flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Skybridges connect SOM’s two trapezoidal Buenos Aires towers

Mixed-Use

Skybridges connect SOM’s two trapezoidal Buenos Aires towers

The project aims to become the center of activity in the city’s Catalinas Norte business district expansion.


By David Malone, Associate Editor | October 15, 2019
SOM's catalinas tio from the water

All renderings SOM, Ekoomedia

Skidmore, Owings & Merrill has released the first design details for Catalinas Rio, a waterfront office building in Buenos Aires’ Catalinas Norte business district expansion that comprises retail, public greenspace, and two intertwined trapezoidal towers.

The two towers, one that rises 29 stories and another that rises 22, are connected by a series of skybridges and green terraces. The towers and bridge floors create an urban window meant to establish the active heart of the office experience. Large, landscaped decks cross both bridge roofs and are complemented by recessed balconies in the tower floors to provide views of both the waterfront and cityscape. In total, the terraces offer 10,000 sm of outdoor space.

 

Catalinas Rio skybridges

 

Catalinas Rio is meant to create a new urban identity in the Catalinas Norte II master plan with the building’s public space playing the most important role in accomplishing this task. The outdoor urban square draws inspiration from the open spaces that characterize Buenos Aires’ historic fabric. The square connects to the street, waterfront, and every part of the building. It is located between the two tower forms and lobbies, where indoor retail and shared amenities on both sides are designed to form a cluster of activity. 

 

See Also: A new performance venue completes in one of the world’s densest cities

 

“The building itself is conceived as a vertical campus,” said SOM Director Kim Van Holsbeke, in a release. “It is a single structure that continues the vibrancy of the urban square up to the office floors.”

 

Catalinas Rio interior

 

Vertical fins, horizontal shades, and light shelves help bring light deep inside the building. An enhanced fresh air filtration system and access to water fountains throughout the building complement the daylighting to provide users with a healthy indoor work environment.

 

Catalinas Rio ground floor

 

SOM also hopes to create a pedestrian bridge that would stretch over nearby rail lines, highways, and the Rio de la Plata to connect to the public river promenade, a nearby ferry terminal, and Puerto Madero, – a mixed-use neighborhood across from Catalinas Norte II.

Construction is slated for completion in 2022.

Tags

Related Stories

Mixed-Use | Oct 7, 2024

New mixed-use tower by Studio Gang completes first phase of San Francisco waterfront redevelopment

Construction was recently completed on Verde, a new mixed-use tower along the San Francisco waterfront, marking the end of the first phase of the Mission Rock development. Verde is the fourth and final building of phase one of the 28-acre project that will be constructed in several phases guided by design principles developed by a design cohort led by Studio Gang.

Affordable Housing | Oct 4, 2024

3 new affordable housing projects for October 2024

As affordable housing continues to grow, more projects are looking to diversify their footprint by adding mixed-use components, community areas, and more.

Mixed-Use | Sep 19, 2024

A Toronto development will transform a 32-acre shopping center site into a mixed-use urban neighborhood

Toronto developers Mattamy Homes and QuadReal Property Group have launched The Clove, the first phase in the Cloverdale, a $6 billion multi-tower development. The project will transform Cloverdale Mall, a 32-acre shopping center in Toronto, into a mixed-use urban neighborhood.

Mixed-Use | Sep 10, 2024

Centennial Yards, a $5 billion mixed-use development in downtown Atlanta, tops out its first residential tower

Centennial Yards Company has topped out The Mitchell, the first residential tower of Centennial Yards, a $5 billion mixed-use development in downtown Atlanta. Construction of the apartment building is expected to be complete by the middle of next year, with first move-ins slated for summer 2025.

Codes and Standards | Sep 3, 2024

Atlanta aims to crack down on blighted properties with new tax

A new Atlanta law is intended to crack down on absentee landlords including commercial property owners and clean up neglected properties. The “Blight Tax” allows city officials to put levies on blighted property owners up to 25 times higher than current millage rates.

Building Technology | Aug 23, 2024

Top-down construction: Streamlining the building process | BD+C

Learn why top-down construction is becoming popular again for urban projects and how it can benefit your construction process in this comprehensive blog.

Mixed-Use | Aug 21, 2024

Adaptive reuse of a Sears store becomes luxury mixed-use housing

6 Corners Lofts at 4714 W Irving Park Road, Chicago, Ill., opened in March of 2024 as a 394,000-sf adaptive reuse project born out of a former Sears store.

Curtain Wall | Aug 15, 2024

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 

Adaptive Reuse | Aug 14, 2024

Adaptive reuse revives a former warehouse in St. Louis

The Victor, as the building is now called, has nearly 400 residential apartments.

Adaptive Reuse | Aug 14, 2024

KPF unveils design for repositioning of Norman Foster’s 8 Canada Square tower in London

8 Canada Square, a Norman Foster-designed office building that’s currently the global headquarters of HSBC Holdings, will have large sections of its façade removed to create landscaped terraces. The project, designed by KPF, will be the world’s largest transformation of an office tower into a sustainable mixed-use building.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021