flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

New Nashville mixed-use high-rise features curved, stepped massing and wellness focus

Mixed-Use

New Nashville mixed-use high-rise features curved, stepped massing and wellness focus

Designed by Goettsch Partners, the Class A office and retail building is sited on a uniquely shaped lot.


By Peter Fabris, Contributing Editor | April 7, 2023
Construction recently started on 5 City Blvd, a 15-story office and mixed-use building in Nashville. Rendering courtesy Goettsch Partners
Rendering courtesy Goettsch Partners

Construction recently started on 5 City Blvd, a new 15-story office and mixed-use building in Nashville, Tenn. Located on a uniquely shaped site, the 730,000-sf, high-rise structure features curved, stepped massing and amenities with a focus on wellness.

The building contains 350,000 sf of Class A office space, 15,000 sf of ground-floor retail, and parking with more than 900 stalls across multiple levels. A variety of floor plates cater to different tenant needs.

The building appears to “peel and unfold” along the eastern façade, echoing the site’s geometry while creating a series of large-scale stepped terraces that provide outdoor amenity spaces with unobstructed views of the Nashville skyline.

High-performance, floor-to-ceiling glass is used throughout all commercial spaces. Copper-toned vertical fins provide passive shading while referencing the coloring of the native clay found on the site.

Construction recently started on 5 City Blvd, a 15-story office and mixed-use building in Nashville. Rendering courtesy Goettsch Partners
Rendering courtesy Goettsch Partners

“Challenging sites often lead to memorable design solutions,” says Paul De Santis, Assoc. AIA, LEED AP, Partner and Co-Design Director with Goettsch Partners (GP), designers of the project. “The design for 5 City Blvd strives to balance sculptural expression with pragmatic planning.”

Retail spaces along the base contribute to a pedestrian-friendly environment within a larger development that provides an active streetscape. The southeast corner of the parcel has been left open to create a new plaza that forms the symbolic heart of the community. Accessed by boutique retail and office users alike, the plaza will be an active, light-filled, and creatively landscaped space.

Designed to achieve LEED and Wired standards, the project is intended to attract users who are seeking a healthy and technologically advanced work environment, according to a GP news release. The project is slated for completion in the fall of 2024.

On the building team:
Owner and/or developer: Convexity Properties
Design architect/Architect of record: Goettsch Partners
MEP engineer: I.C. Thomasson Associates
Structural engineer: Forefront Structural Engineers
General contractor/construction manager: JE Dunn

5 City Blvd - Video Animation.mp4 from Grace Sport on Vimeo.

Construction recently started on 5 City Blvd, a 15-story office and mixed-use building in Nashville. Rendering courtesy Goettsch Partners
Rendering courtesy Goettsch Partners
Construction recently started on 5 City Blvd, a 15-story office and mixed-use building in Nashville. Rendering courtesy Goettsch Partners
Rendering courtesy Goettsch Partners

Related Stories

Mixed-Use | May 24, 2021

33-story glass mixed-use tower to rise in downtown Orlando

DLR Group is designing the project.

Mixed-Use | May 24, 2021

Olson Kundig unveils new mixed-use high-rise in Atlanta

The project is currently under construction along Atlanta’s BeltLine.

Mixed-Use | May 7, 2021

Mixed-use development tops out in Brooklyn’s Brownsville neighborhood

The project will bring 160 affordable housing units to the area.

Mixed-Use | Apr 28, 2021

The Dime is Williamsburg’s newest mixed-use development

Fogarty Finger designed the project.

Mixed-Use | Apr 22, 2021

Jakarta’s first supertall tower tops out

The project will anchor the Thamrin Nine development.

Mixed-Use | Apr 20, 2021

EskewDumezRipple and Wolf Ackerman unveil the Center for Developing Entrepreneurs

The Charlottesville, Va. project is slated for completion later this year.

Mixed-Use | Apr 19, 2021

BIG unveils design for the new OPPO R&D Headquarters in Hangzhou’s Future Sci-Tech City

The project sits between a natural lake, an urban center, and a 10,000-sm park.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021