flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

New arts venue reinvigorates Virginia Tech's campus

Building Team Awards

New arts venue reinvigorates Virginia Tech's campus

The STV-led Building Team creates a world-class performance and arts venue with learning and entrepreneurial dimensions.


By John Caulfield, Senior Editor | April 10, 2015
New arts venue reinvigorates Virginia Tech's campus

The new arts venue at Virginia Tech is the ninth building on campus to be LEED-certified. Jeff Goldberg/Esto Photographics Inc.

This article first appeared in the April 2015 issue of BD+C.

The Moss Arts Center—named in honor of the landscape painter Patricia Buckley Moss—is the ninth building on Virginia Tech’s Blacksburg campus to be LEED certified, and its fourth LEED Gold. Ninety-six percent of construction waste was diverted from landfills. Sixty percent of the wood products used were Forest Stewardship Council–certified. Water use was reduced 40%. The complex was incorporated into the rolling hillside to diminish its overall mass.

Shultz Hall, an old dining facility, was gutted and converted into a new arts center outfitted with performance, research, production, and education spaces. Two new additions, totaling 72,550 sf, encompass the 1,274-seat Anne and Ellen Fife Theatre and the Collaborative Performance Lab, known as “The Cube.”

The Cube, originally designed as a four-story black box theater, evolved into a research space with performance, rehearsal, and audience areas surrounded by technical galleries. A motion-capture system and a sophisticated array of 150-plus speakers let researchers create virtual environments, explore 3D renderings of large objects, and work on advanced acoustical research.

The renovated Schulz Hall’s low-velocity ductwork and underfloor air distribution system control noise. The theater is within the Street and Davis Performance Hall, which features an expansive structural glass and aluminum curtain wall system. 

The Fife Theatre’s HVAC system includes hundreds of diffuser cores located in the concrete slab beneath the theater seating. Holder Construction developed a Revit model to communicate the diffuser core layout accurately to subcontractors, to reduce interference among the trades.

The Moss Arts Center also houses the Institute for Creativity, Arts, and Technology, a research enterprise focused on the intersection of science, engineering, arts, and design. 

PROJECT SUMMARY
BRONZE AWARD

Moss Arts Center, Virginia Polytechnic Institute and State University
Blacksburg, Va.

BUILDING TEAM
Submitting firm: STV (executive architect,MEP, SE, CM)
Owner/developer: Virginia Polytechnic Institute and State University
Signature design architect, interior design, landscape design: Snøhetta
Civil engineer: Thompson and Litton
Acoustic, performance sound, A/V: Arup
Theater design: Theatre Projects
Lighting design: Tillotson
Cost consultant: Davis Langdon
Hazardous materials survey: ECS Mid Atlantic
Third-party construction supervision: MBP
General contractor: Holder Corporation

GENERAL INFORMATION
Project size: 150,000 sf
Construction cost: $95 million
Construction period: September 2010 to January 2014
Delivery method: Contractor GMP

Related Stories

Giants 400 | Aug 11, 2021

BD+C Awards Programs

Entry information and past winners for Building Design+Construction's two major awards programs: 40 Under 40 and Giants 400

Building Team Awards | Mar 12, 2021

2021 Building Team Awards Entry Information

Only new construction projects completed on or after January 1, 2020 are eligible. Deadline for submissions: May 14, 2021.

Building Team Awards | Mar 12, 2021

Deadline extended for the 2021 Building Team Awards

BD+C's Building Team Awards is the industry's only recognition program to honor projects that achieve excellence in both design/construction and collaboration of the AEC/O team. Deadline for entries: May 14, 2021.

Building Team Awards | Nov 4, 2020

12 projects earn BD+C's 2020 Building Team Awards

The Statue of Liberty Museum, Allianz Field, and the Long Beach Civic Center are three of the projects awarded with BD+C's 2020 Building Team Awards.

Building Team Awards | Nov 3, 2020

Birmingham's haven for the homeless

A coalition of ministries raised millions to build a new home for homeless men in Alabama’s largest city. The Firehouse Shelter wins Honorable Mention in the 2020 Building Team Awards.

Building Team Awards | Nov 2, 2020

It's back to the future for this contractor

Poettker Construction’s new headquarters in rural Breese, Ill., is recognized with a Bronze Award in BD+C’s 2020 Building Team Awards.

Building Team Awards | Nov 2, 2020

Long Beach gets a municipal marvel

The Long Beach Civic Center is honored with a Bronze Award in the 2020 Building Team Awards.  

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021