flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Silverstein Properties waffles on what to do with Far West Side property

High-rise Construction

Silverstein Properties waffles on what to do with Far West Side property

The company has gone from a two-tower design, to a supertall, and now, supposedly, back to a two-tower design.


By David Malone, Associate Editor | January 27, 2017

Silverstein Properties original two-tower design. Rendering courtesy of Oppenheim Architecture + Design.

The more indecisive among us will be able to relate to the back and forth dance Silverstein Properties is currently doing as it tries to make a decision about what to build on a large property in Manhattan’s Far West Side.

Before purchasing a Mercedes-Benz dealership on the site for $115 million and demolishing it back in 2015, Silverstein announced its plans to build two 60-story-plus towers with a total of around 1,000 apartment units. But after the purchase was made official, Silverstein instead decided to build a 1,100-foot tower with 1,400 apartments and a large retail component, Curbed New York reports.

But the best laid schemes of mice and men often go awry, and Silverstein has once again scrapped its plans and appears to be pursuing a different approach. The new plan, which, according to Crain’s, has not been set in stone, eliminates the supertall tower and goes back to a two-tower approach; one residential and one commercial.

This time, however, the project would be constructed in two phases. The first phase of the new plan would see a CetraRuddy-designed 600,000-sf condo tower rise on the site. Building the residential tower first would prove to be more lucrative and could help fund the construction of the second tower in phase two. The second tower would be the larger tower of the two, comprising 1.2 million sf of office space.

Plans have not been filed for the new two-tower project yet, however, and Silverstein is still exploring other options for the site. So don’t be too surprised if another change of plans occurs.

Related Stories

High-rise Construction | Jun 1, 2018

CTBUH names 2018 Best Tall Building Worldwide, among nine other award winners

Oasia Downtown Hotel named “Best Tall Building Worldwide” for 2018.

| May 24, 2018

Accelerate Live! talk: Security and the built environment: Insights from an embassy designer

In this 15-minute talk at BD+C’s Accelerate Live! conference (May 10, 2018, Chicago), embassy designer Tom Jacobs explores ways that provide the needed protection while keeping intact the representational and inspirational qualities of a design.

High-rise Construction | May 18, 2018

The 100 tallest buildings ever conventionally demolished

The list comes from a recent CTBUH study.

High-rise Construction | May 14, 2018

Register before it’s too late: 2018 Tall + Urban Innovation Conference

The conference explores and celebrates the very best in innovative tall buildings, urban spaces, building technologies, and construction practices from around the world. 

Multifamily Housing | Apr 24, 2018

Adrian Smith + Gordon Gill Architecture designs 47-story condo tower in Miami

The tower will be located in Miami’s South Brickell neighborhood.

High-rise Construction | Apr 17, 2018

Developers reveal plans for 1,422-foot-tall skyscraper in Chicago

The tower would be the second tallest in the city.

Wood | Feb 15, 2018

Japanese company announces plans for the world’s tallest wooden skyscraper

The planned tower would rise 350 meters (1148 feet).

boombox1
boombox2
native1

More In Category




Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021