Architecture firm Stark James, LLC has released plans for an apartment complex in downtown Phoenix that will be made from shipping containers. According to Jetson Green, the apartment complex, called Containers on Grand, was inspired by the need for affordable and sustainable housing near the city's core.
Containers on Grand will be located at 12th and Grand avenues and constructed with 16 containers to create eight living units, each 740 sf.
Floor plans for the apartments are open and modern, and are designed to accentuate the container structure. Each unit will have one bedroom, a bathroom, a kitchen island, and a large living room with room for storage. Two containers will be joined by cutting away one of the longer sides of each container to be welded together.
The apartments' living areas will open to a central courtyard through double French windows, which will flood the spaces with natural light.
The Containers on Grand complex is expected to be completed by the end of spring. Stark James said that there is a lot of interest in the apartments from young professionals and students who attend Arizona State University's downtown campus. Rent will be $950-$1,000 per month.
Related Stories
Modular Building | May 17, 2016
Oklahoma’s first modular hotel will begin construction next month
Guerdon Modular Buildings will produce 81 modules for this project.
Modular Building | Feb 26, 2016
CHPS releases new program, first model for prefab modular classrooms
Provides standards for indoor air quality, energy efficiency, materials, and waste management.
Game Changers | Feb 5, 2016
Asia’s modular miracle
A prefab construction company in China built a 57-story tower in 19 days. Here’s how they did it.
Game Changers | Feb 4, 2016
GAME CHANGERS: 6 projects that rewrite the rules of commercial design and construction
BD+C’s inaugural Game Changers report highlights today’s pacesetting projects, from a prefab high-rise in China to a breakthrough research lab in the Midwest.
Modular Building | Feb 1, 2016
Hotel developers turn to modular construction to meet demand
A $90 million rebuilding project in Yellowstone National Park exemplifies this trend.
| Jan 14, 2016
How to succeed with EIFS: exterior insulation and finish systems
This AIA CES Discovery course discusses the six elements of an EIFS wall assembly; common EIFS failures and how to prevent them; and EIFS and sustainability.
Modular Building | Dec 13, 2015
Undaunted, Forest City pushes ahead on modular construction
The president of its FC Modular division says new projects are under consideration, even as competitors falter or fall by the wayside.
Greenbuild Report | Dec 1, 2015
Data centers turn to alternative power sources, new heat controls and UPS systems
Data centers account for 2% of the nation’s electricity consumption and about 30% of the power used annually by the economy’s information and communications technology sector, according to the National Renewable Energy Laboratory.
Modular Building | Nov 19, 2015
AECOM and Project Frog form partnership for building modular data centers
The Rapid Deployment Team will provide solutions for data centers both small (1 MW) and large (50+ MW).
Modular Building | Oct 22, 2015
My Micro NY will soon be New York's first micro-apartment building
The Manhattan modular building will be completed in December and will contain apartments with low rents, but small space.