At 28-stories, MIRO, a mixed-use residential project, is set to be the new tallest building in San Jose.
The design features two towers with the same window wall and curtain wall systems and alternating balconies. The rooftop of the West Tower will feature amenities for indoor/outdoor social gatherings and private events with seating. The East Tower will feature outdoor seating and fitness. Each rooftop will be landscaped and offer views of the surrounding area.
The towers, which recently celebrated their topping out, stretch along E. Santa Clara Street between 4th and 5th Streets and sit atop a parking structure with four levels of above grade parking, three levels of below grade parking, and a landscaped roof with pool deck and amenities.
Additionally, the ground level of the parking structure will include approximately 15,000 sf of retail. Grand entry lobbies will face E. Santa Clara Street with a shared apartment entry lobby that leads to a double-height flex/retail space anchored at the southwest corner on level three.
The 630-unit project is slated for completion in spring 2021. Suffolk is building the project with Bayview Development Group as the Developer and Steinberg Hart as the architect.
Related Stories
Mixed-Use | Feb 7, 2017
Traditional Arab architecture and the surrounding mountainous terrain inspire a luxury hotel in Mecca
The Foster + Partners-designed building will address the shortage of accommodation in Mecca.
High-rise Construction | Jan 26, 2017
Paris tower provides office space and three hotel complexes across its three superimposed volumes
Equipped with hanging gardens and a panoramic viewpoint for its top tier, Jardins de l’Arche Tower will rise in Paris’s La défense business district.
Mixed-Use | Jan 26, 2017
New renderings provide glimpse into large mixed-use project, Circa
The $500 million complex will begin pre-leasing in winter, 2017 and open for move-in early in 2018.
Mixed-Use | Jan 18, 2017
Frank Gehry’s Grand Avenue Project in Los Angeles may finally be ready to break ground
The oft-delayed project was set to begin in 2007 but was halted due to the recession.
Mixed-Use | Dec 1, 2016
Amsterdam’s new sustainable mixed-use building embraces the idea of living on the water
The Sluishuis employs a unique shape that makes it appear different from every vantage point.
Mixed-Use | Dec 1, 2016
Initial work on mixed-use development, The Parks at Walter Reed, is underway
The D.C. development is the product of a partnership between Hines, Urban Atlantic, and Triden Development Group.
Multifamily Housing | Dec 1, 2016
One of Canada’s largest media companies dives into real estate development
Rogers moves forward on M City, a multi-building, multi-year project in a Toronto suburb.
Office Buildings | Nov 15, 2016
Under Armour unveils phase one of 50-acre Baltimore headquarters
The campus will be located in Baltimore’s $5.5 billion Port Covington redevelopment project.
Mixed-Use | Nov 10, 2016
Terraced mixed-use development planned for Shanghai’s urban city ring
The development will be highly accessible and provide ‘humanism’ to the area.
Mixed-Use | Nov 8, 2016
Blue Star Accelerator program seeks to help early stage businesses in the technology, sports, and entertainment industries
Applications for the program are currently being accepted.