flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

New Indiana Toll Road headquarters creates unified environment for staff

Government Buildings

New Indiana Toll Road headquarters creates unified environment for staff

New LEED Gold facility consolidates operations for tollway authority.


By SMITHGROUP | November 25, 2020
Indiana Toll Road's LEED Gold Administration and Operations Building

Indiana Toll Road's LEED Gold Administration and Operations Building. Photo courtesy SmithGroup

  

The 25,000-sf Indiana Toll Road Administrative and Operations Building is the epicenter for 157 miles of toll road monitoring, maintenance, and administration.

Having previously operated out of a maintenance garage, the client sought to consolidate its administrative functions into one building that would improve the efficiency of its operations and the work environment of its employees.

The new LEED Gold facility features open office seating and a large control room to monitor road conditions and roadway accidents. A central, two-story atrium functions
as the building’s hearth both programmatically as the primary amenity and gathering space, and performatively as a warm winter solarium and shaded collaboration space in the summer.

 

IN tollway Atrium.jpgAtrium at the new Indiana Toll Road headquarters provides space for employees to relax. Photo: Courtesy SmithGroup

 

SMITHGROUP LEADS INTEGRATED PROJECT TEAM

SmithGroup (architect, interior designer, civil engineer, landscape architect) led the functionally integrated team of TGWRA (structural engineer), Primera Engineers (MEP), Baumann Consulting (commissioning), and HJ Kessler (LEED consultant).

The atrium prioritizes employee well-being by bringing natural light into the floorplate. Ample reflective materials create bright spaces free of glare.

A mix of open collaborative zones, lounge areas, meeting rooms, standing desks, and bench seating offer options for both collaborative and individual work.

A large central stair with sculptural detailing and warm wood accents creates an informal gathering area.

IN toolway summer section.jpg

Summer section shows environmental considerations that went into LEED Gold certification. Image: SmithGroup

 

IN toolway winter section.jpg

Winter section for solarium and office areas with environmental components. Image: SmithGroup

 

CAREFUL ATTENTION TO NATURAL SETTING

The facility lies in a young woodland site, with sprawling grasses and mid-density trees surrounded by a toll road clover loop. The project team left 80% of the site untouched, but excavated the site to create water basins and sculpted landforms. The result: a naturalized landscape that holds water onsite and requires no additional irrigation.

A gravel pedestrian path meanders through the site, and photovoltaic solar panels generate more than 40% of the building’s energy needs.

Employees also have access to an indoor workout room and a second-story terrace.

 

IN Toll Road EXT day.png

Related Stories

Government Buildings | Jun 30, 2021

The FBI Innovation Center breaks ground in Huntsville, Ala.

HKS and Clark Construction are the design-build team for the project.

Government Buildings | Jun 30, 2021

Singapore’s new courthouse is set up for all to see

The project’s architect has released more details about its design, 18 months after it opened.

Resiliency | Jun 24, 2021

Oceanographer John Englander talks resiliency and buildings [new on HorizonTV]

New on HorizonTV, oceanographer John Englander discusses his latest book, which warns that, regardless of resilience efforts, sea levels will rise by meters in the coming decades. Adaptation, he says, is the key to future building design and construction.

Digital Twin | May 24, 2021

Digital twin’s value propositions for the built environment, explained

Ernst & Young’s white paper makes its cases for the technology’s myriad benefits.

Government Buildings | Mar 4, 2021

A new animal services center in California reflects current care trends

The Center includes the region’s only place set up to shelter and rehab large livestock.

Government Buildings | Feb 26, 2021

Design unveiled for federal courthouse in Huntsville, Ala.

Fentress Architects is designing the facility in collaboration with Studio Scarab Architecture Interiors Planning and Payne Design Group Architects.

Market Data | Feb 24, 2021

2021 won’t be a growth year for construction spending, says latest JLL forecast

Predicts second-half improvement toward normalization next year.

Government Buildings | Feb 9, 2021

The New Johnson County Courthouse opens in Olathe, Kan.

Fentress Architects, in collaboration with TreanorHL, designed the project.

Government Buildings | Feb 1, 2021

U.S. Embassy in New Delhi breaks ground on expansion

Weiss/Manfredi is designing the project.

boombox1
boombox2
native1

More In Category

Sustainable Design and Construction

Northglenn, a Denver suburb, opens a net zero, all-electric city hall with a mass timber structure

Northglenn, Colo., a Denver suburb, has opened the new Northglenn City Hall—a net zero, fully electric building with a mass timber structure. The 32,600-sf, $33.7 million building houses 60 city staffers. Designed by Anderson Mason Dale Architects, Northglenn City Hall is set to become the first municipal building in Colorado, and one of the first in the country, to achieve the Core certification: a green building rating system overseen by the International Living Future Institute.


Government Buildings

OSHA’s proposed heat standard published in Federal Register

The Occupational Safety and Health Administration (OSHA) has published a proposed standard addressing heat illness in outdoor and indoor settings in the Federal Register. The proposed rule would require employers to evaluate workplaces and implement controls to mitigate exposure to heat through engineering and administrative controls, training, effective communication, and other measures.



Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021