It took nearly two decades, but a design-build team finally broke ground last month on a new branch of the public library system for the city of San Diego.
The 14,376-sf Mission Hills-Hillcrest Harley & Bessie Knox Public Library—named after the city’s former mayor and his wife, whose family is one of the new library’s donors—will be nearly four times larger than the 3,850-sf, 56-year-old branch it replaces.
The Craftsman-style, single-story facility, designed under the direction of Manuel Oncina Architects (which has worked on nine libraries for San Diego County since 1995) and Ferguson Pape Baldwin Architects, will include a study space, a computer lab, a meeting room for community events, and children’s and teens rooms.
The children’s area will recall the Hobbit houses seen in the “Lord of the Rings” movies, but with trellises that are wired for Internet connectivity.
“In general, libraries have morphed over the years,” says Andy Feth, project manager for C.W. Driver Companies, which is providing construction management and design-build services for this project. “They’ve become community gathering places.”
Feth tells BD+C that the community played a big role during the design process, which began 18 months ago. One of the community’s concerns was that the library would have adequate parking, which is scarce in San Diego. The new library will sit atop a 30,000-sf, garage, two stories below grade, with 85 parking spaces, or 76 more than the older facility.
This $17.9 million project had been put on hold for years because of the city’s financial shortfalls. It finally moved forward after the Knox and Hervey families each donated $5 million, according to the San Diego Union-Tribune. City infrastructure bond funds contributed $10 million, and the rest came from other private donors, which is earmarked for more books, computers, 3D printers and other technologies.
Feth says the library—which is being built on the site of the old International Brotherhood of Electrical Workers building—is targeting LEED Gold certification, and will include energy efficient LED lighting and natural daylight streaming through clerestory windows in a 25-ft-high ceiling in the middle of the building.
The new library is scheduled for completion October 2018, which means it might open by Christmas of that year, he says.
Related Stories
| Jan 13, 2014
Custom exterior fabricator A. Zahner unveils free façade design software for architects
The web-based tool uses the company's factory floor like "a massive rapid prototype machine,” allowing designers to manipulate designs on the fly based on cost and other factors, according to CEO/President Bill Zahner.
| Jan 11, 2014
Getting to net-zero energy with brick masonry construction [AIA course]
When targeting net-zero energy performance, AEC professionals are advised to tackle energy demand first. This AIA course covers brick masonry's role in reducing energy consumption in buildings.
Smart Buildings | Jan 7, 2014
9 mega redevelopments poised to transform the urban landscape
Slowed by the recession—and often by protracted negotiations—some big redevelopment plans are now moving ahead. Here’s a sampling of nine major mixed-use projects throughout the country.
| Dec 13, 2013
Safe and sound: 10 solutions for fire and life safety
From a dual fire-CO detector to an aspiration-sensing fire alarm, BD+C editors present a roundup of new fire and life safety products and technologies.
| Dec 10, 2013
16 great solutions for architects, engineers, and contractors
From a crowd-funded smart shovel to a why-didn’t-someone-do-this-sooner scheme for managing traffic in public restrooms, these ideas are noteworthy for creative problem-solving. Here are some of the most intriguing innovations the BD+C community has brought to our attention this year.
| Dec 9, 2013
Tips for designing higher education's newest building type: the learning commons
In this era of scaled-down budgets, maximized efficiencies, new learning methods and social media’s domination of face time, college and university campuses are gravitating toward a new space type: the learning commons.
| Nov 27, 2013
Wonder walls: 13 choices for the building envelope
BD+C editors present a roundup of the latest technologies and applications in exterior wall systems, from a tapered metal wall installation in Oklahoma to a textured precast concrete solution in North Carolina.
| Nov 26, 2013
Construction costs rise for 22nd straight month in November
Construction costs in North America rose for the 22nd consecutive month in November as labor costs continued to increase, amid growing industry concern over the tight availability of skilled workers.
| Nov 25, 2013
Building Teams need to help owners avoid 'operational stray'
"Operational stray" occurs when a building’s MEP systems don’t work the way they should. Even the most well-designed and constructed building can stray from perfection—and that can cost the owner a ton in unnecessary utility costs. But help is on the way.
| Nov 19, 2013
Top 10 green building products for 2014
Assa Abloy's power-over-ethernet access-control locks and Schüco's retrofit façade system are among the products to make BuildingGreen Inc.'s annual Top-10 Green Building Products list.