Winners of the 2011 Contractor Project of the Year Competition were announced by Sika Sarnafil. Winners were judged on project complexity, design uniqueness, craftsmanship, and creative problem solving.
Winners include:
- TD Garden in Boston, Mass;
- Grand Harbor Condominium in Destin, Fla;
- New office complex in Warminster, Pa.; and
- Griffin Hall, Northern Kentucky University in Highland Heights, Ky.
A winner and two finalists in four different categories: Low Slope, Steep Slope, Waterproofing and Sustainability were recognized for outstanding workmanship in completing a project using a Sika Sarnafil thermoplastic membrane for roofing or waterproofing applications.
Low Slope Category Winners
Greenwood Industries, Inc. of Millbury, Mass. won first place in the Low Slope category for the re-roofing of the TD Garden, home to the Boston Bruins and Boston Celtics. The 19,600-seat arena has a distinctive barrel roof now covered with an energy-efficient Sika Sarnafil EnergySmart Roof System. During the project Greenwood worked around a continuous schedule of TD Garden events and even withstood a hurricane to complete the project. The second place winner was All Weather Waterproofing, Inc., Salt Lake City, Utah, for the Wilkinson Student Center at Brigham Young University, Provo, Utah. Third place went to Letner Roofing Company, Inc., Orange, Calif., for the Pacific Design Center “Red” Building in West Hollywood, Calif.
Steep Slope Category Winners
In the Steep Slope category, Bel-Mac Roofing, Inc., of Santa Rosa Beach, Fla., was awarded first place for their work on Grand Harbor Condominium in Destin, Fla. High winds, numerous roof levels, and a complex geometric roof design pushed the Bel-Mac crew. The company’s creative problem solving enabled them to install a watertight Sika Sarnafil Décor Roof System that preserves the upscale look established by the condo’s failed standing seam metal roof. Peach State Roofing, Inc., Lawrenceville, Ga., was the second place finisher for the Catholic Center at the University of Georgia, Athens, GA, and Diamond Roofing Company, Inc., Syracuse, N.Y., was the third place finalist for the Finger Lakes Residential Center in Lansing, N.Y.
Waterproofing Category Winners
Tecta America Zero Company, LLC, based in Cincinnati, Ohio, took first place in the Waterproofing class for Griffin Hall, Northern Kentucky University in Highland Heights, Ky. The company battled weather conditions and an aggressive schedule for this newly constructed facility, which involved three distinct roof areas and included a vegetated green roof protected by Sika Sarnafil’s G476 waterproofing membrane. Second place in this category went to A-1 Roofing Company, Elk Grove Village, Ill., for the United Cargo Facility in Chicago, and third place to CitiRoof Corporation in Columbia, Md., for the H.D. Woodson High School in Washington, D.C.
Sustainability Category Winners
In the Sustainability category, Delta Contracting Services, Inc., of East Brunswick, N.J., was awarded first place for a new office complex in Warminster, Pa. This facility received a very high worldwide LEED score for newly constructed office buildings and garnered a LEED Platinum Certification. In second place was Morris Roofing & Sheet Metal Corporation, Springfield, Mass., for the Mass Mutual headquarters in Springfield, Mass., and in third place for this grouping was Progressive Roofing, LLC, of Phoenix, Ariz. for the Wells Fargo Arena at Arizona State University in Tempe, Ariz. BD+C
Related Stories
K-12 Schools | Aug 8, 2024
New K-12 STEM center hosts robotics learning, competitions in Houston suburb
A new K-12 STEM Center in a Houston suburb is the venue for robotics learning and competitions along with education about other STEM subjects. An unused storage building was transformed into a lively space for students to immerse themselves in STEM subjects. Located in Texas City, the ISD Marathon STEM and Robotics Center is the first of its kind in the district.
Affordable Housing | Aug 7, 2024
The future of affordable housing may be modular, AI-driven, and made of mushrooms
Demolished in 1989, The Phoenix Ironworks Steel Factory left a five-acre hole in West Oakland, Calif. After sitting vacant for nearly three decades, the site will soon become utilized again in the form of 316 affordable housing units.
Architects | Aug 5, 2024
Mastering the art of project schedule: Expert insights on design and construction
We sat down with two experts in the design field, Ron Dick (Founding Partner and Architect) and Mike Niezer (COO and Architect), to talk about everything you need to know about the entire process.
University Buildings | Aug 1, 2024
UC Riverside’s student health center provides an environment on par with major medical centers
The University of California, Riverside's new Student Health and Counseling Center (SHCC) provides a holistic approach to wellness for students throughout the UC Riverside campus. Designed by HGA and delivered through a design-build partnership with Turner Construction Company, SHCC provides healthcare offerings in an environment on par with major medical centers.
Libraries | Aug 1, 2024
How current and future trends are shaping the libraries of tomorrow
Over the last few years, public libraries have transitioned from being buildings that only store and lend books to being fully featured community centers.
MFPRO+ News | Aug 1, 2024
Canada tries massive incentive program to spur new multifamily housing construction
Canada has taken the unprecedented step of offering billions in infrastructure funds to communities in return for eliminating single-family housing zoning.
Government Buildings | Aug 1, 2024
One of the country’s first all-electric fire stations will use no outside energy sources
Charlotte, N.C.’s new Fire Station #30 will be one of the country’s first all-electric fire stations, using no outside energy sources other than diesel fuel for one or two of the fire trucks. Multiple energy sources will power the station, including solar roof panels and geothermal wells. The two-story building features three truck bays, two fire poles, dispatch area, contamination room, and gear storage.
Contractors | Aug 1, 2024
Nonresidential construction spending decreased 0.2% in June
National nonresidential construction spending declined 0.2% in June, according to an Associated Builders and Contractors analysis of data published today by the U.S. Census Bureau. On a seasonally adjusted annualized basis, nonresidential spending totaled $1.21 trillion. Nonresidential construction has expanded 5.3% from a year ago.
Student Housing | Jul 31, 2024
The University of Michigan addresses a decades-long student housing shortage with a new housing-dining facility
The University of Michigan has faced a decades-long shortage of on-campus student housing. In a couple of years, the situation should significantly improve with the addition of a new residential community on Central Campus in Ann Arbor, Mich. The University of Michigan has engaged American Campus Communities in a public-private partnership to lead the development of the environmentally sustainable living-learning student community.
MFPRO+ New Projects | Jul 31, 2024
Shipping containers converted into attractive, affordable multifamily housing in L.A.
In the Watts neighborhood in Los Angeles, a new affordable multifamily housing project using shipping containers resulted in 24 micro-units for formerly unhoused residents. The containers were acquired from a nearby port and converted into housing units at a factory.