The currently under construction IKEA at Westbahnhof will showcase the retail company’s new store concept that focuses on current shopping trends and the dramatically changing shopping behavior.
The seven-story building includes green façades, restaurants, a green roof terrace, and extra open space for customers. Something the concept does not include is parking. As more and more customers forgo carrying their purchases home and instead opt for delivery, the new IKEA concept delivers all products that are larger than “small items” to a customer’s home within a maximum of 24 hours.
The goal of Ikea at Westbahnhof is to become the meeting point for the entire district. A direct connection to the public transport network will be included and public space will be accessible outside of IKEA hours (this includes the green roof terrace). The façade on the ground floor has been set back to create an arcade and a sidewalk that is twice as wide as before. This will help increase safety in the tram stop area and create a more pleasant atmosphere for pedestrians.
See Also: Construction begins on $1.8 billion addition to the Washington State Convention Center
Ikea at Westbahnhof is currently under construction and slated for completion in 2021.
Related Stories
| Jul 20, 2012
Global boom for hotels; for retail, not so much
The Giants 300 Top 10 Firms in the Hospitality and Retail sectors.
| Jul 17, 2012
KM/Plaza changes name to Plaza Construction
Lands new projects including the Perry South Beach Hotel and Dadeland Mall Kendall Wing Expansion.
| Jun 1, 2012
New BD+C University Course on Insulated Metal Panels available
By completing this course, you earn 1.0 HSW/SD AIA Learning Units.
| May 29, 2012
Reconstruction Awards Entry Information
Download a PDF of the Entry Information at the bottom of this page.
| May 24, 2012
2012 Reconstruction Awards Entry Form
Download a PDF of the Entry Form at the bottom of this page.
| Apr 30, 2012
HSA Commercial selected as consultant for Orland Park’s Main Street Triangle project
HSA will be responsible for designing an overall mixed-use merchandise plan, attracting a unique retail tenant mix and completing leases with prospective tenants.
| Apr 20, 2012
Shawmut completes Yard House Restaurant in Boston
12,000-sf restaurant marks new addition to Boston’s Fenway neighborhood.
| Apr 19, 2012
KTGY Group’s Arista Uptown Apartments in Broomfield, Colo. completed
First of eight buildings highlights unique amenities.
| Apr 16, 2012
University of Michigan study seeks to create efficient building design
The result, the researchers say, could be technologies capable of cutting the carbon footprint created by the huge power demands buildings place on the nation’s electrical grid.