flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

NBA’s Atlanta Hawks to build new practice center with attached medical facilities

Sports and Recreational Facilities

NBA’s Atlanta Hawks to build new practice center with attached medical facilities

The team will have easy access to an MRI machine, 3D motion capture equipment, and in-ground hydrotherapy. 


By Mike Chamernik, Associate Editor | May 6, 2016
NBA’s Atlanta Hawks to build new practice center with attached medical facilities

The Atlanta Hawks new practice facility in Brookhaven, Ga. Rendering courtesy HOK.

As recently as the early-1990s, NBA teams would practice at local college gyms. Just imagine, high-profile, multimillion dollar athletes working on their post-up games and pick-and-roll defense on the creaky floors and shaky backboards at Northwest Backwater U.

Eventually teams got their own practice facilities, and now teams are building state-of-the-art complexes filled with practice courts, locker rooms, fitness centers, hydrotherapy pools, dining halls, and medical and training rooms.

Everything is top-of-the-line, too. Teams want to make sure their players are happy, rested, and physically fit. Teams also use the facilities as a way to lure free agents, to make their team a place where the league’s best players want to play.

The Atlanta Hawks are shaping up to become one of those teams. The Hawks and Emory Healthcare and partnering to build a 90,000-sf training and sports medicine center in Brookhaven, Ga

The building, designed by HOK, will be the NBA’s first practice facility to be located within a sports medicine center. The arrangement allows for immediate treatment and on-site access to advanced medical technology, like the 3 Tesla MRI, a body scanner that can detect injuries from bruises to torn ligaments. Emory will use 30,000 sf of the building for sports training and preventive and rehabilitative treatment.

The facility will also have equipment for 3D motion capture, cryotherapy, sensory deprivation, and in-ground hydrotherapy. Hawks players will receive training services from sports science company P3. 

“By blending research, sports medicine, healthcare and training into one building, the Atlanta Hawks and Emory Healthcare will change the way the industry approaches athletic training and injury prevention,” George Heinlein, a Regional Rirector of HOK’s Sports + Recreation + Entertainment practice, said in a statement. “We have brought together HOK’s multidisciplinary leaders in healthcare, science and technology, and sports facility design to elevate the training experience and create a new model for professional and collegiate athletics.”

Construction will begin this summer, and the building will open in the fall of 2017, before the NBA season begins. The privately-funded center will cost roughly $50 million.

The Hawks currently practice in an auxiliary gym at their home at Philips Arena.

Related Stories

| Aug 26, 2013

Chicago Bears kick off season at renovated Halas Hall

An upgraded locker room, expanded weight room, and updated dining room with an outdoor patio greeted the Chicago Bears when they arrived at Halas Hall for practice this month. The improvements are part of a major expansion and renovation of the Bears’ headquarters in Lake Forest, Ill., completed by Mortenson Construction in less than seven months.

| Aug 22, 2013

Sports Facility Report [2013 Giants 300 Report]

Building Design+Construction's rankings of the nation's largest sports facility design and construction firms, as reported in the 2013 Giants 300 Report.

| Aug 22, 2013

Energy-efficient glazing technology [AIA Course]

This course discuses the latest technological advances in glazing, which make possible ever more efficient enclosures with ever greater glazed area.

| Aug 20, 2013

First look: $550 million Billie Jean King National Tennis Center renovation

The United States Tennis Association has announced its plans for a sweeping transformation of the USTABillie Jean King National Tennis Center that will include the construction of two new stadiums, as well as a retractable roof over Arthur Ashe Stadium.  The transformation will be implemented in three phases to begin at the conclusion of the 2013 US Open, with the goal of overall completion by the 2018 US Open.

| Aug 14, 2013

Green Building Report [2013 Giants 300 Report]

Building Design+Construction's rankings of the nation's largest green design and construction firms. 

| Aug 13, 2013

USGBC joins forces with Green Sports Alliance to promote sustainable venues

The U.S. Green Building Council (USGBC) has announced a collaboration with the Green Sports Alliance, a prominent nonprofit organization supporting the development and promotion of green building initiatives in professional and collegiate sports.

| Jul 29, 2013

2013 Giants 300 Report

The editors of Building Design+Construction magazine present the findings of the annual Giants 300 Report, which ranks the leading firms in the AEC industry.

| Jul 19, 2013

Renovation, adaptive reuse stay strong, providing fertile ground for growth [2013 Giants 300 Report]

Increasingly, owners recognize that existing buildings represent a considerable resource in embodied energy, which can often be leveraged for lower front-end costs and a faster turnaround than new construction.

| Jul 3, 2013

World's biggest freestanding building opens in China

Measuring a stout 100 meters high, 500 meters long, and 400 meters wide, the New Century Global Centre in the Tianfu New District of Chengdu, China, is officially the world's largest freestanding building.

| Jul 3, 2013

Mall of America will double in size after $2.5 billion expansion

The nation's largest indoor mall will undergo a $2.5 billion, 10-year expansion project that will add attractions like an NHL-sized skating rink and an indoor water park. 

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021