flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Ryan Companies breaks ground on 122-acre Highland Bridge redevelopment in St. Paul, Minn.

Mixed-Use

Ryan Companies breaks ground on 122-acre Highland Bridge redevelopment in St. Paul, Minn.

The community’s goal is to provide 100% renewable energy to its houses and businesses.


By John Caulfield, Senior Editor | July 17, 2020

The Highland Bridge redevelopment in St. Paul, Minn., is expected to take 15 years to complete. Images: Ryan Companies

On a 122-acre site along the Mississippi River in St. Paul, Minn., where Ford Motor Co. operated a plant for 84 years until it closed in 2011, Ryan Companies recently broke ground virtually on an ambitious mixed-use development named Highland Bridge. When completed, this transformed community will feature 3,800 housing units, 265,000 sf of office space, 150,000 sf of retail space, 50,000 sf of civic or institutional space, and 55 acres of public and open space with over 10 bike and pedestrian paths covering five miles.

This $1.3 billion project—whose funding includes $320 million in public and private investments for parks, infrastructure, affordable housing, and tax-increment financing—has been a decade in the making. Bringing the master plan to life involved 45 public meetings that drew 1,300 attendees, and 80 presentations to business, civic, and nonprofit groups.

In 2017, Ford enlisted CBRE for the land-sale phase, and Ryan Companies was awarded the parcel in the spring of 2018. “We had a good partner in Ford, and the Mayor and City Council were supportive, and ultimately came to the table with a large public investment,” says Tony Barranco, Ryan Companies’ senior vice president of development. He adds that Ford “to its credit” let the city guide the redevelopment.

Also see: Video of virtual groundbreaking for Highland Bridge

Last December, Ryan and the city entered into a public-private partnernship. Ryan also partnered with Xcel Energy to achieve the goal of providing 100% renewable energy to the site through a subscription-based program that would allow residents and businesses to tap locally generated solar and hydro power. Electric charging stations will be available throughout the community’s six zoning districts.

Ryan is the master developer on Highland Bridge, and has about 200 employees working on this project, including its Ryan A+E group that is the architect and civil engineer. Barranco says that Ryan intends to subcontract some of the production and design.

Pulte Homes, the national brand of PulteGroup, the nation’s third-largest home builder, will build and deliver 320 row homes that range from 1,900 to 3,000 sf and whose prices will start in the upper $300,000s. Pulte plans to begin construction this winter, and deliver its first units during the Winter of 2021.

The communitiy's 55 acres of park and open space will include public plazas.

 

A MIX OF MARKET-RATE AND AFFORDABLE HOMES

One-fifth of Highland Bridge’s housing will be earmarked for low- and medium-income buyers. Three hundred eighty homes will target households earning 30% of the area median income, 190 units will target households earning 50% of AMI, with another 190 for households earning 60% of AMI. The builders Project for Pride in Living, CommonBond Communities, and Habitat for Humanity will deliver most of the affordable housing for the community.

Also see: New affordable housing development comes to the Bay Area

Twin Cities-based Presbyterian Homes will develop Highland Bridge’s senior living component. And Weidner Apartment Homes will be the primary developer of the community’s market-rate multifamily housing.

The development team for Highland Bridge also involves Wells Fargo (the financing partner for land acquisition and infrastructure development), CBRE (retail leasing), Colliers International (financing for tax-increment funds for infrastructure), the Capitol Regional Watershed District (stormwater management and watershed sustainability), and the Metropolitan Council (community planning).

Barranco says the buildout for Highland Bridge should be completed in 15 years. The initial infrastructure will be put in place by the fall of 2021, and the rest by 2025. The bulk of the vertical construction will be completed over the next five to 10 years. 

HIGH EXPECTATIONS

Water features will be among the public amenities at Highland Bridge.

 

“It’s an incredible piece of property, in an established neighborhood,” says Barranco. “It’s not often that you get the chance to redevelop 122 acres, and of all the challenges, probably the biggest is the massive expectation about getting it right.”

He says that project’s proximity to the Mississippi River “is definitely an asset” because of the river’s existing trail system and hydro-electric opportunities. He notes that there are setback and height requirements that the redevelopment must adhere to.

