As recently as the early-1990s, NBA teams would practice at local college gyms. Just imagine, high-profile, multimillion dollar athletes working on their post-up games and pick-and-roll defense on the creaky floors and shaky backboards at Northwest Backwater U.
Eventually teams got their own practice facilities, and now teams are building state-of-the-art complexes filled with practice courts, locker rooms, fitness centers, hydrotherapy pools, dining halls, and medical and training rooms.
Everything is top-of-the-line, too. Teams want to make sure their players are happy, rested, and physically fit. Teams also use the facilities as a way to lure free agents, to make their team a place where the league’s best players want to play.
The Atlanta Hawks are shaping up to become one of those teams. The Hawks and Emory Healthcare and partnering to build a 90,000-sf training and sports medicine center in Brookhaven, Ga.
The building, designed by HOK, will be the NBA’s first practice facility to be located within a sports medicine center. The arrangement allows for immediate treatment and on-site access to advanced medical technology, like the 3 Tesla MRI, a body scanner that can detect injuries from bruises to torn ligaments. Emory will use 30,000 sf of the building for sports training and preventive and rehabilitative treatment.
The facility will also have equipment for 3D motion capture, cryotherapy, sensory deprivation, and in-ground hydrotherapy. Hawks players will receive training services from sports science company P3.
“By blending research, sports medicine, healthcare and training into one building, the Atlanta Hawks and Emory Healthcare will change the way the industry approaches athletic training and injury prevention,” George Heinlein, a Regional Rirector of HOK’s Sports + Recreation + Entertainment practice, said in a statement. “We have brought together HOK’s multidisciplinary leaders in healthcare, science and technology, and sports facility design to elevate the training experience and create a new model for professional and collegiate athletics.”
Construction will begin this summer, and the building will open in the fall of 2017, before the NBA season begins. The privately-funded center will cost roughly $50 million.
The Hawks currently practice in an auxiliary gym at their home at Philips Arena.
Related Stories
| May 16, 2013
Chicago unveils $1.1 billion plan for DePaul arena, Navy Pier upgrades
Hoping to send a loud message that Chicago is serious about luring tourism and entertainment spending, Mayor Rahm Emanuel has released details of two initiatives that have been developing for more than a year and that it says will mean $1.1 billion in investment in the McCormick Place and Navy Pier areas.
| May 7, 2013
First look: Golden State Warriors stadium by Snøhetta, AECOM
Architects Snøhetta and AECOM have revealed their latest renderings of a new stadium for NBA basketball team the Golden State Warriors on the waterfront in San Francisco.
| May 2, 2013
Holl-designed Campbell Sports Center completed at Columbia
Steven Holl Architects celebrates the completion of the Campbell Sports Center, Columbia University’s new training and teaching facility.
| Apr 30, 2013
Tips for designing with fire rated glass - AIA/CES course
Kate Steel of Steel Consulting Services offers tips and advice for choosing the correct code-compliant glazing product for every fire-rated application. This BD+C University class is worth 1.0 AIA LU/HSW.
| Apr 26, 2013
BIG tapped to design Europa City in suburban Paris
Danish architecture firm, BIG - led by Bjarke Ingels – has been announced as the winner of an international invited competition for the design of Europa City, a 800,000 square meter cultural, recreational and retail development in Triangle de Gonesse, France.
| Apr 24, 2013
Los Angeles may add cool roofs to its building code
Los Angeles Mayor Antonio Villaraigosa wants cool roofs added to the city’s building code. He is also asking the Department of Water and Power (LADWP) to create incentives that make it financially attractive for homeowners to install cool roofs.
| Apr 12, 2013
Chicago rail conversion puts local twist on High Line strategy
Plans are moving forward to convert an unused, century-old Chicago rail artery to a 2.7 mile, 13 acre recreational facility and transit corridor.
Building Enclosure Systems | Mar 13, 2013
5 novel architectural applications for metal mesh screen systems
From folding façades to colorful LED displays, these fantastical projects show off the architectural possibilities of wire mesh and perforated metal panel technology.
| Mar 5, 2013
Recycled recreation: Waste-to-energy plant combines with ski resort
A new project near Copenhagen pushes the boundaries of the term "mixed use," combining a waste-to-energy plant with a ski resort.