Resembling a fueling station, VersiCharge XL—a new electric vehicle (EV) charging concept structure—can charge large numbers of EVs in outdoor areas ranging from small office building parking lots to last-mile logistics hubs to stadium parking lots.
The developers—Siemens Smart Infrastructure, which creates intelligent and adaptive infrastructure, and Nexii Building Solutions, a green construction technology company—say the modular, scalable solution is the industry’s first EV-charging system housing all the necessary electrical infrastructure components in an above-ground, enclosed, and low-carbon structure. The above-ground design minimizes disruption to existing parking lots, while also reducing on-site construction waste and environmental impact.
Rapidly developed in just six months last year, the innovative product was installed in only three days’ time in February at Siemens’ research and development hub for electrical products and e-mobility solutions in Peachtree Corners, Ga.
“The massive growth of electric mobility requires an easy and rapid expansion of a reliable and sustainable charging infrastructure. This specific concept shows how Siemens and its partners are working on new, innovative ideas to help support this growth in the US market,” Markus Mildner, CEO of eMobility at Siemens Smart Infrastructure, says in a statement.
The prototype uses Nexii’s building material Nexiite, which has similar properties as concrete but with significantly less embodied carbon, for the vertical structure supporting the Siemens Sentron Busway systems that power the EV chargers. The co-patented design combines Nexii’s sustainable building products and rapid delivery of green buildings with Siemens’ expertise in residential and commercial chargers, charging depots for commercial fleets, and infrastructure systems to power electrified bus lines.
“Construction and transportation are two of the biggest sources of carbon emissions driving climate change today,” Stephen Sidwell, cofounder and CEO of Nexii, says in a statement. “Bringing together Siemens and Nexii demonstrates the power of rapid ideation and development of solutions to some of the world’s biggest problems.”
Related Stories
| May 1, 2013
World’s tallest children’s hospital pushes BIM to the extreme
The Building Team for the 23-story Lurie Children’s Hospital in Chicago implements an integrated BIM/VDC workflow to execute a complex vertical program.
| Apr 22, 2013
Top 10 green building projects for 2013 [slideshow]
The AIA's Committee on the Environment selected its top ten examples of sustainable architecture and green design solutions that protect and enhance the environment.
| Feb 28, 2013
Greeening Silicon Valley: Samsung's new 1.1 million-sf HQ
Samsung Electronics' new 1.1 million sf San Jose campus will support at least 2,500 sales and R&D staff in the company's semiconductor and display businesses.
| Feb 27, 2013
Bronx residents get LEED Platinum public housing complex, rooftop farm
The New York City Housing Authority has opened Arbor House, a 124-unit LEED Platinum complex in the Morrisania neighborhood of the Bronx.
| Feb 22, 2013
Starbucks pilot program rolls out small, modular stores
Coffee giant Starbucks is rolling out mini-stores with maximum local flavor, as part of an international pilot program.
| Oct 23, 2012
Transwestern to develop industrial complex in Houston’s Energy Corridor
Transwestern, a commercial real estate firm, has acquired 30 acres in Houston’s Energy Corridor for a 384,900-sf industrial project, the company announced.
| Jul 25, 2012
Contract awarded for Gaillard Municipal Auditorium renovations in Charleston, S.C.
Seeking LEED Silver certification, the project will begin in August and is slated for completion in December 2014.
| Jul 24, 2012
Dragon Valley Retail at epicenter of Yongsan International Business District
Masterplanned by architect Daniel Libeskind, the Yongsan IBD encompasses ten city blocks and includes a collection of high-rise residences and commercial buildings.
| Jul 24, 2012
$20 Million expansion at New Orleans casino announced
150-room hotel project to include suites, fitness center, and meeting space.