flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Oklahoma State University’s North Academic Building begins construction

University Buildings

Oklahoma State University’s North Academic Building begins construction

Dewberry designed the project.


By David Malone, Associate Editor | August 5, 2020
OSU North academic building exterior

North Hall will include a bridge to the existing building, and a future link across all buildings for a second floor internal walking path.

The North Academic Building and the Office of the Chief Medical Examiner (ME) at Oklahoma State University’s Center for Health Sciences has started construction. The project will relocate and upgrade services from multiple buildings currently in the center of campus and is the first phase of a master plan focused on health and advancement in research and education.

Initial programming and conceptual design for the building was completed in 2018. Once complete, the ME office will be one of only a few in the country that is directly and physically connected with an academic health center. The ME autopsy lab is unique to Oklahoma and will be among the most technologically advanced in the world specific to advanced postmortem diagnostic imaging.

 

OSU north academic building interiorThe new elevator shaft provides an opportunity to tie the exterior aesthetic to the interior.

 

The new building will also house the Center for Rural Health, Center for Health Systems Innovation, and dedicated anatomy and neuroscience-anatomy laboratories. Additional amenities will include classroom, conference, study, and administration areas.

The project is slated for completion in fall 2022.

 

OSU autopsy labWhen complete, the ME office will be submitted for the National Associate of Medical Examiners (NAME) accreditation, which will rank it among the top ME offices in the nation.

 

Related Stories

University Buildings | May 9, 2022

An athletic center accentuates a college’s transformation

Modern design and a student health center distinguish the new addition at The University of Saint Joseph in Connecticut.

Sponsored | BD+C University Course | May 3, 2022

For glass openings, how big is too big?

Advances in glazing materials and glass building systems offer a seemingly unlimited horizon for not only glass performance, but also for the size and extent of these light, transparent forms. Both for enclosures and for indoor environments, novel products and assemblies allow for more glass and less opaque structure—often in places that previously limited their use.

Education Facilities | Apr 28, 2022

ProConnect Education (K-12 to University) comes to Scottsdale, AZ, Dec 4-6

ProConnect Education 2022 will attract building product specifiers and manufacturers to the Andaz Resort in Scottsdale, Ariz., in December.

Sports and Recreational Facilities | Apr 27, 2022

New Univ. of Texas Moody Center houses men’s and women’s basketball, other events

The recently completed 530,000 sf University of Texas Moody Center is the new home for men’s and women’s basketball at the Austin campus.

Architects | Apr 22, 2022

Top 10 green building projects for 2022

The American Institute of Architects' Committee on the Environment (COTE) has announced its COTE Top Ten Awards for significant achievements in advancing climate action.

University Buildings | Apr 18, 2022

SmithGroup to design new Univ. of Colorado Denver engineering, design, computing building

The University of Colorado Denver selected SmithGroup to design a new engineering, design, and computing building that will serve as anchor of new downtown innovation district.

Projects | Apr 1, 2022

University complex encourages exchange between academics and residents

In the small Danish city of Horsens, C.F. Møller Architects has created a university complex that unites higher education with urban life—creating synergies among students, staff, businesses, and residents

Energy-Efficient Design | Mar 25, 2022

University of Pittsburgh Releases ‘Pitt Climate Action Plan’

The University of Pittsburgh has released the Pitt Climate Action Plan, detailing how the University will achieve its goal to go carbon neutral by 2037 through investments in clean energy, transportation, efficiency and other areas.

Higher Education | Mar 24, 2022

Higher education sector sees 19 percent reduction in facilities investments

Colleges and universities face a growing backlog of capital needs and funding shortfalls, according to Gordian’s 2022 State of Facilities in Higher Education report. 

Projects | Mar 16, 2022

Tomorrow’s STEM leaders get a state-of-the-art research complex

In February, North Carolina Agriculture and Technical State University (NC A&T) opened its new Engineering Research & Innovation Complex (ERIC).

boombox1
boombox2
native1

More In Category

Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021