flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Skybridge connects a terminal and airport on each side of the U.S.-Mexico border

Airports

Skybridge connects a terminal and airport on each side of the U.S.-Mexico border

Cross Border Xpress is the first phase of a larger development that will include hotels and offices.  


By John Caulfield, Senior Editor | December 13, 2015
Skybridge connects a terminal and airport on each side of the U.S.-Mexico border

Images courtesy Latitude 33.

The airport in Tijuana, Mexico, is literally within walking distance of the U.S.-Mexico border. And cross-country travel is now a bit easier with the Dec. 9 opening of Cross Border Xpress, a 390-foot-long, 33-foot wide skywalk bridge for use by ticketed airline passengers to cross between San Diego and Tijuana Airport.

This is the first project to join a foreign airport terminal with the U.S., according to the Los Angeles Times, which reports that the $120 million private venture expects to serve 2.4 million fliers annually.

The CBX terminal, located on 55 acres between the border crossings at San Ysidro and Otay Mesa on the California side, is open 24 hours a day, and six airlines—Aeromexico, Aeromexico Connect, Interject, VivaAerobus (a no-frills carrier that doesn’t operate in southern California), Volaris, and Aero Califia—provide customer service. 

“A project of this magnitude was no small feat and took cooperation from a large number of stakeholders in the United States and Mexico to make it a reality,” says Jim Kilgore, Senior Associate with Latitude 33, the San Diego-based planning and engineering firm that, in association with Otay-Tijuana Venture LLC, provided land entitlements, construction documents, and construction staking services for this project. “Travel, tourism, business and access to both San Diego and Tijuana will be much improved as a result of this facility.” 

Otay-Tijuana Venture is a private investment group with U.S. and Mexican shareholders that include PAP Corp., PALAREO Inc., and EGI-Otay Investors. Invex and Banomext were the lenders for this project.

The CBX facility is a collaboration between the Mexico-based architectural firm Legorreta y Legorreta and Stantec. In Mexico, the contractors included Grumesa, Espazio, Corey and Fercon Qualitas. U.S. contractors included The Harrison Company, Hazard Construction, and Turner Construction.   

Here’s how CBX works. Passengers flying into Tijuana International Airport pick up their bags and then purchase or print a CBX ticket at the baggage claim area. (Crossings are free through Dec. 18, and then $18 one way for adults, with discounts for seniors and children.) They can skywalk across the border to the terminal in San Diego County, where they can catch a cab, bus, shuttle or Uber to downtown San Diego, 22 miles away, or other destination points. U.S. Customs mans a checkpoint at the bridge for those people entering the country.

Conversely, passengers coming from San Diego can purchase and print CBX and airline tickets at the full-service terminal, and use the skywalk to access the airport in Mexico, which offers flights to 50 cities.

CBX’s backers estimate that U.S. passengers currently account for nearly 60% of that airport’s customers.

“This will be a great new option for travel between the U.S. and Mexico,” Jerry Sanders, president and CEO of the San Diego Regional Chamber of Commerce, told Fox 5 in San Diego.

The 90,000-sf terminal is the first phase of a 60-acre site that will incorporate two hotel sites, as well as commercial, office, industrial, and shipping facilities over this project’s 10-year buildout. 

 

Tags

Related Stories

Design Innovation Report | Jun 25, 2019

2019 Design Innovation Report: Super labs, dream cabins, office boardwalks, façades as art

9 projects that push the limits of architectural design, space planning, and material innovation.

Airports | May 20, 2019

How the Internet of Things will transform airport environments

Connected devices and their wealth of data have led to significant improvements in operational efficiency and passenger experience in airports.

Hotel Facilities | May 16, 2019

JFK’s TWA Flight Center has been reimagined as a hotel

MCR and Morse Development spearheaded the project.

Airports | May 9, 2019

Paine Field-Snohomish County Airport’s new terminal culminates early plan

$40 million redevelopment brands hub as true boutique airport.

Airports | May 1, 2019

The Ilan and Asaf Ramon International Airport opens in Israel’s Negev Desert

Amir Mann-Ami Shinar Architects and Planners designed the facility in partnership with Moshe Zur Architects.

Airports | Apr 1, 2019

Home team wins O’Hare terminal design competition

Studio ORD, which includes Chicago-based Studio Gang, is chosen from five finalists.

Airports | Mar 21, 2019

First photos inside the nearly completed Jewel Changi Airport addition

The addition is set to open this spring.   

Airports | Feb 28, 2019

Renovation of Tampa International Airport’s Main Terminal completes

Skanska and HOK led the design-build team.

Airports | Feb 26, 2019

Design team unveils Terminal Modernization Program at Pittsburgh International Airport

The terminal’s design philosophy combines nature, technology, and community.

Airports | Feb 21, 2019

Self-service bag drops and the challenges of speeding up airport baggage check-in

More airports are asking passengers to check their own baggage. What’s the ripple effect?

boombox1
boombox2
native1

More In Category




Great Solutions

41 Great Solutions for architects, engineers, and contractors

AI ChatBots, ambient computing, floating MRIs, low-carbon cement, sunshine on demand, next-generation top-down construction. These and 35 other innovations make up our 2024 Great Solutions Report, which highlights fresh ideas and innovations from leading architecture, engineering, and construction firms.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021