flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Online mapping tool helps teams determine multifamily project tax credit eligibility

Online mapping tool helps teams determine multifamily project tax credit eligibility

Interactive tool helps users determine if a project may qualify for the New Markets Tax Credit or Low-Income Housing Tax Credit program.


By Baker Tilly | April 17, 2014
Courtesy Baker Tilly
Courtesy Baker Tilly

MADISON, Wis. – Accounting and advisory firm Baker Tilly Virchow Krause (Baker Tilly) has launched a new, interactive online mapping tool that helps users determine if a business or development project may qualify under various criteria for the New Markets Tax Credit (NMTC) or Low-Income Housing Tax Credit (LIHTC) program.

The NMTC made more than $30 billion in direct NMTC investments from 2003 to 2012 to businesses in low-income areas and leveraged a total of $60 billion, with the majority of these investments being in communities exhibiting severe economic distress. A total of 310 applications received under the 2013/2014 round of the program, requesting an aggregate total of $25.8 billion in allocation authority, are competing for a share of the $3.5 billion authorized.  Through the LIHTC program, more than two million housing units have been placed in service between 1987 and 2011, with an average of more than 105,000 units placed in service each year.

“NMTC and LIHTC are important vehicles for investment in communities and meeting critical housing needs in our nation,” said Terri Preston, a Baker Tilly transactions team principal specializing in commercial and real estate finance. “The programs also provide vital capital our clients need to achieve their growth objectives while investing in transactions that will enrich communities throughout the U.S.”

The NMTC program provides tax credits for investment into operating businesses and development projects located in qualifying “distressed” communities. Using the 2006-2010 American Community Survey data, this mapping tool, available at bakertilly.com/tax-credit-mapping-tool, makes it easy to determine if a project is located in an eligible census tract based on certain distress criteria. The tool also allows multifamily housing developers to quickly determine if a project lies within a qualifying census tract or difficult development area for LIHTC purposes, which may be beneficial to application scoring and financial feasibility of a project by possibly boosting eligible basis.

Baker Tilly’s transactions team works closely with owners, developers, community leaders, lenders, investors and Community Development Entities to select the right projects to invest in and meet ongoing compliance requirements for key stakeholders. For more information about Baker Tilly’s transaction advisory services, visit bakertilly.com/services/transaction-advisory.

###

About Baker Tilly Virchow Krause, LLP (bakertilly.com)

With more than 1,600 employees, Baker Tilly Virchow Krause, LLP (Baker Tilly) provides a wide range of accounting, tax and advisory services. Ranked as one of the 20 largest firms in the United States by Accounting Today (“Top 100 Firms” 2014), Baker Tilly serves clients from offices in Chicago, Detroit, Minneapolis, New York, Washington D.C. and throughout Wisconsin. Baker Tilly is an independent member of Baker Tilly International, a worldwide network of independent accounting and business advisory firms in 137 countries, with more than 26,000 professionals. The combined worldwide revenue of independent member firms is $3.4 billion.

 

Related Stories

K-12 Schools | Aug 8, 2024

New K-12 STEM center hosts robotics learning, competitions in Houston suburb

A new K-12 STEM Center in a Houston suburb is the venue for robotics learning and competitions along with education about other STEM subjects. An unused storage building was transformed into a lively space for students to immerse themselves in STEM subjects. Located in Texas City, the ISD Marathon STEM and Robotics Center is the first of its kind in the district. 

Affordable Housing | Aug 7, 2024

The future of affordable housing may be modular, AI-driven, and made of mushrooms

Demolished in 1989, The Phoenix Ironworks Steel Factory left a five-acre hole in West Oakland, Calif. After sitting vacant for nearly three decades, the site will soon become utilized again in the form of 316 affordable housing units.

Architects | Aug 5, 2024

Mastering the art of project schedule: Expert insights on design and construction

We sat down with two experts in the design field, Ron Dick (Founding Partner and Architect) and Mike Niezer (COO and Architect), to talk about everything you need to know about the entire process.

University Buildings | Aug 1, 2024

UC Riverside’s student health center provides an environment on par with major medical centers

The University of California, Riverside's new Student Health and Counseling Center (SHCC) provides a holistic approach to wellness for students throughout the UC Riverside campus. Designed by HGA and delivered through a design-build partnership with Turner Construction Company, SHCC provides healthcare offerings in an environment on par with major medical centers.

Libraries | Aug 1, 2024

How current and future trends are shaping the libraries of tomorrow

Over the last few years, public libraries have transitioned from being buildings that only store and lend books to being fully featured community centers.

MFPRO+ News | Aug 1, 2024

Canada tries massive incentive program to spur new multifamily housing construction

Canada has taken the unprecedented step of offering billions in infrastructure funds to communities in return for eliminating single-family housing zoning.

Government Buildings | Aug 1, 2024

One of the country’s first all-electric fire stations will use no outside energy sources

Charlotte, N.C.’s new Fire Station #30 will be one of the country’s first all-electric fire stations, using no outside energy sources other than diesel fuel for one or two of the fire trucks. Multiple energy sources will power the station, including solar roof panels and geothermal wells. The two-story building features three truck bays, two fire poles, dispatch area, contamination room, and gear storage.

Contractors | Aug 1, 2024

Nonresidential construction spending decreased 0.2% in June

National nonresidential construction spending declined 0.2% in June, according to an Associated Builders and Contractors analysis of data published today by the U.S. Census Bureau. On a seasonally adjusted annualized basis, nonresidential spending totaled $1.21 trillion. Nonresidential construction has expanded 5.3% from a year ago.

Student Housing | Jul 31, 2024

The University of Michigan addresses a decades-long student housing shortage with a new housing-dining facility

The University of Michigan has faced a decades-long shortage of on-campus student housing. In a couple of years, the situation should significantly improve with the addition of a new residential community on Central Campus in Ann Arbor, Mich. The University of Michigan has engaged American Campus Communities in a public-private partnership to lead the development of the environmentally sustainable living-learning student community.

MFPRO+ New Projects | Jul 31, 2024

Shipping containers converted into attractive, affordable multifamily housing in L.A.

In the Watts neighborhood in Los Angeles, a new affordable multifamily housing project using shipping containers resulted in 24 micro-units for formerly unhoused residents. The containers were acquired from a nearby port and converted into housing units at a factory.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021