The Moss Arts Center—named in honor of the landscape painter Patricia Buckley Moss—is the ninth building on Virginia Tech’s Blacksburg campus to be LEED certified, and its fourth LEED Gold. Ninety-six percent of construction waste was diverted from landfills. Sixty percent of the wood products used were Forest Stewardship Council–certified. Water use was reduced 40%. The complex was incorporated into the rolling hillside to diminish its overall mass.
Shultz Hall, an old dining facility, was gutted and converted into a new arts center outfitted with performance, research, production, and education spaces. Two new additions, totaling 72,550 sf, encompass the 1,274-seat Anne and Ellen Fife Theatre and the Collaborative Performance Lab, known as “The Cube.”
The Cube, originally designed as a four-story black box theater, evolved into a research space with performance, rehearsal, and audience areas surrounded by technical galleries. A motion-capture system and a sophisticated array of 150-plus speakers let researchers create virtual environments, explore 3D renderings of large objects, and work on advanced acoustical research.
The renovated Schulz Hall’s low-velocity ductwork and underfloor air distribution system control noise. The theater is within the Street and Davis Performance Hall, which features an expansive structural glass and aluminum curtain wall system.
The Fife Theatre’s HVAC system includes hundreds of diffuser cores located in the concrete slab beneath the theater seating. Holder Construction developed a Revit model to communicate the diffuser core layout accurately to subcontractors, to reduce interference among the trades.
The Moss Arts Center also houses the Institute for Creativity, Arts, and Technology, a research enterprise focused on the intersection of science, engineering, arts, and design.
PROJECT SUMMARY
BRONZE AWARD
Moss Arts Center, Virginia Polytechnic Institute and State University
Blacksburg, Va.
BUILDING TEAM
Submitting firm: STV (executive architect,MEP, SE, CM)
Owner/developer: Virginia Polytechnic Institute and State University
Signature design architect, interior design, landscape design: Snøhetta
Civil engineer: Thompson and Litton
Acoustic, performance sound, A/V: Arup
Theater design: Theatre Projects
Lighting design: Tillotson
Cost consultant: Davis Langdon
Hazardous materials survey: ECS Mid Atlantic
Third-party construction supervision: MBP
General contractor: Holder Corporation
GENERAL INFORMATION
Project size: 150,000 sf
Construction cost: $95 million
Construction period: September 2010 to January 2014
Delivery method: Contractor GMP
Related Stories
Building Team Awards | Nov 2, 2020
Fans come first at Allianz Field
The new home of the Minnesota United soccer club wins a Silver Award in BD+C’s 2020 Building Team Awards.
Building Team Awards | Oct 24, 2020
Emory University Student Center wins the top award in 2020 Building Team Awards
Emory University Student Center wins the top award in 2020 Building Team Awards
Building Team Awards | Oct 22, 2020
Look up to the skies
The Mori Hosseini Student Union at Embry-Riddle Aeronautical University takes home a Silver Award in the 2020 Building Team Awards.
Building Team Awards | Oct 22, 2020
Judging a book by its cover
The New York Presbyterian David H. Koch Center wins a Silver Award in BD+C’s 2020 Building Team Awards.
Building Team Awards | Oct 21, 2020
Big Room equals big results
Tucson’s Banner University Medical Center is honored with a Gold Award in the 2020 Building Team Awards.
Building Team Awards | Oct 21, 2020
New York’s STEM epicenter and career gateway
The CUNY New York City College of Technology Academic Building wins a Gold Award in BD+C’s 2020 Building Team Awards.
Building Team Awards | Oct 20, 2020
Seamless speed to market drives Texas hospital’s growth
Learn why the Methodist Richardson Medical Center Vertical Expansion, in Richardson, Texas, was honored with a Gold Award in the 2020 Building Team Awards.
Building Team Awards | Oct 20, 2020
Winning with teamwork
The new home of the NBA’s Golden State Warriors, Chase Center, is honored with a Gold Award in the 2020 Building Team Awards.
Coronavirus | Oct 8, 2020
The Weekly show: Statue of Liberty Museum, emotional learning in K-12, LA's climate change vulnerability
The October 8 episode of BD+C's "The Weekly" is available for viewing on demand.