Rental vs. purchase: How to minimize job site costs

Sponsored Content Contractors

Rental vs. purchase: How to minimize job site costs

Smart business decisions can mean the difference between being ‘on budget’ and going ‘way over’ budget.  


By CORT | September 5, 2016

Rental vs. purchase: How to minimize job site costs. Photo courtesy of CORT. 

With total U.S. construction starts projected to rise by 6 percent in 2016, the construction industry continues on its steady rise. Its expansion is contributing to an increase in corporate projects and profits. To make the most of the upturn, construction companies are having to focus on keeping costs low, working to allocate resources in the most efficient and effective manner possible.

As commercial and institutional building starts increase, it is essential to keep your company’s current projects on time and on budget, all while pursuing the market’s wealth of new leads. One way this challenge can be met is by exploring options that avoid investing time and money into purchasing and managing permanent assets.

There are many benefits to renting instead of purchasing assets for a construction site. Construction sites are dynamic, ever changing and require temporary workspaces to get the job done. Instead of purchasing resources to fill these transitory spaces, renting or leasing equipment that is needed for only the duration of the project can often reduce your company’s capital expenditures. Rental helps to ensure that your time and money is spent managing the projects, not the assets. Several kinds of on-site resources can be leased with these benefits.

For example, furniture rental is a viable alternative to purchasing permanent assets. Furniture rental eliminates the costs of storing on-site furniture between projects, making it an even more financially sound option. Its flexible nature allows you to avoid being stuck with outdated assets. As the needs of the construction site change, rented assets can easily be added or removed to match your company’s current situation, without jeopardizing your time or budget.

One of the greatest benefits of leasing over purchase is the reduced amount of time you are required to spend managing it. Its adaptable nature is designed to help you keep up with the fluctuating lifecycle of construction starts, without wasting your time.

Managing projects and budget is crucial to the success of construction companies. To learn more about how furniture rental can help on your next project, visit CORT.com.

Related Stories

Museums | Aug 29, 2024

Bjarke Ingels' Suzhou Museum of Contemporary Art conceived as village of 12 pavilions

The 60,000-sm Suzhou Museum of Contemporary Art in Suzhou, Jiangsu, China recently topped out. Designed by Bjarke Ingels Group (BIG), the museum is conceived as a village of 12 pavilions, offering a modern interpretation of the elements that have defined the city’s urbanism, architecture, and landscape for centuries. 

Adaptive Reuse | Aug 28, 2024

Cities in Washington State will offer tax breaks for office-to-residential conversions

A law passed earlier this year by the Washington State Legislature allows developers to defer sales and use taxes if they convert existing structures, including office buildings, into affordable housing.

Industrial Facilities | Aug 28, 2024

UK-based tire company plans to build the first carbon-neutral tire factory in the U.S.

ENSO, a U.K.-based company that makes tires for electric vehicles, has announced plans to build the first carbon-neutral tire factory in the U.S. The $500 million ENSO technology campus will be powered entirely by renewable energy. The first-of-its-kind tire factory aims to be carbon neutral without purchased offsets, using carbon-neutral raw materials and building materials. 

Building Technology | Aug 23, 2024

Top-down construction: Streamlining the building process | BD+C

Learn why top-down construction is becoming popular again for urban projects and how it can benefit your construction process in this comprehensive blog.

Airports | Aug 22, 2024

Portland opens $2 billion mass timber expansion and renovation to its international airport  

This month, the Portland International Airport (PDX) main terminal expansion opened to passengers. Designed by ZGF for the Port of Portland, the 1 million-sf project doubles the capacity of PDX and enables the airport to welcome 35 million passengers per year by 2045.

Adaptive Reuse | Aug 22, 2024

6 key fire and life safety considerations for office-to-residential conversions

Office-to-residential conversions may be fraught with fire and life safety challenges, from egress requirements to fire protection system gaps. Here are six important considerations to consider.

Contractors | Aug 22, 2024

Growing a $250 million business by focusing on preconstruction, with Wes Palmisano

One of the most critical aspects of successfully growing a construction company is the often-overlooked preconstruction phase.

Resiliency | Aug 22, 2024

Austin area evacuation center will double as events venue

A new 45,000 sf FEMA-operated evacuation shelter in the Greater Austin metropolitan area will begin construction this fall. The center will be available to house people in the event of a disaster such as a major hurricane and double as an events venue when not needed for emergency shelter.

Contractors | Aug 22, 2024

Why all construction business problems are people problems, with Eric Anderton

In the chaotic construction world where systematization is not a norm, it’s safe to say that people’s problems remain the biggest main challenge.

Contractors | Aug 21, 2024

The average U.S. contractor has 8.4 months worth of construction work in the pipeline, as of July 2024

Associated Builders and Contractors reported today that its Construction Backlog Indicator held steady at 8.4 months in July, according to an ABC member survey conducted July 22 to Aug. 6. The reading is down 0.9 months from July 2023.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021