The city of Raleigh, N.C., is ready to break ground on the $387.5 million expansion of its Raleigh Convention Center that will add 300,000 sf to the facility, bringing its total to 800,000 sf.
Scheduled for completion in 2028, the expansion will include 80,000 sf of flexible event space and 30 meeting rooms. It will also be the new home for the Red Hat Amphitheater, which is moving one block south from its current location into a 6,000-person capacity space. Red Hat's new digs should be ready by 2026.
Also see: Metros seeking far bigger convention center spaces
Raleigh is building a 550-key hotel across the street from the convention center. The city is developing this one-acre property with Preston Hollow Community Capital and Provident Resources Group. The hotel will operate under the Omni Hotels & Resorts banner, and include 55,000 sf of meeting space, several food and beverage outlets, a rooftop pool, and spa, and fitness center. The hotel is scheduled to open in 2027.
A joint venture consisting of Skanska, Clancy & Theys, and D.A. Everett is managing the construction of the convention center expansion, which was designed by TVS and RATIO Design. Cumming Group and Cate Services are the owner’s reps on this project.
A record boost in convention-related visitors
Raleigh Convention Center and Red Hat Amphitheater are part of The Complex, a group of convention and entertainment venues that also includes Martin Marietta Center for the Performing Arts, and the Coastal Credit Union Music Part at Walnut Creek. Combined, these venues attract over 1.3 million visitors annually. Kerry Painter, The Complex’s Executive Manager, said in a prepared statement that the vision for the convention center expansion “is to create a space that can be something for everyone––welcoming, accessible, smart, and convenient.”
Chris Whitley, Jr., a vice president with Cumming Group, added that the expansion is addressing “the growing demand from our community for larger, more versatile event spaces.”
Last August, Wake County (N.C.) commissioners approved the funding for this project, using tax money from hotel stays and restaurant meals. Thirty-two million dollars of funding will pay for the relocation of Red Hat Amphitheater. Another $75 million in funding will go toward the hotel’s construction.
TVS, which is based in Atlanta, designed the existing convention center, and Skanska completed its construction in 2008. The convention center includes a 150,000-sf exhibit hall, 20 meeting rooms totaling 30,000 sf, and a 32,000-sf grand ballroom that can seat 2,400.
The city stated that it chose TVS and RATIO Design to design the expansion because of their international design experience, according to Exhibitor magazine’s website. Exhibitor also reported that fiscal 2023 was a record-breaking year for Raleigh Convention Center, which booked over 100,000 hotel room nights from convention-related business in conjunction with the Greater Raleigh Convention and Visitors Bureau.
Related Stories
| Sep 22, 2014
4 keys to effective post-occupancy evaluations
Perkins+Will's Janice Barnes covers the four steps that designers should take to create POEs that provide design direction and measure design effectiveness.
| Sep 22, 2014
Sound selections: 12 great choices for ceilings and acoustical walls
From metal mesh panels to concealed-suspension ceilings, here's our roundup of the latest acoustical ceiling and wall products.
| Sep 9, 2014
Using Facebook to transform workplace design
As part of our ongoing studies of how building design influences human behavior in today’s social media-driven world, HOK’s workplace strategists had an idea: Leverage the power of social media to collect data about how people feel about their workplaces and the type of spaces they need to succeed.
| Sep 3, 2014
Ranked: Top local government sector AEC firms [2014 Giants 300 Report]
STV, HOK, and Turner top BD+C's rankings of the nation's largest local government design and construction firms, as reported in the 2014 Giants 300 Report.
| Sep 3, 2014
New designation launched to streamline LEED review process
The LEED Proven Provider designation is designed to minimize the need for additional work during the project review process.
| Sep 2, 2014
Ranked: Top green building sector AEC firms [2014 Giants 300 Report]
AECOM, Gensler, and Turner top BD+C's rankings of the nation's largest green design and construction firms.
| Aug 21, 2014
Ranked: Top convention center AEC firms [2014 Giants 300 Report]
Gensler, AECOM, and Hunt Construction top BD+C's rankings of the nation's largest convention center design and construction firms.
| Aug 19, 2014
HOK to acquire 360 Architecture
Expected to be finalized by the end of October, the acquisition of 360 Architecture will provide immediate benefits to both firms’ clients worldwide as HOK re-enters the sports and entertainment market.
| Aug 5, 2014
Shigeru Ban-designed Aspen Art Museum will open doors to public this week
After 18 month of planning and construction, the museum will open its new Shigeru Ban-designed facility to the public on August 9.
| Jul 28, 2014
Reconstruction market benefits from improving economy, new technology [2014 Giants 300 Report]
Following years of fairly lackluster demand for commercial property remodeling, reconstruction revenue is improving, according to the 2014 Giants 300 report.