As recently as the early-1990s, NBA teams would practice at local college gyms. Just imagine, high-profile, multimillion dollar athletes working on their post-up games and pick-and-roll defense on the creaky floors and shaky backboards at Northwest Backwater U.
Eventually teams got their own practice facilities, and now teams are building state-of-the-art complexes filled with practice courts, locker rooms, fitness centers, hydrotherapy pools, dining halls, and medical and training rooms.
Everything is top-of-the-line, too. Teams want to make sure their players are happy, rested, and physically fit. Teams also use the facilities as a way to lure free agents, to make their team a place where the league’s best players want to play.
The Atlanta Hawks are shaping up to become one of those teams. The Hawks and Emory Healthcare and partnering to build a 90,000-sf training and sports medicine center in Brookhaven, Ga.
The building, designed by HOK, will be the NBA’s first practice facility to be located within a sports medicine center. The arrangement allows for immediate treatment and on-site access to advanced medical technology, like the 3 Tesla MRI, a body scanner that can detect injuries from bruises to torn ligaments. Emory will use 30,000 sf of the building for sports training and preventive and rehabilitative treatment.
The facility will also have equipment for 3D motion capture, cryotherapy, sensory deprivation, and in-ground hydrotherapy. Hawks players will receive training services from sports science company P3.
“By blending research, sports medicine, healthcare and training into one building, the Atlanta Hawks and Emory Healthcare will change the way the industry approaches athletic training and injury prevention,” George Heinlein, a Regional Rirector of HOK’s Sports + Recreation + Entertainment practice, said in a statement. “We have brought together HOK’s multidisciplinary leaders in healthcare, science and technology, and sports facility design to elevate the training experience and create a new model for professional and collegiate athletics.”
Construction will begin this summer, and the building will open in the fall of 2017, before the NBA season begins. The privately-funded center will cost roughly $50 million.
The Hawks currently practice in an auxiliary gym at their home at Philips Arena.
Related Stories
| Jun 14, 2012
Minnesota Vikings stadium plan gets legislative go-ahead
Legislation that approved the construction of a new billion dollar stadium for the Minnesota Vikings passed the Minnesota legislature.
| Jun 8, 2012
Chestnut Hill College dedicates Jack and Rosemary Murphy Gulati complex
Casaccio Yu Architects designed the 11,300-sf fitness and social complex.
| Jun 1, 2012
New BD+C University Course on Insulated Metal Panels available
By completing this course, you earn 1.0 HSW/SD AIA Learning Units.
| May 30, 2012
Hill International to manage construction of Al Risafa Stadium in Iraq
The three-year contract has an estimated value to Hill of approximately $3.3 million.
| May 29, 2012
Reconstruction Awards Entry Information
Download a PDF of the Entry Information at the bottom of this page.
| May 24, 2012
2012 Reconstruction Awards Entry Form
Download a PDF of the Entry Form at the bottom of this page.
| May 16, 2012
AEG releases 3D video of L.A.'s Farmers Field
The Los Angeles Convention Center footage depicts the new convention center hall spaces, including a new lobby above Pico Boulevard, pre-function space, and what will be the largest multi-purpose ballroom in Los Angeles.
| May 7, 2012
2012 BUILDING TEAM AWARDS: TD Ameritrade Park
The new stadium for the College World Series in Omaha combines big-league amenities within a traditional minor league atmosphere.
| Apr 6, 2012
Perkins Eastman unveils Qatar mixed-use sports complex
Home stadium for Lekhwiya Club a vibrant addition to Doha’s architectural identity.
| Mar 6, 2012
EwingCole completes first design-build project for the USMA
The second phase of the project, which includes the academic buildings and the lacrosse and football fields, was completed in January 2012.