OMA recently won a competition to design the new KaDeWe Vienna department store in Vienna’s Meseumsquartier. The project will be created from an existing building that consists of three parts built in different years and provide a total of about 624,300 sf of space.
The project’s main program is split into two volumes that comprise retail space up front, a 150- to 165-room hotel in the rear, and a green passage between the two that leads up to a series of public roof gardens and restaurants. The building’s central axis organizes the main flows and plugs into a circular void that forms the epicenter of the retail program.
The rooftop gardens will occupy approximately 10,760 sf and range from tree groves to sun decks and offer views of the city from all sides of the building. The gardens will be accessible outside of the stores’ and restaurants’ operating hours.
See Also: Populous submits proposal for AC Milan and FC Internazionale Milano stadium
The permeable, open building will be connected to the pedestrian network of the area and provide new types of public spaces in the historical center. The outdoor public passage creates an extension of the Karl-Schweighofer-Gasse and a footpath links a new central entrance on Mariahilfer Strasse to the passage. Both open public spaces and more intimate areas will be offered.
Inspired by the geometries of the architecture of the Vienna Secession, the facade is based on a regular system of different sizes of cylindrical glass modules – convex bay windows for the hotel and concave panels for the retail space. The facade is meant to appear as a 3D white veil that unfolds along the entire building.
Once completed, KaDeWe Vienna will be OMA’s first project in Vienna. Vasko + partner is the MEP and structural engineer. Signa is the developer. Construction is planned to begin in the first half of 2021 with completion slated for autumn 2023.
Related Stories
Mixed-Use | Oct 7, 2024
New mixed-use tower by Studio Gang completes first phase of San Francisco waterfront redevelopment
Construction was recently completed on Verde, a new mixed-use tower along the San Francisco waterfront, marking the end of the first phase of the Mission Rock development. Verde is the fourth and final building of phase one of the 28-acre project that will be constructed in several phases guided by design principles developed by a design cohort led by Studio Gang.
Affordable Housing | Oct 4, 2024
3 new affordable housing projects for October 2024
As affordable housing continues to grow, more projects are looking to diversify their footprint by adding mixed-use components, community areas, and more.
Mixed-Use | Sep 19, 2024
A Toronto development will transform a 32-acre shopping center site into a mixed-use urban neighborhood
Toronto developers Mattamy Homes and QuadReal Property Group have launched The Clove, the first phase in the Cloverdale, a $6 billion multi-tower development. The project will transform Cloverdale Mall, a 32-acre shopping center in Toronto, into a mixed-use urban neighborhood.
Mixed-Use | Sep 10, 2024
Centennial Yards, a $5 billion mixed-use development in downtown Atlanta, tops out its first residential tower
Centennial Yards Company has topped out The Mitchell, the first residential tower of Centennial Yards, a $5 billion mixed-use development in downtown Atlanta. Construction of the apartment building is expected to be complete by the middle of next year, with first move-ins slated for summer 2025.
Codes and Standards | Sep 3, 2024
Atlanta aims to crack down on blighted properties with new tax
A new Atlanta law is intended to crack down on absentee landlords including commercial property owners and clean up neglected properties. The “Blight Tax” allows city officials to put levies on blighted property owners up to 25 times higher than current millage rates.
Building Technology | Aug 23, 2024
Top-down construction: Streamlining the building process | BD+C
Learn why top-down construction is becoming popular again for urban projects and how it can benefit your construction process in this comprehensive blog.
Mixed-Use | Aug 21, 2024
Adaptive reuse of a Sears store becomes luxury mixed-use housing
6 Corners Lofts at 4714 W Irving Park Road, Chicago, Ill., opened in March of 2024 as a 394,000-sf adaptive reuse project born out of a former Sears store.
Curtain Wall | Aug 15, 2024
7 steps to investigating curtain wall leaks
It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus.
Adaptive Reuse | Aug 14, 2024
Adaptive reuse revives a former warehouse in St. Louis
The Victor, as the building is now called, has nearly 400 residential apartments.
Adaptive Reuse | Aug 14, 2024
KPF unveils design for repositioning of Norman Foster’s 8 Canada Square tower in London
8 Canada Square, a Norman Foster-designed office building that’s currently the global headquarters of HSBC Holdings, will have large sections of its façade removed to create landscaped terraces. The project, designed by KPF, will be the world’s largest transformation of an office tower into a sustainable mixed-use building.