Brand Atlantic Real Estate Partners, Wheelock Street Capital, and B+H Architects released design plans for a new mixed-use office block in West Palm Beach called Banyan & Olive.
The project is intended for technology and finance firms relocating to an area that is becoming known as Wall Street South. “Over the last two years, West Palm Beach has become an emerging destination for finance and tech, with major players in both sectors relocating to the area,” said Patrick Fejer, principal at B+H, in a news release. “With that growth comes a demand for a new type of mixed-use office space that emphasizes mixed-use spaces, luxury amenities to the public realm, and connection to outdoors. This evolution of the local workforce means a change in vision for the downtown. It’s an exciting time to be building in West Palm Beach.”
The development includes the original heritage building on the site, 111 Olive. That structure will be retained, restored, and transformed into a three-story mixed-use tower with ground floor retail, a new marquee restaurant at grade that will have an expansive outdoor patio, and boutique office space on the top two floors. “Previously occupied by a department store, it was paramount that the original art moderne aesthetic be retained to connect back to the historic fabric of the neighborhood,” according to a news release.

A vacant parking lot next to 111 Olive will house 300 Banyan, a 12-story geometric glass tower with Class A office space. It will include an expansive amenity floor equipped with a state-of-the-art indoor/outdoor gym and private outdoor terraces that can be used year-round. The tower will include an elevated parking garage with ground floor retail, a lobby, and food and beverage offerings.
Connecting 111 Olive and 300 Banyan will be a public walkway that can accommodate food and beverage and retail pop ups or cultural programming to foster a sense of community between both buildings. The strategy to integrate with the community reflects the recent revitalization of downtown West Palm Beach into a bustling arts and entertainment district that is now a major player in the finance and tech economy, the release says.
The project will be delivered in two phases: 111 Olive is scheduled for delivery and occupancy in the 4th quarter of 2022; 300 Banyan is scheduled for delivery and occupancy in the 4th quarter of 2023.
Owner and/or developer: Brand Atlantic Real Estate Partners and Wheelock Street Capital
Design architect: B+H Architects
Architect of record: Spina O'Rourke + Partners
MEP engineer: OCI Consulting Engineers
Structural engineer: Bliss & Nyitray, Inc.
General contractor/construction manager: Gilbane
Related Stories
Sponsored | BD+C University Course | Jan 30, 2022
Optimized steel deck design
This course provides an overview of structural steel deck design and the ways to improve building performance and to reduce total-project costs.
Projects | Mar 12, 2019
Disney announces opening dates for Star Wars-themed parks
Star Wars: Galaxy’s Edge is the first Disney park to integrate the Play Disney Parks mobile app for greater immersion.
Contractors | Nov 13, 2017
CBRE completes acquisition of Heery International
The deal is expected to expand the real-estate firm’s project management capacities in several U.S. sectors.
Architects | Oct 31, 2017
AIA selects recipients for the 2017 Innovation Awards
The program honors projects that highlight collaboration between design and construction teams to create better process efficiencies and overall costs savings.
Projects | Sep 13, 2017
A new platform offers a solution to construction cost overruns
Rider Levett Bucknall’s Pulse takes project management deeper into financial analysis and forecasting.
Projects | Apr 17, 2017
BD+C's 2017 Design Innovation Report
Façades that would make Dr. Seuss smile, living walls, and exterior wall space that doubles as gallery space are all represented in this year's BD+C Design Innovation Report.
Projects | Jan 25, 2017
Trump prioritizes infrastructure projects, as rebuilding America is now a hot political potato
Both parties are talking about $1 trillion in spending over the next decade. How projects will be funded, though, remains unresolved.
Projects | Jul 29, 2016
From Construction Site to Court Room: How project management is transforming expert witness teams
Applying goal-oriented methodologies and techniques can increase efficiency and reduce costs associated with litigation.
Projects | Aug 21, 2015
Panama Canal expansion nearing completion
An April 2016 opening is scheduled, which will allow bigger-capacity ships to traverse between the Atlantic and Pacific oceans.