The currently under construction IKEA at Westbahnhof will showcase the retail company’s new store concept that focuses on current shopping trends and the dramatically changing shopping behavior.
The seven-story building includes green façades, restaurants, a green roof terrace, and extra open space for customers. Something the concept does not include is parking. As more and more customers forgo carrying their purchases home and instead opt for delivery, the new IKEA concept delivers all products that are larger than “small items” to a customer’s home within a maximum of 24 hours.
The goal of Ikea at Westbahnhof is to become the meeting point for the entire district. A direct connection to the public transport network will be included and public space will be accessible outside of IKEA hours (this includes the green roof terrace). The façade on the ground floor has been set back to create an arcade and a sidewalk that is twice as wide as before. This will help increase safety in the tram stop area and create a more pleasant atmosphere for pedestrians.
See Also: Construction begins on $1.8 billion addition to the Washington State Convention Center
Ikea at Westbahnhof is currently under construction and slated for completion in 2021.
Related Stories
| Feb 8, 2012
Mega-malls expanding internationally
Historically, malls have always been the icons of America – the first mall ever was built in Minneapolis in 1956.
| Jan 15, 2012
Smith Consulting Architects designs Flower Hill Promenade expansion in Del Mar, Calif.
The $22 million expansion includes a 75,000-square-foot, two-story retail/office building and a 397-car parking structure, along with parking and circulation improvements and new landscaping throughout.
| Jan 6, 2012
New Walgreen's represents an architectural departure
The structure's exterior is a major departure from the corporate image of a traditional Walgreens design.
| Jan 6, 2012
Summit Design+Build completes Park Place in Illinois
Summit was responsible for the complete gut and renovation of the former auto repair shop which required the partial demolition of the existing building, while maintaining the integrity of the original 100 year-old structure, and significant re-grading and landscaping of the site.
| Nov 29, 2011
Suffolk Construction breaks ground on Boston residential tower
Millennium Place III is a $220 million, 256-unit development that will occupy a full city block in Boston’s Downtown Crossing.
| Nov 29, 2011
Report finds credit crunch accounts for 20% of nation’s stalled projects
Persistent financing crunch continues to plague design and construction sector.
| Nov 22, 2011
Jones Lang LaSalle completes construction of two new stores in Manhattan
Firm creates new global design standard serving as project manager for Uniglo’s 89,000-sf flagship location and, 64,000-sf store.
| Oct 26, 2011
Shawmut Design and Construction awarded Tag Heuer build in Aventura, Fla.
New store features 1,200 sf fit out at Aventura Mall.
| Oct 3, 2011
Magellan Development Group opens Village Market in Chicago’s Lakeshore East neighborhood
Magellan Development Group and Hanwha Engineering & Construction are joint-venture development partners on the project. The Village Market was designed for Silver LEED certification by Loewenberg Architects and built by McHugh Construction.