It took nearly two decades, but a design-build team finally broke ground last month on a new branch of the public library system for the city of San Diego.
The 14,376-sf Mission Hills-Hillcrest Harley & Bessie Knox Public Library—named after the city’s former mayor and his wife, whose family is one of the new library’s donors—will be nearly four times larger than the 3,850-sf, 56-year-old branch it replaces.
The Craftsman-style, single-story facility, designed under the direction of Manuel Oncina Architects (which has worked on nine libraries for San Diego County since 1995) and Ferguson Pape Baldwin Architects, will include a study space, a computer lab, a meeting room for community events, and children’s and teens rooms.
The children’s area will recall the Hobbit houses seen in the “Lord of the Rings” movies, but with trellises that are wired for Internet connectivity.
“In general, libraries have morphed over the years,” says Andy Feth, project manager for C.W. Driver Companies, which is providing construction management and design-build services for this project. “They’ve become community gathering places.”
Feth tells BD+C that the community played a big role during the design process, which began 18 months ago. One of the community’s concerns was that the library would have adequate parking, which is scarce in San Diego. The new library will sit atop a 30,000-sf, garage, two stories below grade, with 85 parking spaces, or 76 more than the older facility.
This $17.9 million project had been put on hold for years because of the city’s financial shortfalls. It finally moved forward after the Knox and Hervey families each donated $5 million, according to the San Diego Union-Tribune. City infrastructure bond funds contributed $10 million, and the rest came from other private donors, which is earmarked for more books, computers, 3D printers and other technologies.
Feth says the library—which is being built on the site of the old International Brotherhood of Electrical Workers building—is targeting LEED Gold certification, and will include energy efficient LED lighting and natural daylight streaming through clerestory windows in a 25-ft-high ceiling in the middle of the building.
The new library is scheduled for completion October 2018, which means it might open by Christmas of that year, he says.
Related Stories
| Oct 9, 2014
Regulations, demand will accelerate revenue from zero energy buildings, according to study
A new study by Navigant Research projects that public- and private-sector efforts to lower the carbon footprint of new and renovated commercial and residential structures will boost the annual revenue generated by commercial and residential zero energy buildings over the next 20 years by 122.5%, to $1.4 trillion.
| Sep 29, 2014
Snøhetta releases final plan for terraced central library in Calgary
The competition-winning New Central Library is now in the final design stages, after two years of community engagement on the part of design firms Snøhetta and DIALOG.
| Sep 24, 2014
Architecture billings see continued strength, led by institutional sector
On the heels of recording its strongest pace of growth since 2007, there continues to be an increasing level of demand for design services signaled in the latest Architecture Billings Index.
| Sep 22, 2014
4 keys to effective post-occupancy evaluations
Perkins+Will's Janice Barnes covers the four steps that designers should take to create POEs that provide design direction and measure design effectiveness.
| Sep 22, 2014
Sound selections: 12 great choices for ceilings and acoustical walls
From metal mesh panels to concealed-suspension ceilings, here's our roundup of the latest acoustical ceiling and wall products.
| Sep 9, 2014
Using Facebook to transform workplace design
As part of our ongoing studies of how building design influences human behavior in today’s social media-driven world, HOK’s workplace strategists had an idea: Leverage the power of social media to collect data about how people feel about their workplaces and the type of spaces they need to succeed.
| Sep 7, 2014
Behind the scenes of integrated project delivery — successful tools and applications
The underlying variables and tools used to manage collaboration between teams is ultimately the driving for success with IPD, writes CBRE Healthcare's Megan Donham.
| Sep 3, 2014
New designation launched to streamline LEED review process
The LEED Proven Provider designation is designed to minimize the need for additional work during the project review process.
| Sep 2, 2014
Ranked: Top green building sector AEC firms [2014 Giants 300 Report]
AECOM, Gensler, and Turner top BD+C's rankings of the nation's largest green design and construction firms.
| Aug 25, 2014
Ranked: Top cultural facility sector AEC firms [2014 Giants 300 Report]
Arup, Gensler, and Turner head BD+C's rankings of design and construction firms with the most revenue from cultural facility projects, as reported in the 2014 Giants 300 Report.