flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Skybridge connects a terminal and airport on each side of the U.S.-Mexico border

Airports

Skybridge connects a terminal and airport on each side of the U.S.-Mexico border

Cross Border Xpress is the first phase of a larger development that will include hotels and offices.  


By John Caulfield, Senior Editor | December 13, 2015
Skybridge connects a terminal and airport on each side of the U.S.-Mexico border

Images courtesy Latitude 33.

The airport in Tijuana, Mexico, is literally within walking distance of the U.S.-Mexico border. And cross-country travel is now a bit easier with the Dec. 9 opening of Cross Border Xpress, a 390-foot-long, 33-foot wide skywalk bridge for use by ticketed airline passengers to cross between San Diego and Tijuana Airport.

This is the first project to join a foreign airport terminal with the U.S., according to the Los Angeles Times, which reports that the $120 million private venture expects to serve 2.4 million fliers annually.

The CBX terminal, located on 55 acres between the border crossings at San Ysidro and Otay Mesa on the California side, is open 24 hours a day, and six airlines—Aeromexico, Aeromexico Connect, Interject, VivaAerobus (a no-frills carrier that doesn’t operate in southern California), Volaris, and Aero Califia—provide customer service. 

“A project of this magnitude was no small feat and took cooperation from a large number of stakeholders in the United States and Mexico to make it a reality,” says Jim Kilgore, Senior Associate with Latitude 33, the San Diego-based planning and engineering firm that, in association with Otay-Tijuana Venture LLC, provided land entitlements, construction documents, and construction staking services for this project. “Travel, tourism, business and access to both San Diego and Tijuana will be much improved as a result of this facility.” 

Otay-Tijuana Venture is a private investment group with U.S. and Mexican shareholders that include PAP Corp., PALAREO Inc., and EGI-Otay Investors. Invex and Banomext were the lenders for this project.

The CBX facility is a collaboration between the Mexico-based architectural firm Legorreta y Legorreta and Stantec. In Mexico, the contractors included Grumesa, Espazio, Corey and Fercon Qualitas. U.S. contractors included The Harrison Company, Hazard Construction, and Turner Construction.   

Here’s how CBX works. Passengers flying into Tijuana International Airport pick up their bags and then purchase or print a CBX ticket at the baggage claim area. (Crossings are free through Dec. 18, and then $18 one way for adults, with discounts for seniors and children.) They can skywalk across the border to the terminal in San Diego County, where they can catch a cab, bus, shuttle or Uber to downtown San Diego, 22 miles away, or other destination points. U.S. Customs mans a checkpoint at the bridge for those people entering the country.

Conversely, passengers coming from San Diego can purchase and print CBX and airline tickets at the full-service terminal, and use the skywalk to access the airport in Mexico, which offers flights to 50 cities.

CBX’s backers estimate that U.S. passengers currently account for nearly 60% of that airport’s customers.

“This will be a great new option for travel between the U.S. and Mexico,” Jerry Sanders, president and CEO of the San Diego Regional Chamber of Commerce, told Fox 5 in San Diego.

The 90,000-sf terminal is the first phase of a 60-acre site that will incorporate two hotel sites, as well as commercial, office, industrial, and shipping facilities over this project’s 10-year buildout. 

 

Tags

Related Stories

Resiliency | Aug 19, 2021

White paper outlines cost-effective flood protection approaches for building owners

A new white paper from Walter P Moore offers an in-depth review of the flood protection process and proven approaches.

Airports | Jul 26, 2021

NORR designs the UK’s first satellite launch Space Hub

The project will be located in Sutherland, Scotland.

Wood | Jul 16, 2021

The future of mass timber construction, with Swinerton's Timberlab

In this exclusive for HorizonTV, BD+C's John Caulfield sat down with three Timberlab leaders to discuss the launch of the firm and what factors will lead to greater mass timber demand.

Resiliency | Jun 24, 2021

Oceanographer John Englander talks resiliency and buildings [new on HorizonTV]

New on HorizonTV, oceanographer John Englander discusses his latest book, which warns that, regardless of resilience efforts, sea levels will rise by meters in the coming decades. Adaptation, he says, is the key to future building design and construction.

Airports | Jun 9, 2021

ZGF unveils latest renderings of Portland International Airport’s main terminal

An undulating wooden roof highlights the project.

Airports | May 27, 2021

Grimshaw wins competition to design Shenzhen Airport East Integrated Transport Hub

The competition sought to find a design that created an integrated intermodal transport hub that could act as a new urban gateway.

Digital Twin | May 24, 2021

Digital twin’s value propositions for the built environment, explained

Ernst & Young’s white paper makes its cases for the technology’s myriad benefits.

Multifamily Housing | Mar 28, 2021

Smart home technology 101 for multifamily housing communities

Bulk-services Wi-Fi leads to better connectivity, products, and services to help multifamily developers create greater value for residents–and their own bottom line.

boombox1
boombox2
native1

More In Category




Great Solutions

41 Great Solutions for architects, engineers, and contractors

AI ChatBots, ambient computing, floating MRIs, low-carbon cement, sunshine on demand, next-generation top-down construction. These and 35 other innovations make up our 2024 Great Solutions Report, which highlights fresh ideas and innovations from leading architecture, engineering, and construction firms.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021