flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

New San Francisco mixed-use tower billed as most earthquake-resistant building on the West Coast

High-rise Construction

New San Francisco mixed-use tower billed as most earthquake-resistant building on the West Coast

A megabrace is a key seismic component at 181 Fremont, with offices, residences, and retail space.


By John Caulfield, Senior Editor | July 14, 2016

Welding has begun on a 70-story-tall office and residential tower in earthquake prone San Franciso that claims it can resist a 500-year earthquake, and be back in full operation within a month after a catastrophic event. Image: Courtesy of 181 Fremont

The developer of 181 Fremont, a 70-story residential and office tower being built in San Francisco, claims this will be the most earthquake-resistant building on the West Coast when it is completed in the summer of 2017.

Jay Paul Company acquired this development from SKS Investments in 2013, and estimates its cost at $665 million. The Class A building will include 432,000 sf of office space, 67 luxury condos on its top 17 floors, and 3,000 sf of retail space.

The building’s architecture (by Heller Manus), residential interior design (by Orlando Diaz-Azcuy) and engineering (by Arup) revolve around a unique megabrace that, according to the developer, would virtually eliminate structural damage from a significant (i.e., 500-year) earthquake. Jay Paul also believes this design could set new standards for earthquake resilience for urban development.

The resilience-based design focuses on saving lives and minimizing structural damage, property loss, and protection of the building’s MEP systems. The building features a sawtooth curtainwall, passive solar energy, and a water-recycling system. It’s the only residential tower in San Francisco to be pre-certified LEED Platinum.

“The seismic design is consistent with our approach to position 181 Fremont as the preeminent tower in San Francisco in every aspect of design and development,” said Matt Lituchy, CIO of Jay Paul Company.

181 Fremont’s calling card is its claim that a seismic event wouldn’t disrupt the building’s business continuity. Occupants and businesses would be able to return to the tower with complete access to business operations, and the building would be fully functional again, within one month. The elevator systems are also designed for continuous operation during a catastrophic event, with contingencies for emergency evacuations.

The tower is adjacent to the new Transbay Transit Center.

Related Stories

High-rise Construction | Aug 22, 2016

Tall buildings with a twist: CTBUH ranks the world’s 28 tallest twisting towers

In 2005, the Turning Toroso, designed by Santiago Calatrava, was completed, making it the first twisting skyscraper in the world.

High-rise Construction | Aug 1, 2016

Rising to the occasion: Dubai shows some pictures of proposed 500-step structure

Still in the planning stages, this building would serve tourists and power climbers alike. 

High-rise Construction | Jul 26, 2016

Perkins+Will unveils plans for what will be Atlanta’s second-tallest tower

The 74-story 98 Fourteenth Street will be a mixed-use building with retail space and luxury residential units.

Concrete | Jul 20, 2016

Arup ensures Mexico City concrete skyscraper can withstand seismic activity

Double-V hangers and irregularly spaced gaps allow the structure to bend.  

High-rise Construction | Jul 15, 2016

Zaha Hadid designs geometric flower-shaped tower for sustainable Qatar city

The 38-story building will have a mashrabiya latticed facade with hotel and residential space inside.

High-rise Construction | Jul 14, 2016

Shigeru Ban designs tower expected to be world’s tallest hybrid timber structure

To lessen the carbon footprint, Terrace House in Vancouver will be made of wood sourced from British Columbia.

High-rise Construction | Jul 12, 2016

Three-tiered, 57-story high-rise development from Arquitectonica coming to Miami

The structure will be the tallest building in the Edgewater District

Office Buildings | Jul 11, 2016

CetraRuddy designs office tower for Manhattan’s Meatpacking district

Plans originally called for a hotel, but the architect and developers adapted their design for commercial use.

Contractors | Jul 4, 2016

A new report links infrastructure investment to commercial real estate expansion

Competitiveness and economic development are at stake for cities, says Transwestern.

High-rise Construction | Jun 29, 2016

Best Tall Buildings around the world favor unusual shapes and hybrid functions

The Council on Tall Buildings and Urban Habitat selects winners in four regions.

boombox1
boombox2
native1

More In Category




Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021