A former Sears store in Rochester, N.Y., will be transformed into one of the largest orthopaedics outpatient facilities in the Northeast.
The new University of Rochester Orthopaedics & Physical Performance Center will arise in retail space at the Marketplace Mall in Henrietta, N.Y. The development reflects two trends: the surge in e-commerce resulting in more vacant retail spaces, and a growing demand for more robust healthcare infrastructure across the country. The project team includes Architect of record SLAM (The S/L/A/M Collaborative) and design architect Perkins & Will.
"As healthcare facilities across the U.S. look to decentralize their services, the adaptive reuse of underutilized retail space represents a huge opportunity for institutions, like the University of Rochester Medical Center (URMC), to expand their outpatient reach by moving to the mall." said Scott Hansche, AIA, principal-in-charge at SLAM, in a news release.
The $227 million, 350,000 sf facility will include a 210,000 sf renovated space and a 140,000 sf new outpatient clinical services building that will house 140 exam rooms for orthopaedic care.
The design brings daylight into the existing Sears footprint through a series of skylights and an internal courtyard that also functions as rehabilitation space. The building’s sinuous facade design represents the idea of movement, echoing the orthopaedic care provided within its walls.
The new facility will address a growing need to expand infrastructure into underserved regions, helping to address healthcare equity gaps. One of the goals was to create a feeling of familiarity and accessibility for patients.
“Repurposing a traditional community anchor, such as a mall, helps upend perceptions of healthcare facilities as centralized urban complexes,” said Robert Goodwin, FAIA, design director of Perkins & Will's New York studio. “We are integrating healthcare into the existing fabric of the community rather than asking patients to travel to a facility that might be hard to reach.” Accessibility was amplified through a series of decentralized entry points and the addition of a dedicated bus stop outside of the outpatient facility.
Repurposing an existing site meant that there was reduced need for permitting and no new roads were required. The renovated 200,000 sf section includes a surgical platform with three operating rooms, a three-room procedure suite, advanced imaging, clinical research, education, administration, physical therapy, and a human performance and injury prevention center.
The first phase, relocating the orthopaedic administrative offices to an adjacent renovated lease space, was completed and occupied in fall 2021. The second phase, the conversion of the former Sears store to an outpatient surgical center, will be complete by fall 2022. A third phase, construction of a rehab and sports performance center is expected to open next spring, and a four-story, 144-bed clinic space is scheduled for completion in fall 2023.
Owner and/or developer: Wilmorite
Design architect: Perkins & Will's New York studio
Architect of record: SLAM (The S/L/A/M Collaborative)
Local Associate Architect: Dwyer Architectural
MEP/IT Engineer : ME Engineering
Structural Engineer: Jensen BRV
General contractor/construction manager: Le Chase
Civil Engineer and Landscape Architect: Bergmann Associates
Related Stories
| May 1, 2013
World’s tallest children’s hospital pushes BIM to the extreme
The Building Team for the 23-story Lurie Children’s Hospital in Chicago implements an integrated BIM/VDC workflow to execute a complex vertical program.
| Apr 22, 2013
Top 10 green building projects for 2013 [slideshow]
The AIA's Committee on the Environment selected its top ten examples of sustainable architecture and green design solutions that protect and enhance the environment.
| Feb 28, 2013
Greeening Silicon Valley: Samsung's new 1.1 million-sf HQ
Samsung Electronics' new 1.1 million sf San Jose campus will support at least 2,500 sales and R&D staff in the company's semiconductor and display businesses.
| Feb 27, 2013
Bronx residents get LEED Platinum public housing complex, rooftop farm
The New York City Housing Authority has opened Arbor House, a 124-unit LEED Platinum complex in the Morrisania neighborhood of the Bronx.
| Feb 22, 2013
Starbucks pilot program rolls out small, modular stores
Coffee giant Starbucks is rolling out mini-stores with maximum local flavor, as part of an international pilot program.
| Oct 23, 2012
Transwestern to develop industrial complex in Houston’s Energy Corridor
Transwestern, a commercial real estate firm, has acquired 30 acres in Houston’s Energy Corridor for a 384,900-sf industrial project, the company announced.
| Jul 25, 2012
Contract awarded for Gaillard Municipal Auditorium renovations in Charleston, S.C.
Seeking LEED Silver certification, the project will begin in August and is slated for completion in December 2014.
| Jul 24, 2012
Dragon Valley Retail at epicenter of Yongsan International Business District
Masterplanned by architect Daniel Libeskind, the Yongsan IBD encompasses ten city blocks and includes a collection of high-rise residences and commercial buildings.
| Jul 24, 2012
$20 Million expansion at New Orleans casino announced
150-room hotel project to include suites, fitness center, and meeting space.