The Moss Arts Center—named in honor of the landscape painter Patricia Buckley Moss—is the ninth building on Virginia Tech’s Blacksburg campus to be LEED certified, and its fourth LEED Gold. Ninety-six percent of construction waste was diverted from landfills. Sixty percent of the wood products used were Forest Stewardship Council–certified. Water use was reduced 40%. The complex was incorporated into the rolling hillside to diminish its overall mass.
Shultz Hall, an old dining facility, was gutted and converted into a new arts center outfitted with performance, research, production, and education spaces. Two new additions, totaling 72,550 sf, encompass the 1,274-seat Anne and Ellen Fife Theatre and the Collaborative Performance Lab, known as “The Cube.”
The Cube, originally designed as a four-story black box theater, evolved into a research space with performance, rehearsal, and audience areas surrounded by technical galleries. A motion-capture system and a sophisticated array of 150-plus speakers let researchers create virtual environments, explore 3D renderings of large objects, and work on advanced acoustical research.
The renovated Schulz Hall’s low-velocity ductwork and underfloor air distribution system control noise. The theater is within the Street and Davis Performance Hall, which features an expansive structural glass and aluminum curtain wall system.
The Fife Theatre’s HVAC system includes hundreds of diffuser cores located in the concrete slab beneath the theater seating. Holder Construction developed a Revit model to communicate the diffuser core layout accurately to subcontractors, to reduce interference among the trades.
The Moss Arts Center also houses the Institute for Creativity, Arts, and Technology, a research enterprise focused on the intersection of science, engineering, arts, and design.
PROJECT SUMMARY
BRONZE AWARD
Moss Arts Center, Virginia Polytechnic Institute and State University
Blacksburg, Va.
BUILDING TEAM
Submitting firm: STV (executive architect,MEP, SE, CM)
Owner/developer: Virginia Polytechnic Institute and State University
Signature design architect, interior design, landscape design: Snøhetta
Civil engineer: Thompson and Litton
Acoustic, performance sound, A/V: Arup
Theater design: Theatre Projects
Lighting design: Tillotson
Cost consultant: Davis Langdon
Hazardous materials survey: ECS Mid Atlantic
Third-party construction supervision: MBP
General contractor: Holder Corporation
GENERAL INFORMATION
Project size: 150,000 sf
Construction cost: $95 million
Construction period: September 2010 to January 2014
Delivery method: Contractor GMP
Related Stories
Building Team Awards | Jun 14, 2017
17 projects earn BD+C's 2017 Building Team Awards
Of the 17 projects, one received a Platinum Award, six received Gold Awards, six received Silver Awards, two received Bronze Awards, and two received Honorable Mentions.
Building Team Awards | Jun 14, 2017
3D-printed office: Office of the Future
Dubai kicks off 3D-printing tech initiative with a novel office project.
Building Team Awards | Jun 14, 2017
A space for all: Lighthouse for the Blind and Visually Impaired
Nonprofit HQ fitout improves functionality, accessibility for blind and low-vision individuals.
Building Team Awards | Jun 13, 2017
Government campus reimagined: Intelligence Community Campus
Building Team converts 1940s campus into a sleek, modern home for U.S. intelligence agencies.
Building Team Awards | Jun 13, 2017
Secluded sanctuary: Alnoba leadership training center
Leadership training center becomes New England’s first Passive House building.
Building Team Awards | Jun 12, 2017
Circles and squares: Faena Arts Center
Silver Award: The Faena Arts Center’s forum is divided into two volumes, one a cylinder, the other a cube.
Building Team Awards | Jun 12, 2017
The right prescription: University of North Dakota School of Medicine & Health Sciences
Silver Award: North Dakota builds a new medical/health sciences school to train and retain more physicians.
Building Team Awards | Jun 12, 2017
Texas technopark: TechnipFMC John T. Gremp Campus
Silver Award: TechnipFMC’s new campus marks the start of a massive planned community in north Houston.
Building Team Awards | Jun 8, 2017
Quick turnaround: Partners HealthCare
Silver Award: A 2½-year project brings Partners HealthCare’s sprawling administrative functions under one roof.
Building Team Awards | Jun 8, 2017
Raising the bar: Zurich North American Headquarters
Silver Award: Forgoing a typical center-core design, the Zurich North America Headquarters rises 11 stories across three stacked bars.