A former Sears store in Rochester, N.Y., will be transformed into one of the largest orthopaedics outpatient facilities in the Northeast.
The new University of Rochester Orthopaedics & Physical Performance Center will arise in retail space at the Marketplace Mall in Henrietta, N.Y. The development reflects two trends: the surge in e-commerce resulting in more vacant retail spaces, and a growing demand for more robust healthcare infrastructure across the country. The project team includes Architect of record SLAM (The S/L/A/M Collaborative) and design architect Perkins & Will.
"As healthcare facilities across the U.S. look to decentralize their services, the adaptive reuse of underutilized retail space represents a huge opportunity for institutions, like the University of Rochester Medical Center (URMC), to expand their outpatient reach by moving to the mall." said Scott Hansche, AIA, principal-in-charge at SLAM, in a news release.
The $227 million, 350,000 sf facility will include a 210,000 sf renovated space and a 140,000 sf new outpatient clinical services building that will house 140 exam rooms for orthopaedic care.
The design brings daylight into the existing Sears footprint through a series of skylights and an internal courtyard that also functions as rehabilitation space. The building’s sinuous facade design represents the idea of movement, echoing the orthopaedic care provided within its walls.
The new facility will address a growing need to expand infrastructure into underserved regions, helping to address healthcare equity gaps. One of the goals was to create a feeling of familiarity and accessibility for patients.
“Repurposing a traditional community anchor, such as a mall, helps upend perceptions of healthcare facilities as centralized urban complexes,” said Robert Goodwin, FAIA, design director of Perkins & Will's New York studio. “We are integrating healthcare into the existing fabric of the community rather than asking patients to travel to a facility that might be hard to reach.” Accessibility was amplified through a series of decentralized entry points and the addition of a dedicated bus stop outside of the outpatient facility.
Repurposing an existing site meant that there was reduced need for permitting and no new roads were required. The renovated 200,000 sf section includes a surgical platform with three operating rooms, a three-room procedure suite, advanced imaging, clinical research, education, administration, physical therapy, and a human performance and injury prevention center.
The first phase, relocating the orthopaedic administrative offices to an adjacent renovated lease space, was completed and occupied in fall 2021. The second phase, the conversion of the former Sears store to an outpatient surgical center, will be complete by fall 2022. A third phase, construction of a rehab and sports performance center is expected to open next spring, and a four-story, 144-bed clinic space is scheduled for completion in fall 2023.
Owner and/or developer: Wilmorite
Design architect: Perkins & Will's New York studio
Architect of record: SLAM (The S/L/A/M Collaborative)
Local Associate Architect: Dwyer Architectural
MEP/IT Engineer : ME Engineering
Structural Engineer: Jensen BRV
General contractor/construction manager: Le Chase
Civil Engineer and Landscape Architect: Bergmann Associates
Related Stories
| Jul 14, 2014
Meet the bamboo-tent hotel that can grow
Beijing-based design cooperative Penda designed a bamboo hotel that can easily expand vertically or horizontally.
| Jul 14, 2014
Foster + Partners unveils triple-glazed tower for RMK headquarters
The London-based firm unveiled plans for the Russian Copper Company's headquarters in Yekaterinburg.
| Jul 11, 2014
First look: Jeanne Gang reinterprets San Francisco Bay windows in new skyscraper scheme
Chicago architect Jeanne Gang has designed a 40-story residential building in San Francisco that is inspired by the city's omnipresent bay windows.
| Jul 11, 2014
Are these LEGO-like blocks the future of construction?
Kite Bricks proposes a more efficient way of building with its newly developed Smart Bricks system.
| Jun 11, 2014
David Adjaye’s housing project in Sugar Hill nears completion
A new development in New York's historic Sugar Hill district nears completion, designed to be an icon for the neighborhood's rich history.
| Apr 8, 2014
Fire resistive curtain wall helps The Kensington meet property line requirements
The majority of fire rated glazing applications occur inside a building to allow occupants to exit the building safely or provide an area of refuge during a fire. But what happens when the threat of fire comes from the outside? This was the case for The Kensington, a mixed-use residential building in Boston.
| Mar 25, 2014
Sydney breaks ground on its version of the High Line elevated park [slideshow]
The 500-meter-long park will feature bike paths, study pods, and outdoor workspaces.
| Jan 28, 2014
2014 predictions for skyscraper construction: More twisting towers, mega-tall projects, and 'superslim' designs
Experts from the Council on Tall Buildings and Urban Habitat release their 2014 construction forecast for the worldwide high-rise industry.
| Jan 21, 2014
2013: The year of the super-tall skyscraper
Last year was the second-busiest ever in terms of 200-meter-plus building completions, with 73 towers, according to a report by the Council on Tall Buildings and Urban Habitat.
| Sep 23, 2013
Six-acre Essex Crossing development set to transform vacant New York property
A six-acre parcel on the Lower East Side of New York City, vacant since tenements were torn down in 1967, will be the site of the new Essex Crossing mixed-use development. The product of a compromise between Mayor Michael Bloomberg and various interested community groups, the complex will include ~1,000 apartments.