Resembling a fueling station, VersiCharge XL—a new electric vehicle (EV) charging concept structure—can charge large numbers of EVs in outdoor areas ranging from small office building parking lots to last-mile logistics hubs to stadium parking lots.
The developers—Siemens Smart Infrastructure, which creates intelligent and adaptive infrastructure, and Nexii Building Solutions, a green construction technology company—say the modular, scalable solution is the industry’s first EV-charging system housing all the necessary electrical infrastructure components in an above-ground, enclosed, and low-carbon structure. The above-ground design minimizes disruption to existing parking lots, while also reducing on-site construction waste and environmental impact.
Rapidly developed in just six months last year, the innovative product was installed in only three days’ time in February at Siemens’ research and development hub for electrical products and e-mobility solutions in Peachtree Corners, Ga.
“The massive growth of electric mobility requires an easy and rapid expansion of a reliable and sustainable charging infrastructure. This specific concept shows how Siemens and its partners are working on new, innovative ideas to help support this growth in the US market,” Markus Mildner, CEO of eMobility at Siemens Smart Infrastructure, says in a statement.
The prototype uses Nexii’s building material Nexiite, which has similar properties as concrete but with significantly less embodied carbon, for the vertical structure supporting the Siemens Sentron Busway systems that power the EV chargers. The co-patented design combines Nexii’s sustainable building products and rapid delivery of green buildings with Siemens’ expertise in residential and commercial chargers, charging depots for commercial fleets, and infrastructure systems to power electrified bus lines.
“Construction and transportation are two of the biggest sources of carbon emissions driving climate change today,” Stephen Sidwell, cofounder and CEO of Nexii, says in a statement. “Bringing together Siemens and Nexii demonstrates the power of rapid ideation and development of solutions to some of the world’s biggest problems.”
Related Stories
Projects | Mar 24, 2022
A Hollywood home for creatives
A Hollywood development will serve as a collaborative center for artists, students, and those in the entertainment industry.
Projects | Mar 22, 2022
Fast-growing Austin adds a $3 billion community
The nation’s fastest-growing large metro area is getting even bigger, with the addition of a $3 billion, 66-acre community.
Projects | Mar 22, 2022
AREA15 to open second location in Orlando, Florida
AREA15, an immersive and experiential art, entertainment, dining and retail center, recently announced that it will open its second location in Orlando, Florida, in 2024.
Projects | Mar 22, 2022
Austin multifamily project to feature 60 micro-housing apartments
A new 34,364 sf multifamily project, Sixth and Chicon, in Austin, Texas, will feature 60 micro-housing apartments designed for “the urban minimalist.”
Projects | Mar 21, 2022
BIG-designed Danish Neuroscience Center will combine groundbreaking science and treatment
A first-of-its-kind facility, a new Danish Neuroscience Center in Aarhus, Denmark designed by BIG, will combine psychiatry and neuroscience under one roof.
Projects | Mar 18, 2022
Former department store transformed into 1 million sf mixed-use complex
Sibley Square, a giant mixed-use complex project that transformed a nearly derelict former department store was recently completed in Rochester, N.Y.
Projects | Mar 18, 2022
Toronto suburb to build the largest hospital in Canada
A new hospital in Ontario will nearly triple the care capacity of its existing facility—becoming the largest hospital in Canada.
Projects | Mar 17, 2022
Plans unveiled for ‘Wall Street South’ mixed-use office block in West Palm Beach
Brand Atlantic Real Estate Partners, Wheelock Street Capital, and B+H Architects released design plans for a new mixed-use office block in West Palm Beach called Banyan & Olive.
Museums | Mar 16, 2022
Unpacking the secrets to good museum storage
Museum leaders should focus as much design attention on the archives as the galleries themselves, according to a new white paper by Erin Flynn and Bruce Davis, architects and museum experts with the firm Cooper Robertson.
Projects | Mar 16, 2022
Tomorrow’s STEM leaders get a state-of-the-art research complex
In February, North Carolina Agriculture and Technical State University (NC A&T) opened its new Engineering Research & Innovation Complex (ERIC).