flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

A prefab multifamily housing project will deliver 200 new apartments near downtown Denver

Multifamily Housing

A prefab multifamily housing project will deliver 200 new apartments near downtown Denver

With the eight-story development, Mortenson will showcase its vertical integration capabilities, as the Colorado firm will develop, design, fabricate, and build the community.


By Novid Parsi, Contributing Editor | May 1, 2023
A prefab multifamily housing project will deliver 200 new apartments near downtown Denver
A prefab multifamily housing project will deliver 200 new apartments near downtown Denver

In Denver, Mortenson, a Colorado-based builder, developer, and engineering services provider, along with joint venture partner Pinnacle Partners, has broken ground on Revival on Platte, a multifamily housing project. 

The 234,156-sf development will feature 200 studio, one-bedroom, and two-bedroom apartments on eight floors, with two levels of parking. Resident amenities include an on-site gym, an outdoor flex space facing the river, and a business center with conference rooms and individual workstations. A rooftop deck offers city and mountain views and faces Empower Field at Mile High, home to the Denver Broncos. 

The development is located near downtown Denver and public transit systems. Residents also will have access to eight electric cars dedicated to the community and available via a third-party app. 

The project aims to showcase Mortenson’s vertical integration capabilities, as the firm will develop, design, fabricate, and build the community. The structure will be built with Mortenson’s cold-formed metal stud, steel-framed structural system, with prefabricated interior and exterior walls. 

To construct Revival on Platte, Mortenson will leverage BLUvera, the firm’s manufacturing and fabrication affiliate. BLUvera will prefabricate the walls and exterior panels off-site in a controlled setting, including rough-in of plumbing and HVAC. These components will be trucked in and put into place with cranes.

Mortenson says its highly detailed computer model will help streamline the project delivery process. With exact dimensions, including punch-outs for all penetrations, the model can be sent directly to Mortenson’s manufacturing facility for prefabrication. This will help deliver significant improvements in job site safety, project schedule, quality control, and reduction in construction waste, Mortenson says.

To further mitigate supply chain risks, Mortenson is also using BLU54 to directly procure items including windows, balconies, stairs, lighting, flooring, and railings. All interior finishes and system components have been selected to optimize project delivery and create synergies with Mortenson’s prefabrication capabilities. The firm says the result will be greater certainty in the project process.

Revival on Platte is scheduled for completion in 2024.

On the Building Team:
Developer and contractor: Mortenson
Joint venture partner: Pinnacle Partners
Design architect and architect of record: KEPHART
Consultant architect and MEP engineer: Base4
Civil and landscape: Matrix Design Group
Structural engineers: Fortis Structural, LLC and Martin/Martin

 

Related Stories

| Aug 9, 2019

Whirlpool Debuts Smart All-In-One Washer and Dryer

Whirlpool washer and dryer in one machine can provide laundering solutions in apartments with limited space.

| Aug 9, 2019

'Buildings Don't Lie': A building science reference book worth your time and money

Review of "Buildings Don't Lie," by engineer Henry Gifford.

| Aug 8, 2019

Wilsonart Engineered Surfaces to acquire Czech firm Technistone

U.S. manufacturer Wilsonart, maker of High Pressure Laminate, Quartz, Solid Surface, Coordinated TFL and Edgebanding products, moves to acquire Technistone.

Multifamily Housing | Aug 7, 2019

New start, new life, new friends: Student residence life in the age of Instagram

When it comes to the design and space planning of your residence life program, the quality of the space you create will be reflected in the social media feeds of your students.

Multifamily Housing | Aug 6, 2019

Using P3s to create affordable housing, public services

How the city of Chicago and nonprofit groups partnered to build three libraries plus affordable housing in underserved neighborhoods.

Multifamily Housing | Aug 3, 2019

A plant—or at least its image—grows in Brooklyn

A 90-foot mural overlooks the courtyard of a new residential building.

| Aug 2, 2019

Closet System Adds Value to Grand Rapids Apartment Community

20 Fulton Street East is a 12-story residential community in downtown Grand Rapids, Mich., developed by Brookstone Realty Management, where Organized Living's closet system was installed by dealer Rayhaven Group.

Multifamily Housing | Jul 31, 2019

Amenities war no more? Research report explores multifamily market

Multifamily developers show no signs of pulling back on specialty spaces and unique offerings in an effort to attract high-quality tenants, according to new research from Multifamily Design+Construction.

Multifamily Housing | Jul 31, 2019

100% affordable housing development features 62-units for low-income households

Magnusson Architecture + Planning is designing the project.

Multifamily Housing | Jul 24, 2019

Multifamily transformation: Historic mansion converted to short-term housing for homeless families

The 1885 Victorian home in Cambridge, Mass., gets a new, energy-efficient life as Renae's Place, short-term housing for homeless women and their children.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021