Construction recently started on 5 City Blvd, a new 15-story office and mixed-use building in Nashville, Tenn. Located on a uniquely shaped site, the 730,000-sf, high-rise structure features curved, stepped massing and amenities with a focus on wellness.
The building contains 350,000 sf of Class A office space, 15,000 sf of ground-floor retail, and parking with more than 900 stalls across multiple levels. A variety of floor plates cater to different tenant needs.
The building appears to “peel and unfold” along the eastern façade, echoing the site’s geometry while creating a series of large-scale stepped terraces that provide outdoor amenity spaces with unobstructed views of the Nashville skyline.
High-performance, floor-to-ceiling glass is used throughout all commercial spaces. Copper-toned vertical fins provide passive shading while referencing the coloring of the native clay found on the site.
“Challenging sites often lead to memorable design solutions,” says Paul De Santis, Assoc. AIA, LEED AP, Partner and Co-Design Director with Goettsch Partners (GP), designers of the project. “The design for 5 City Blvd strives to balance sculptural expression with pragmatic planning.”
Retail spaces along the base contribute to a pedestrian-friendly environment within a larger development that provides an active streetscape. The southeast corner of the parcel has been left open to create a new plaza that forms the symbolic heart of the community. Accessed by boutique retail and office users alike, the plaza will be an active, light-filled, and creatively landscaped space.
Designed to achieve LEED and Wired standards, the project is intended to attract users who are seeking a healthy and technologically advanced work environment, according to a GP news release. The project is slated for completion in the fall of 2024.
On the building team:
Owner and/or developer: Convexity Properties
Design architect/Architect of record: Goettsch Partners
MEP engineer: I.C. Thomasson Associates
Structural engineer: Forefront Structural Engineers
General contractor/construction manager: JE Dunn
5 City Blvd - Video Animation.mp4 from Grace Sport on Vimeo.
Related Stories
Mixed-Use | Mar 21, 2017
Studio Gang commissioned to design its first Canadian building
The project will be a mixed-use tower at the southwest corner of Yonge and Delisle in Toronto.
Retail Centers | Mar 9, 2017
When everyone shops online, what happens to mixed-use retail?
NBBJ’s David Yuan explains how changing retail trends are creating new opportunities for urban experiences and public space.
High-rise Construction | Mar 3, 2017
Detroit's tallest tower to rise at site of former J.L Hudson's Department Store
SHoP Architects and Hamilton Anderson Associates will design the 52-story building.
Mixed-Use | Mar 1, 2017
New hotel and residential tower coming to San Francisco’s Transbay neighborhood
The ground-up development will feature 255 hotel rooms and 69 residential units.
Mixed-Use | Feb 27, 2017
Tallest tower in Miami to begin construction in January 2019
The tower will reach a height of 1,049 feet, the maximum height permitted by the FAA in Miami.
Mixed-Use | Feb 23, 2017
5-tower scheme revealed for Zhengzhou, China
The towers will vary in height and emerge from a shared retail podium.
Mixed-Use | Feb 22, 2017
Hunt Development Group selected to spearhead Cabrini-Green redevelopment
The Chicago Housing Authority selected the firm to develop mixed-income housing and retail space where the infamous housing project once stood.
Mixed-Use | Feb 21, 2017
Coconut Grove’s newest mixed-use development springs from a converted parking garage
Terra says the development will be the first newly built office building in central Coconut Grove in over 20 years.
High-rise Construction | Feb 17, 2017
Zaha Hadid Architects-designed building to have the world’s tallest atrium
A 190-meter atrium will rise the full height of the building between two twisting sections.
Mixed-Use | Feb 8, 2017
Santiago Calatrava’s first major UK project will be the heart of the Greenwich Peninsula transformation
Peninsula Place will cost £1 billion and act as a gateway to the new, master-planned district.