complex that rises high above Chicago’s Michigan Avenue. The glass tower, designed by Solomon Cordwell Buenz, is mostly residential, but also includes 41,000 sf of classroom space for the School of the Art Institute of Chicago and another 7,400 sf of retail space. The building’s 355 one-, two-, three-, and four-bedroom condominiums range from 875 sf to 9,300 sf, and there are seven levels of parking. Sky patios on the 15th, 42nd, and 60th floors give owners outdoor access and views of Lake Michigan.
| Feb 11, 2011
Grocery store anchors shopping center in Miami arts/entertainment district
18Biscayne is a 57,200-sf urban retail center being developed in downtown Miami by commercial real estate firm Stiles. Construction on the three-story center is being fast-tracked for completion in early 2012. The project is anchored by a 49,200-sf Publix market with bakery, pharmacy, and café with outdoor seating. An additional 8,000 sf of retail space will front Biscayne Boulevard. The complex is in close proximity to the Adrienne Arsht Center for the Performing Arts, the downtown Miami entertainment district, and the Omni neighborhood, one of the city’s fast-growing residential areas.
| Feb 11, 2011
Apartment complex caters to University of Minnesota students
Twin Cities firm Elness Swenson Graham Architects designed the new Stadium Village Flats, in the University of Minnesota’s East Bank Campus, with students in mind. The $30 million, six-story residential/retail complex will include 120 furnished apartments with fitness rooms and lounges on each floor. More than 5,000 sf of first-floor retail space and two levels of below-ground parking will complete the complex. Opus AE Group Inc., based in Minneapolis, will provide structural engineering services.
| Feb 11, 2011
Green design, white snow at Egyptian desert retail complex
The Mall of Egypt will be a 135,000-sm retail and entertainment complex in Cairo’s modern 6th of October district. The two-story center is divided into three themed zones—The City, which is arranged as a series of streets lined with retail and public spaces; The Desert Valley, which contains upscale department stores, international retailers, and a central courtyard for music and other cultural events; and The Crystal, which will include leisure and entertainment venues, including a cinema and indoor snow park. RTKL is designing the massive complex to LEED Silver standards.
| Jan 25, 2011
AIA reports: Hotels, retail to lead U.S. construction recovery
U.S. nonresidential construction activity will decline this year but recover in 2012, led by hotel and retail sectors, according to a twice-yearly forecast by the American Institute of Architects. Overall nonresidential construction spending is expected to fall by 2% this year before rising by 5% in 2012, adjusted for inflation. The projected decline marks a deteriorating outlook compared to the prior survey in July 2010, when a 2011 recovery was expected.
| Jan 21, 2011
Harlem facility combines social services with retail, office space
Harlem is one of the first neighborhoods in New York City to combine retail with assisted living. The six-story, 50,000-sf building provides assisted living for residents with disabilities and a nonprofit group offering services to minority groups, plus retail and office space.
| Jan 21, 2011
Revamped hotel-turned-condominium building holds on to historic style
The historic 89,000-sf Hotel Stowell in Los Angeles was reincarnated as the El Dorado, a 65-unit loft condominium building with retail and restaurant space. Rockefeller Partners Architects, El Segundo, Calif., aimed to preserve the building’s Gothic-Art Nouveau combination style while updating it for modern living.
| Jan 19, 2011
Baltimore mixed-use development combines working, living, and shopping
The Shoppes at McHenry Row, a $117 million mixed-use complex developed by 28 Walker Associates for downtown Baltimore, will include 65,000 sf of office space, 250 apartments, and two parking garages. The 48,000 sf of main street retail space currently is 65% occupied, with space for small shops and a restaurant remaining.
| Jan 7, 2011
BIM on Target
By using BIM for the design of its new San Clemente, Calif., store, big-box retailer Target has been able to model the entire structural steel package, including joists, in 3D, chopping the timeline for shop drawings from as much as 10 weeks down to an ‘unheard of’ three-and-a-half weeks.
| Jan 7, 2011
Mixed-Use on Steroids
Mixed-use development has been one of the few bright spots in real estate in the last few years. Successful mixed-use projects are almost always located in dense urban or suburban areas, usually close to public transportation. It’s a sign of the times that the residential component tends to be rental rather than for-sale.