flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Silverstein Properties waffles on what to do with Far West Side property

High-rise Construction

Silverstein Properties waffles on what to do with Far West Side property

The company has gone from a two-tower design, to a supertall, and now, supposedly, back to a two-tower design.


By David Malone, Associate Editor | January 27, 2017

Silverstein Properties original two-tower design. Rendering courtesy of Oppenheim Architecture + Design.

The more indecisive among us will be able to relate to the back and forth dance Silverstein Properties is currently doing as it tries to make a decision about what to build on a large property in Manhattan’s Far West Side.

Before purchasing a Mercedes-Benz dealership on the site for $115 million and demolishing it back in 2015, Silverstein announced its plans to build two 60-story-plus towers with a total of around 1,000 apartment units. But after the purchase was made official, Silverstein instead decided to build a 1,100-foot tower with 1,400 apartments and a large retail component, Curbed New York reports.

But the best laid schemes of mice and men often go awry, and Silverstein has once again scrapped its plans and appears to be pursuing a different approach. The new plan, which, according to Crain’s, has not been set in stone, eliminates the supertall tower and goes back to a two-tower approach; one residential and one commercial.

This time, however, the project would be constructed in two phases. The first phase of the new plan would see a CetraRuddy-designed 600,000-sf condo tower rise on the site. Building the residential tower first would prove to be more lucrative and could help fund the construction of the second tower in phase two. The second tower would be the larger tower of the two, comprising 1.2 million sf of office space.

Plans have not been filed for the new two-tower project yet, however, and Silverstein is still exploring other options for the site. So don’t be too surprised if another change of plans occurs.

Related Stories

Multifamily Housing | Jun 28, 2023

Sutton Tower, an 80-story multifamily development, completes construction in Manhattan’s Midtown East

In Manhattan’s Midtown East, the construction of Sutton Tower, an 80-story residential building, has been completed. Located in the Sutton Place neighborhood, the tower offers 120 for-sale residences, with the first move-ins scheduled for this summer. The project was designed by Thomas Juul-Hansen and developed by Gamma Real Estate and JVP Management. Lendlease, the general contractor, started construction in 2018.

Apartments | Jun 27, 2023

Dallas high-rise multifamily tower is first in state to receive WELL Gold certification

HALL Arts Residences, 28-story luxury residential high-rise in the Dallas Arts District, recently became the first high-rise multifamily tower in Texas to receive WELL Gold Certification, a designation issued by the International WELL Building Institute. The HKS-designed condominium tower was designed with numerous wellness details.

Engineers | Jun 14, 2023

The high cost of low maintenance

Walter P Moore’s Javier Balma, PhD, PE, SE, and Webb Wright, PE, identify the primary causes of engineering failures, define proactive versus reactive maintenance, recognize the reasons for deferred maintenance, and identify the financial and safety risks related to deferred maintenance.

Healthcare Facilities | Jun 1, 2023

High-rise cancer center delivers new model for oncology care

Atlanta’s 17-story Winship Cancer Institute at Emory Midtown features two-story communities that organize cancer care into one-stop destinations. Designed by Skidmore, Owings & Merrill (SOM) and May Architecture, the facility includes comprehensive oncology facilities—including inpatient beds, surgical capacity, infusion treatment, outpatient clinics, diagnostic imaging, linear accelerators, and areas for wellness, rehabilitation, and clinical research.

Design Innovation Report | Apr 19, 2023

Reinforced concrete walls and fins stiffen and shade the National Bank of Kuwait skyscraper

When the National Bank of Kuwait first conceived its new headquarters more than a decade ago, it wanted to make a statement about passive design with a soaring tower that could withstand the extreme heat of Kuwait City, the country’s desert capital. 

Affordable Housing | Mar 14, 2023

3 affordable housing projects that overcame building obstacles

These three developments faced certain obstacles during their building processes—from surrounding noise suppression to construction methodology.

High-rise Construction | Feb 15, 2023

Bjarke Ingels' 'leaning towers' concept wins Qianhai Prisma Towers design competition

A pair of sloped high-rises—a 300-meter residential tower and a 250-meter office tower—highlight the Qianhai Prisma Towers development in Qianhai, Shenzhen, China. BIG recently won the design competition for the project.

Affordable Housing | Feb 15, 2023

2023 affordable housing roundup: 20+ multifamily projects

In our latest call for entries, Building Design+Construction collected over 20 multifamily projects with a focus on affordable housing. Here is a comprehensive list of all projects in alphabetical order.

Multifamily Housing | Feb 11, 2023

8 Gold and Platinum multifamily projects from the NAHB's BALA Awards

This year's top BALA multifamily winners showcase leading design trends, judged by eight industry professionals from across the country.

Multifamily Housing | Jan 19, 2023

Chicago multifamily high-rise inspired by industrial infrastructure and L tracks

The recently unveiled design of The Row Fulton Market, a new Chicago high-rise residential building, draws inspiration from industrial infrastructure and L tracks in the historic Fulton Market District neighborhood. The 43-story, 300-unit rental property is in the city’s former meatpacking district, and its glass-and-steel façade reflects the arched support beams of the L tracks.

boombox1
boombox2
native1

More In Category




Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021