flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Shanghai’s T20 stacks office and community space atop a plant-filled parking garage

Mixed-Use

Shanghai’s T20 stacks office and community space atop a plant-filled parking garage

Jacques Ferrier Architecture and Sensual City Studio designed the building.


By David Malone, Associate Editor | July 23, 2019

Photo: Jacques Ferrier Architecture / Jonathan Leijonhufvud

Built on the site of a former hotel, Shanghai’s T20 combines office, civic, commercial, and cultural space with elevated green ribbons of public walkways at China’s busiest intersection.

The 215,000-sf building divides its uses by floor. Two underground levels are set aside for commercial space, with one of the levels connecting to the Metro City building by an underground gallery. Floors 1 and 2 house a few hundred square meters of community space. Floors 3 through 7 house the public parking garage. The garage unfolds in the form of a continuous spiral to serve the surrounding offices and businesses. 

 

Photo: Jacques Ferrier Architecture / Photo Luc Boegly.

 

Floors 8 and 9 are shared office space arranged around a large raised garden. These floors also include a reception area, cafeteria, meeting rooms, auditorium, and spaces for relaxation. Floors 10 through 15 were designed as user-friendly office spaces. The top two floors will comprise the cultural center, which has been designed to “float” on the skyline of the district.

 

See Also: Berlin’s Museum Island receives its first new building in almost 100 years

 

The design introduces suspended gardens and plantings throughout to help counteract some of the pollution of the neighboring intersection.

 

Photo: Jacques Ferrier Architecture / Photo Luc Boegly.

Tags

Related Stories

Mixed-Use | Oct 7, 2024

New mixed-use tower by Studio Gang completes first phase of San Francisco waterfront redevelopment

Construction was recently completed on Verde, a new mixed-use tower along the San Francisco waterfront, marking the end of the first phase of the Mission Rock development. Verde is the fourth and final building of phase one of the 28-acre project that will be constructed in several phases guided by design principles developed by a design cohort led by Studio Gang.

Affordable Housing | Oct 4, 2024

3 new affordable housing projects for October 2024

As affordable housing continues to grow, more projects are looking to diversify their footprint by adding mixed-use components, community areas, and more.

Mixed-Use | Sep 19, 2024

A Toronto development will transform a 32-acre shopping center site into a mixed-use urban neighborhood

Toronto developers Mattamy Homes and QuadReal Property Group have launched The Clove, the first phase in the Cloverdale, a $6 billion multi-tower development. The project will transform Cloverdale Mall, a 32-acre shopping center in Toronto, into a mixed-use urban neighborhood.

Mixed-Use | Sep 10, 2024

Centennial Yards, a $5 billion mixed-use development in downtown Atlanta, tops out its first residential tower

Centennial Yards Company has topped out The Mitchell, the first residential tower of Centennial Yards, a $5 billion mixed-use development in downtown Atlanta. Construction of the apartment building is expected to be complete by the middle of next year, with first move-ins slated for summer 2025.

Codes and Standards | Sep 3, 2024

Atlanta aims to crack down on blighted properties with new tax

A new Atlanta law is intended to crack down on absentee landlords including commercial property owners and clean up neglected properties. The “Blight Tax” allows city officials to put levies on blighted property owners up to 25 times higher than current millage rates.

Building Technology | Aug 23, 2024

Top-down construction: Streamlining the building process | BD+C

Learn why top-down construction is becoming popular again for urban projects and how it can benefit your construction process in this comprehensive blog.

Mixed-Use | Aug 21, 2024

Adaptive reuse of a Sears store becomes luxury mixed-use housing

6 Corners Lofts at 4714 W Irving Park Road, Chicago, Ill., opened in March of 2024 as a 394,000-sf adaptive reuse project born out of a former Sears store.

Curtain Wall | Aug 15, 2024

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 

Adaptive Reuse | Aug 14, 2024

Adaptive reuse revives a former warehouse in St. Louis

The Victor, as the building is now called, has nearly 400 residential apartments.

Adaptive Reuse | Aug 14, 2024

KPF unveils design for repositioning of Norman Foster’s 8 Canada Square tower in London

8 Canada Square, a Norman Foster-designed office building that’s currently the global headquarters of HSBC Holdings, will have large sections of its façade removed to create landscaped terraces. The project, designed by KPF, will be the world’s largest transformation of an office tower into a sustainable mixed-use building.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021