flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Skanska selects Pickard Chilton to design innovative office tower in Bellevue, Wash.

Mixed-Use

Skanska selects Pickard Chilton to design innovative office tower in Bellevue, Wash.

The 800,000-gsf mixed-use project is located at 10660 NE 8th Street.


By David Malone, Associate Editor | July 22, 2020
The Eight ground level

All renderings courtesy Pickard Chilton

Skanska has recently selected Pickard Chilton to design The Eight, a 25-story tower set to be built in Bellevue, Wash.

The project will feature 540,000-sf of commercial office space with open floor plates and 10-foot ceiling heights, a 7,000-sf public plaza, 12,000-sf of ground floor retail, and a 1,200-sf retail pavilion built with heavy timber. Seven of the floors will feature balconies and a private, 3,000-sf rooftop deck with a retractable roof will also be included. A unique, activated space dubbed the “Living Room” will act as a “third place” public amenity for gathering, working, and socialization directly connected to local retail.

 

The Eight exterior

 

Amenities such as a fitness center, event space, and a landscaped terrace are included on the double-height second floor. An underground parking garage will include parking for 200 cars along with parking for over 200 bicycles. The Eight’s location at 10660 NE 8th Street offers immediate pedestrian access to the new light rail station and Bellevue transit center as well as direct freeway access. The tower’s massing is articulated with exposed structure and balconies that are interwoven with greenery to know the building together.  

A healthy HVAC system and touchless controls are included while the spacious lobby and multiple terraces and outdoor spaces will help to keep the building’s tenants and visitors socially distanced. The Eight is targeting LEED Gold and Fitwel certifications.

 

The Eight upper floors and terrace

Tags

Related Stories

| Jun 1, 2012

New BD+C University Course on Insulated Metal Panels available

By completing this course, you earn 1.0 HSW/SD AIA Learning Units.

| May 29, 2012

Reconstruction Awards Entry Information

Download a PDF of the Entry Information at the bottom of this page.

| May 24, 2012

2012 Reconstruction Awards Entry Form

Download a PDF of the Entry Form at the bottom of this page.

| May 23, 2012

Summit Design+Build selected as GC for Chicago restaurant

Little Goat will truly be a multifunctional space.  Construction plans include stripping the 10,000 sq. ft. building down to the bare structure everywhere, the installation of a new custom elevator and adding square footage at the second floor with an addition.

| Apr 30, 2012

HSA Commercial selected as consultant for Orland Park’s Main Street Triangle project

HSA will be responsible for designing an overall mixed-use merchandise plan, attracting a unique retail tenant mix and completing leases with prospective tenants.

| Apr 20, 2012

Shawmut completes Yard House Restaurant in Boston

12,000-sf restaurant marks new addition to Boston’s Fenway neighborhood.

| Apr 6, 2012

Batson-Cook breaks ground on hotel adjacent to Infantry Museum & Fort Benning

The four-story, 65,000-ft property will feature 102 hotel rooms, including 14 studio suites.

| Apr 4, 2012

JCJ Architecture designs New York City's first casino

Aqueduct Racetrack complex transformed into modern entertainment destination.

| Apr 3, 2012

Luxury hotel 'groundscraper' planned in abandoned quarry

Would you spend $300 a night to sleep underground? You might, once you see the designs for China's latest hotel project.

| Mar 16, 2012

Temporary fix to CityCenter's Harmon would cost $2 million, contractor says

By contrast, CityCenter half-owner and developer MGM Resorts International determined last year that the Harmon would collapse in a strong quake and can't be fixed in an economical way. It favors implosion at a cost of $30 million.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021