When asked whether current events gave Ryan pause about starting this project now, Barranco replies that “while we did not anticipate a pandemic, we were deliberate that [the plan] would be durable and might go through one or two recessions.”

Obviously, the city’s leaders are optimistic: Highland Bridge is expected to add $18 million per year in new tax revenue to St. Paul’s tax base.

Tags

Related Stories

| May 20, 2011

Hotels taking bath out of the bathroom

Bathtubs are disappearing from many hotels across the country as chains use the freed-up space to install ever more luxurious showers, according to a recent USAToday report. Of course, we reported on this move--and 6 other hospitality trends--back in 2006 in our special report "The Inn Things: Seven Radical New Trends in Hotel Design."

| May 18, 2011

Design diversity celebrated at Orange County club

The Orange County, Calif., firm NKDDI designed the 22,000-sf Luna Lounge & Nightclub in Pomona, Calif., to be a high-end multipurpose event space that can transition from restaurant to lounge to nightclub to music venue.

| Apr 12, 2011

Retail complex enjoys prime Abu Dhabi location

The Galleria at Sowwah Square in Abu Dhabi will be built in a prime location within Sowwah Island that also includes a five-star Four Seasons Hotel, the healthcare facility Cleveland Clinic Abu Dhabi, and nearly two million sf of Class A office space.

| Mar 11, 2011

Holiday Inn reworked for Downtown Disney Resort

The Orlando, Fla., office of VOA Associates completed a comprehensive interior and exterior renovation of the 14-story Holiday Inn in the Downtown Disney Resort in Lake Buena Vista, Fla. The $25 million project involved rehabbing the hotel’s 332 guest rooms, atrium, swimming pool, restaurant, fitness center, and administrative spaces.

| Mar 11, 2011

Guests can check out hotel’s urban loft design, music selection

MODO, Advaya Hospitality’s affordable new lifestyle hotel brand, will have an urban Bauhaus loft design and target design-, music-, and tech-savvy guest who will have access to thousands of tracks in vinyl, CD, and MP3 formats through a partnership with Downtown Music. Guest can create their own playlists, and each guest room will feature iPod docks and large flat-screen TVs.

| Mar 11, 2011

Texas A&M mixed-use community will focus on green living

HOK, Realty Appreciation, and Texas A&M University are working on the Urban Living Laboratory, a 1.2-million-sf mixed-use project owned by the university. The five-phase, live-work-play project will include offices, retail, multifamily apartments, and two hotels.

| Mar 9, 2011

Igor Krnajski, SVP with Denihan Hospitality Group, on hotel construction and understanding the industry

Igor Krnajski, SVP for Design and Construction with Denihan Hospitality Group, New York, N.Y., on the state of hotel construction, understanding the hotel operators’ mindset, and where the work is.

| Feb 15, 2011

Iconic TWA terminal may reopen as a boutique hotel

The Port Authority of New York and New Jersey hopes to squeeze a hotel with about 150 rooms in the space between the old TWA terminal and the new JetBlue building. The old TWA terminal would serve as an entry to the hotel and hotel lobby, which would also contain restaurants and shops.

| Feb 11, 2011

Kentucky’s first green adaptive reuse project earns Platinum

(FER) studio, Inglewood, Calif., converted a 115-year-old former dry goods store in Louisville, Ky., into a 10,175-sf mixed-use commercial building earned LEED Platinum and holds the distinction of being the state’s first adaptive reuse project to earn any LEED rating. The facility, located in the East Market District, houses a gallery, event space, offices, conference space, and a restaurant. Sustainable elements that helped the building reach its top LEED rating include xeriscaping, a green roof, rainwater collection and reuse, 12 geothermal wells, 81 solar panels, a 1,100-gallon ice storage system (off-grid energy efficiency is 68%) and the reuse and recycling of construction materials. Local firm Peters Construction served as GC.

| Jan 25, 2011

AIA reports: Hotels, retail to lead U.S. construction recovery

U.S. nonresidential construction activity will decline this year but recover in 2012, led by hotel and retail sectors, according to a twice-yearly forecast by the American Institute of Architects. Overall nonresidential construction spending is expected to fall by 2% this year before rising by 5% in 2012, adjusted for inflation. The projected decline marks a deteriorating outlook compared to the prior survey in July 2010, when a 2011 recovery was expected.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021