Skanska has recently selected Pickard Chilton to design The Eight, a 25-story tower set to be built in Bellevue, Wash.
The project will feature 540,000-sf of commercial office space with open floor plates and 10-foot ceiling heights, a 7,000-sf public plaza, 12,000-sf of ground floor retail, and a 1,200-sf retail pavilion built with heavy timber. Seven of the floors will feature balconies and a private, 3,000-sf rooftop deck with a retractable roof will also be included. A unique, activated space dubbed the “Living Room” will act as a “third place” public amenity for gathering, working, and socialization directly connected to local retail.
Amenities such as a fitness center, event space, and a landscaped terrace are included on the double-height second floor. An underground parking garage will include parking for 200 cars along with parking for over 200 bicycles. The Eight’s location at 10660 NE 8th Street offers immediate pedestrian access to the new light rail station and Bellevue transit center as well as direct freeway access. The tower’s massing is articulated with exposed structure and balconies that are interwoven with greenery to know the building together.
A healthy HVAC system and touchless controls are included while the spacious lobby and multiple terraces and outdoor spaces will help to keep the building’s tenants and visitors socially distanced. The Eight is targeting LEED Gold and Fitwel certifications.
Related Stories
Wood | Apr 13, 2022
Mass timber: Multifamily’s next big building system
Mass timber construction experts offer advice on how to use prefabricated wood systems to help you reach for the heights with your next apartment or condominium project.
Office Buildings | Apr 11, 2022
SOM-designed office tower aims to promote health and wellness
Skidmore, Owings & Merrill (SOM) recently completed work on 800 Fulton Market, a new mixed-use office building in Chicago’s historic Fulton Market/West Loop neighborhood.
Multifamily Housing | Mar 29, 2022
Here’s why the U.S. needs more ‘TOD’ housing
Transit-oriented developments help address the housing affordability issue that many cities and suburbs are facing.
Multifamily Housing | Feb 24, 2022
First new, mixed-use high-rise in Detroit’s central business district in nearly 30 years opens
City Club Apartments completed two multifamily projects in 2021 in downtown Detroit including the first new, mixed-use high-rise in Detroit’s central business district in nearly 30 years.
Office Buildings | Feb 23, 2022
The Beam on Farmer, Arizona’s first mass timber, multi-story office building tops out
The Beam on Farmer, Arizona’s first mass timber, multi-story office building, topped out on Feb. 10, 2022.
Mixed-Use | Feb 9, 2022
David Chipperfield Architects to design Schützenstraße mixed-use development in Munich
The firm recently won a competition for the project.
Mixed-Use | Jan 13, 2022
Details unveiled for Atlanta’s Campus 244 mixed-use development
S9 Architecture is designing the project.
Mixed-Use | Jan 10, 2022
Mixed-use Arsenal Yards completes in Watertown’s East End
PCA master-planned the seven-building, one million sf destination and designed the urban village, residences, and open spaces.
Mixed-Use | Jan 5, 2022
Waterfront Station II breaks ground in Washington, D.C.
The mixed-use project will include 30% affordable housing.
Mixed-Use | Dec 21, 2021
Riverside Wharf will be Miami’s newest entertainment complex
Cube3 Architects is designing the project.