The more indecisive among us will be able to relate to the back and forth dance Silverstein Properties is currently doing as it tries to make a decision about what to build on a large property in Manhattan’s Far West Side.
Before purchasing a Mercedes-Benz dealership on the site for $115 million and demolishing it back in 2015, Silverstein announced its plans to build two 60-story-plus towers with a total of around 1,000 apartment units. But after the purchase was made official, Silverstein instead decided to build a 1,100-foot tower with 1,400 apartments and a large retail component, Curbed New York reports.
But the best laid schemes of mice and men often go awry, and Silverstein has once again scrapped its plans and appears to be pursuing a different approach. The new plan, which, according to Crain’s, has not been set in stone, eliminates the supertall tower and goes back to a two-tower approach; one residential and one commercial.
This time, however, the project would be constructed in two phases. The first phase of the new plan would see a CetraRuddy-designed 600,000-sf condo tower rise on the site. Building the residential tower first would prove to be more lucrative and could help fund the construction of the second tower in phase two. The second tower would be the larger tower of the two, comprising 1.2 million sf of office space.
Plans have not been filed for the new two-tower project yet, however, and Silverstein is still exploring other options for the site. So don’t be too surprised if another change of plans occurs.
Related Stories
High-rise Construction | Dec 20, 2017
Another record year for high-rise construction
More than 140 skyscrapers were completed across the globe this year, including 15 supertall towers.
High-rise Construction | Oct 4, 2017
90-story mixed-use building could become Denver’s first supertall tower
Manhattan-based Greenwich Realty Capital is developing the project.
High-rise Construction | Sep 8, 2017
CTBUH determines fastest elevators and longest runs in the world in new TBIN Study
When it comes to the tallest skyscrapers in the world, the vertical commute in the building becomes just as important as the horizontal commute through the city.
Codes and Standards | Sep 5, 2017
New CTBUH initiatives to investigate link between fire and façades
In wake of Grenfell tragedy, Council forms new workgroup.
Mixed-Use | Aug 30, 2017
A 50-acre waterfront redevelopment gets under way in Tampa
Nine architects, three interior designers, and nine contractors are involved in this $3 billion project.
Codes and Standards | Aug 7, 2017
Council on Tall Buildings and Urban Habitat to create standards to measure floor area
The standards will examine existing codes and regulations to find where they are too broad or contentious.
High-rise Construction | Aug 1, 2017
Construction on the world’s skinniest tower halts due to ballooning costs
The planned 82-story tower has stalled after completing just 20 stories.
Wood | Jun 13, 2017
The first timber high-rise in the U.S. set for construction in Portland
The building’s design, building materials, and commercial tenants are all focused on the key aspect of sustainability.
Office Buildings | May 30, 2017
How tech companies are rethinking the high-rise workplace
Eight fresh ideas for the high-rise of the future, from NBBJ Design Partner Jonathan Ward.
Mixed-Use | May 23, 2017
45-story tower planned for Miami Worldcenter
Pickard Chilton Architects will design the 600,000-sf 110 10th Street.