flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

New Papa Johns restaurant design will streamline the customer experience

Retail Centers

New Papa Johns restaurant design will streamline the customer experience

The restaurant redesign brings with it a new logo and brand identity.


By David Malone, Managing Editor | November 16, 2021
Papa Johns new restaurant design exterior
Images courtesy Papa Johns

Papa Johns has recently announced a new design for its restaurants, a new logo, and a new visual brand identity meant to modernize the experience for customers and team members.

The new customer-centric restaurant design will create a streamlined, flexible environment that will provide seamless purchasing and pick-up experiences for customers. The open-floorpan restaurant design blends modern simplicity with an experience that invites customers to enjoy their pizza.

Papa Johns crafted the new restaurant design to provide customers with better pick-up options, such as via the drive-thru, at the “Drive-Up Pick Up,” and inside at the pick-up counter, which now includes a self-service option that allow customers to get their order without waiting in line.

Papa Johns new restaurant interior design

Kitchens will now feature modular stations that allow the same space to be used for different products at different times. Team members will be better equipped with a special space to add the final touches to each pizza.

Each restaurant will also present the brand’s new visual identity, which includes an updated palette inspired by the pizza ingredients, photos celebrating the company's best pizza moments, and a new “hand drawn happiness” illustration style.

Papa Johns has begun implementing a phased approach that will gradually roll out the new experience to customers and team members in the near future.

Related Stories

| Apr 16, 2012

Shawmut awarded Tag Heuer builds in Florida and Pennsylvania

Both projects are scheduled to be completed this spring.

| Apr 2, 2012

Sachse Construction helps complete Salt Lake City’s City Creek Center

Sachse was hired to complete store build-outs at City Creek Center.

| Mar 19, 2012

Mixed-use project redefines Midtown District in Plantation, Fla.

Stiles Construction is building the residential complex, which is one of Broward County’s first multifamily rental communities designed to achieve LEED certification from the USGBC. 

| Mar 16, 2012

Work on Oxnard, Calif. shopping center resumes after a three-year hiatus

Stalled since 2009, developers of the Collection at RiverPark decided to restart construction on the outdoor mall. 

| Feb 22, 2012

Suffolk awarded Boston post office renovation project

Renovation of art deco landmark will add 21,000 square feet of retail and 110 new parking spaces.

| Feb 16, 2012

Big-box retailers not just for DIYers

Nearly half of all contractor purchases made from stores like Home Depot and Lowe's.

| Feb 16, 2012

4.8-megawatt solar power system completed at Jersey Gardens Mall

Solar array among the largest rooftop systems in North America.

| Feb 15, 2012

Englewood Construction announces new projects with Destination Maternity, American Girl

Englewood’s newest project for Wisconsin-based doll retailer American Girl, the company will combine four vacant storefronts into one large 15,000 square-foot retail space for American Girl.

boombox1
boombox2
native1

More In Category

3D Printing

3D-printed construction milestones take shape in Tennessee and Texas

Two notable 3D-printed projects mark milestones in the new construction technique of “printing” structures with specialized concrete. In Athens, Tennessee, Walmart hired Alquist 3D to build a 20-foot-high store expansion, one of the largest freestanding 3D-printed commercial concrete structures in the U.S. In Marfa, Texas, the world’s first 3D-printed hotel is under construction at an existing hotel and campground site.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021