Aside from the roof membrane itself, the perimeter roof edge is the most critical component of the roofing system.


By Duro-Last | September 20, 2013
A perimeter roof edge is a termination and transition between the roof and the other building components. It is a roof system’s first line of defense in a wind event; aside from the roof membrane itself, it is the most critical component of the roofing system. It is a component that warrants more scrutiny when designing a roof system.
 
This course describes the ANSI/SPRI ES-1 Standard and the method for determining the correct specifications for perimeter roof edges. It's worth 1.0 AIA LU/HSW.
 
After reading this article, you should be able to:
  • name the three organizations that were involved in developing standards for the perimeter roof edge prior to the adoption of the ANSI/SPRI ES-1 standard by the International Building Code.
  • list the three test procedures that are performed as part of the ANSI/SPRI ES-1 requirement.
  • delineate the five key elements of the roof that affect the performance of the roof edge treatment, as considered in the ANSI/SPRI ES-1 calculation.
  • calculate the adjusted velocity pressures for the coping top, coping face, and coping back of a perimeter roof edge under the ANSI/SPRI ES-1 standard.
 

TAKE THIS FREE BD+C UNIVERSITY COURSE

Related Stories

| Oct 6, 2011

GREENBUILD 2011: Dow Corning features new silicone weather barrier sealant

Modular Design Architecture >Dow Corning 758 sealant used in GreenZone modular high-performance medical facility.

| Oct 4, 2011

GREENBUILD 2011

Click here for the latest news and products from Greenbuild 2011, Oct. 4-7, in Toronto.

| Oct 4, 2011

GREENBUILD 2011: Nearly seamless highly insulated glass curtain-wall system introduced

Low insulation value reflects value of entire curtain-wall system. 

| Oct 3, 2011

Balance bunker and Phase III projects breaks ground at Mitsubishi Plant in Georgia

The facility, a modification of similar facilities used by Mitsubishi Heavy Industries, Inc. (MHI) in Japan, was designed by a joint design team of engineers and architects from The Austin Company of Cleveland, Ohio, MPSA and MHI.

| Sep 12, 2011

Living Buildings: Are AEC Firms up to the Challenge?

Modular Architecture > You’ve done a LEED Gold or two, maybe even a LEED Platinum. But are you and your firm ready to take on the Living Building Challenge? Think twice before you say yes.

| Jul 22, 2011

Air barrier systems: Your guide to optimal performance

Expert advice on how to control wasteful air leakage in the building envelope.

| Jul 22, 2011

Five award-winning modular innovations

The Modular Building Institute's 2011 Awards of Distinction highlight fresh ideas in manufactured construction projects.

| Oct 13, 2010

Community college plans new campus building

Construction is moving along on Hudson County Community College’s North Hudson Campus Center in Union City, N.J. The seven-story, 92,000-sf building will be the first higher education facility in the city.

boombox1
boombox2
native1

More In Category


Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021