Nexii Building Solutions, which recently completed a first-of-its-kind Starbucks in Abbotsford, B.C., has now completed the first sustainably constructed Popeyes restaurant in Canada.
Also located in Abbotsford, the new restaurant was built in under two weeks. Nexii’s high-performanve green building products are precision manufactured in plants to project specifications using 3D software. This process means the Nexii panels are able to fit together like jigsaw pieces onsite, accelerating standard build times by between 50% and 75%. The process also enables Nexii to eliminate almost all onsite construction waste.
Nexiite, Nexii’s proprietary material used within its building panels, is more thermally efficient and less carbon-intensive than concrete. When assembled, the Nexii panels create an airtight building envelope. Nexii estimates the Popeyes restaurant’s operational building carbon emissions will be reduced by approximately 30%.
The Popeyes restaurant is expected to open to the public by the fall of 2021.
Related Stories
Education Facilities | Jun 4, 2021
Three ProConnect events coming this fall: Sustainability (Nov 2-3), Education (Nov 16-17), Multifamily (Dec 12-14)
SGC Horizon ProConnect 2021 schedule for Education, Multifamily, Office, and Single Family events.
High-rise Construction | May 27, 2021
The anti-high rise: Seattle's The Net by NBBJ
In this exclusive video interview for HorizonTV, Ryan Mullenix, Design Partner with NBBJ, talks with BD+C's John Caulfield about a new building in Seattle called The Net that promotes wellness and connectivity.
Wood | May 14, 2021
What's next for mass timber design?
An architect who has worked on some of the nation's largest and most significant mass timber construction projects shares his thoughts on the latest design trends and innovations in mass timber.
Sustainability | May 12, 2021
Climate modeling for a resilient business and future
This post explores changes that developers and their teams need to make to their risk and resilience strategies by climate modeling for climate change.
Sustainability | Apr 23, 2021
AIA honors exceptional designs with its COTE Top Ten Awards
Projects integrate high design with advanced performance in ten key areas.
Industry Research | Apr 9, 2021
BD+C exclusive research: What building owners want from AEC firms
BD+C’s first-ever owners’ survey finds them focused on improving buildings’ performance for higher investment returns.
Sustainability | Mar 9, 2021
First-of-its-kind Starbucks built in just six days
The store is set to open in Canada in mid-March.
Daylighting | Mar 7, 2021
Texas intermediate school lets the sun really shine in
Solatube tubular daylighting devices bring sunlight into the two-story commons/media space for 600 students in grades 3-5 at Sunnyvale Intermediate School.
Resiliency | Mar 2, 2021
Elizabeth River Project's Resilience Lab set to break ground this year
Work Program Architects is designing the project.