flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

San Francisco seeks proposals for adaptive reuse of underutilized downtown office buildings

Multifamily Housing

San Francisco seeks proposals for adaptive reuse of underutilized downtown office buildings

The initiative builds on effort to make office conversion projects faster and easier.


By Peter Fabris, Contributing Editor  | July 25, 2023
Photo by KEHN HERMANO, Pexels
Photo by KEHN HERMANO, Pexels

The City of San Francisco released a Request For Interest to identify office building conversions that city officials could help expedite with zoning changes, regulatory measures, and financial incentives.

The city’s Office of Economic and Workforce Development and Planning Departments are seeking responses from downtown building owners and sponsors on proposals to convert underused commercial space into housing or other uses. The announcement identifies “office-to-housing” projects as a particular interest, but responses may include conversions of non-residential floor area for other uses.

This is San Francisco’s latest step in an effort to revitalize its downtown in a post Covid-environment where office space is underused while formerly downtown-based employees work from home part-time or full time.

The city recently sponsored a study on how to boost vitality in its financial district. The panel that undertook the study offered recommendations including:

  • Creating downtown destination zones through ground-plane activation to help transform public spaces and empty storefronts into city attractions.
  • Reducing and restructuring businesses taxes, including the gross receipts tax, commercial rents tax, CEO tax, and transfer tax.
  • Providing incentives for office-to-residential conversions to tackle the housing shortage.
  • Offering other incentives, such as impact-fee waivers and property tax abatement, as well as reducing zoning and building code barriers to adaptive reuse projects.

City officials are also working on an adaptive reuse roadmap for architects, builders, and developers to adapt projects to current building codes and planned revamped codes.

Related Stories

Resiliency | Sep 3, 2024

Phius introduces retrofit standard for more resilient buildings

Phius recently released, REVIVE 2024, a retrofit standard for more resilient buildings. The standard focuses on resilience against grid outages by ensuring structures remain habitable for at least a week during extreme weather events.

Products and Materials | Aug 31, 2024

Top building products for August 2024

BD+C Editors break down August's top 15 building products, from waterproof wall panel systems to portable indoor pickleball surface solutions.

Adaptive Reuse | Aug 29, 2024

More than 1.2 billion sf of office space have strong potential for residential conversion

More than 1.2 billion sf of U.S. office space—14.8% of the nation’s total—have strong potential for conversion to residential use, according to real estate software and services firm Yardi. Yardi’s new Conversion Feasibility Index scores office buildings on their suitability for multifamily conversion.

Adaptive Reuse | Aug 28, 2024

Cities in Washington State will offer tax breaks for office-to-residential conversions

A law passed earlier this year by the Washington State Legislature allows developers to defer sales and use taxes if they convert existing structures, including office buildings, into affordable housing.

Affordable Housing | Aug 27, 2024

Not gaining community support is key barrier to more affordable housing projects

In a recent survey, builders and planners cited difficulty in generating community support as a key challenge to getting more affordable housing projects built. The survey by coUrbanize found that 94% of respondents tried to gain community input and support through public meetings, but many were frustrated by low attendance. Few respondents thought the process was productive.

Adaptive Reuse | Aug 22, 2024

6 key fire and life safety considerations for office-to-residential conversions

Office-to-residential conversions may be fraught with fire and life safety challenges, from egress requirements to fire protection system gaps. Here are six important considerations to consider.

Multifamily Housing | Aug 21, 2024

Nation's leading multifamily developer expands into infrastructure

Greystar's strategy for infrastructure is driven by the shifting landscape of today's cities—primarily in the increased digitization, urbanization, and transitions to clean energy.

MFPRO+ New Projects | Aug 20, 2024

Seattle workforce housing project inspired by geology of eastern Washington

J.G. Whittier Apartments, a workforce housing project in Seattle uses the geology of eastern Washington as inspiration for the design. The architecture and interior design celebrate geometric anomalies found in nature. At the corners of the building, blackened wood siding “erodes” to expose vibrant murals underneath.

MFPRO+ New Projects | Aug 16, 2024

At 60 stories, the Paramount multifamily development will stand as Nashville’s tallest high rise

When complete, the 60-story Paramount building, at 750 feet high, will be the tallest high rise tower in Nashville, Tenn., surpassing the city’s current record holder, the 617-foot AT&T Building. The $390 million Paramount project recently launched condo sales after securing more than $230 million in construction financing.

Curtain Wall | Aug 15, 2024

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021