It took nearly two decades, but a design-build team finally broke ground last month on a new branch of the public library system for the city of San Diego.
The 14,376-sf Mission Hills-Hillcrest Harley & Bessie Knox Public Library—named after the city’s former mayor and his wife, whose family is one of the new library’s donors—will be nearly four times larger than the 3,850-sf, 56-year-old branch it replaces.
The Craftsman-style, single-story facility, designed under the direction of Manuel Oncina Architects (which has worked on nine libraries for San Diego County since 1995) and Ferguson Pape Baldwin Architects, will include a study space, a computer lab, a meeting room for community events, and children’s and teens rooms.
The children’s area will recall the Hobbit houses seen in the “Lord of the Rings” movies, but with trellises that are wired for Internet connectivity.
“In general, libraries have morphed over the years,” says Andy Feth, project manager for C.W. Driver Companies, which is providing construction management and design-build services for this project. “They’ve become community gathering places.”
Feth tells BD+C that the community played a big role during the design process, which began 18 months ago. One of the community’s concerns was that the library would have adequate parking, which is scarce in San Diego. The new library will sit atop a 30,000-sf, garage, two stories below grade, with 85 parking spaces, or 76 more than the older facility.
This $17.9 million project had been put on hold for years because of the city’s financial shortfalls. It finally moved forward after the Knox and Hervey families each donated $5 million, according to the San Diego Union-Tribune. City infrastructure bond funds contributed $10 million, and the rest came from other private donors, which is earmarked for more books, computers, 3D printers and other technologies.
Feth says the library—which is being built on the site of the old International Brotherhood of Electrical Workers building—is targeting LEED Gold certification, and will include energy efficient LED lighting and natural daylight streaming through clerestory windows in a 25-ft-high ceiling in the middle of the building.
The new library is scheduled for completion October 2018, which means it might open by Christmas of that year, he says.
Related Stories
| Jul 18, 2014
Top Engineering/Architecture Firms [2014 Giants 300 Report]
Jacobs, AECOM, Parsons Brinckerhoff top Building Design+Construction's 2014 ranking of the largest engineering/architecture firms in the United States.
| Jul 18, 2014
Top Engineering Firms [2014 Giants 300 Report]
Fluor, Arup, Day & Zimmermann top Building Design+Construction's 2014 ranking of the largest engineering firms in the United States.
| Jul 18, 2014
Top Architecture Firms [2014 Giants 300 Report]
Gensler, Perkins+Will, NBBJ top Building Design+Construction's 2014 ranking of the largest architecture firms in the United States.
| Jul 18, 2014
2014 Giants 300 Report
Building Design+Construction magazine's annual ranking the nation's largest architecture, engineering, and construction firms in the U.S.
| Jul 7, 2014
7 emerging design trends in brick buildings
From wild architectural shapes to unique color blends and pattern arrangements, these projects demonstrate the design possibilities of brick.
| Jul 2, 2014
Emerging trends in commercial flooring
Rectangular tiles, digital graphic applications, the resurgence of terrazzo, and product transparency headline today’s commercial flooring trends.
| Jun 30, 2014
Research finds continued growth of design-build throughout United States
New research findings indicate that for the first time more than half of projects above $10 million are being completed through design-build project delivery.
| Jun 18, 2014
Arup uses 3D printing to fabricate one-of-a-kind structural steel components
The firm's research shows that 3D printing has the potential to reduce costs, cut waste, and slash the carbon footprint of the construction sector.
| Jun 16, 2014
6 U.S. cities at the forefront of innovation districts
A new Brookings Institution study records the emergence of “competitive places that are also cool spaces.”
| Jun 12, 2014
Austrian university develops 'inflatable' concrete dome method
Constructing a concrete dome is a costly process, but this may change soon. A team from the Vienna University of Technology has developed a method that allows concrete domes to form with the use of air and steel cables instead of expensive, timber supporting structures.