flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Skanska selects Pickard Chilton to design innovative office tower in Bellevue, Wash.

Mixed-Use

Skanska selects Pickard Chilton to design innovative office tower in Bellevue, Wash.

The 800,000-gsf mixed-use project is located at 10660 NE 8th Street.


By David Malone, Associate Editor | July 22, 2020
The Eight ground level

All renderings courtesy Pickard Chilton

Skanska has recently selected Pickard Chilton to design The Eight, a 25-story tower set to be built in Bellevue, Wash.

The project will feature 540,000-sf of commercial office space with open floor plates and 10-foot ceiling heights, a 7,000-sf public plaza, 12,000-sf of ground floor retail, and a 1,200-sf retail pavilion built with heavy timber. Seven of the floors will feature balconies and a private, 3,000-sf rooftop deck with a retractable roof will also be included. A unique, activated space dubbed the “Living Room” will act as a “third place” public amenity for gathering, working, and socialization directly connected to local retail.

 

The Eight exterior

 

Amenities such as a fitness center, event space, and a landscaped terrace are included on the double-height second floor. An underground parking garage will include parking for 200 cars along with parking for over 200 bicycles. The Eight’s location at 10660 NE 8th Street offers immediate pedestrian access to the new light rail station and Bellevue transit center as well as direct freeway access. The tower’s massing is articulated with exposed structure and balconies that are interwoven with greenery to know the building together.  

A healthy HVAC system and touchless controls are included while the spacious lobby and multiple terraces and outdoor spaces will help to keep the building’s tenants and visitors socially distanced. The Eight is targeting LEED Gold and Fitwel certifications.

 

The Eight upper floors and terrace

Tags

Related Stories

Mixed-Use | Oct 7, 2024

New mixed-use tower by Studio Gang completes first phase of San Francisco waterfront redevelopment

Construction was recently completed on Verde, a new mixed-use tower along the San Francisco waterfront, marking the end of the first phase of the Mission Rock development. Verde is the fourth and final building of phase one of the 28-acre project that will be constructed in several phases guided by design principles developed by a design cohort led by Studio Gang.

Affordable Housing | Oct 4, 2024

3 new affordable housing projects for October 2024

As affordable housing continues to grow, more projects are looking to diversify their footprint by adding mixed-use components, community areas, and more.

Mixed-Use | Sep 19, 2024

A Toronto development will transform a 32-acre shopping center site into a mixed-use urban neighborhood

Toronto developers Mattamy Homes and QuadReal Property Group have launched The Clove, the first phase in the Cloverdale, a $6 billion multi-tower development. The project will transform Cloverdale Mall, a 32-acre shopping center in Toronto, into a mixed-use urban neighborhood.

Mixed-Use | Sep 10, 2024

Centennial Yards, a $5 billion mixed-use development in downtown Atlanta, tops out its first residential tower

Centennial Yards Company has topped out The Mitchell, the first residential tower of Centennial Yards, a $5 billion mixed-use development in downtown Atlanta. Construction of the apartment building is expected to be complete by the middle of next year, with first move-ins slated for summer 2025.

Codes and Standards | Sep 3, 2024

Atlanta aims to crack down on blighted properties with new tax

A new Atlanta law is intended to crack down on absentee landlords including commercial property owners and clean up neglected properties. The “Blight Tax” allows city officials to put levies on blighted property owners up to 25 times higher than current millage rates.

Building Technology | Aug 23, 2024

Top-down construction: Streamlining the building process | BD+C

Learn why top-down construction is becoming popular again for urban projects and how it can benefit your construction process in this comprehensive blog.

Mixed-Use | Aug 21, 2024

Adaptive reuse of a Sears store becomes luxury mixed-use housing

6 Corners Lofts at 4714 W Irving Park Road, Chicago, Ill., opened in March of 2024 as a 394,000-sf adaptive reuse project born out of a former Sears store.

Curtain Wall | Aug 15, 2024

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 

Adaptive Reuse | Aug 14, 2024

Adaptive reuse revives a former warehouse in St. Louis

The Victor, as the building is now called, has nearly 400 residential apartments.

Adaptive Reuse | Aug 14, 2024

KPF unveils design for repositioning of Norman Foster’s 8 Canada Square tower in London

8 Canada Square, a Norman Foster-designed office building that’s currently the global headquarters of HSBC Holdings, will have large sections of its façade removed to create landscaped terraces. The project, designed by KPF, will be the world’s largest transformation of an office tower into a sustainable mixed-use building.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021