Skidmore, Owings & Merrill has released the first design details for Catalinas Rio, a waterfront office building in Buenos Aires’ Catalinas Norte business district expansion that comprises retail, public greenspace, and two intertwined trapezoidal towers.
The two towers, one that rises 29 stories and another that rises 22, are connected by a series of skybridges and green terraces. The towers and bridge floors create an urban window meant to establish the active heart of the office experience. Large, landscaped decks cross both bridge roofs and are complemented by recessed balconies in the tower floors to provide views of both the waterfront and cityscape. In total, the terraces offer 10,000 sm of outdoor space.
Catalinas Rio is meant to create a new urban identity in the Catalinas Norte II master plan with the building’s public space playing the most important role in accomplishing this task. The outdoor urban square draws inspiration from the open spaces that characterize Buenos Aires’ historic fabric. The square connects to the street, waterfront, and every part of the building. It is located between the two tower forms and lobbies, where indoor retail and shared amenities on both sides are designed to form a cluster of activity.
See Also: A new performance venue completes in one of the world’s densest cities
“The building itself is conceived as a vertical campus,” said SOM Director Kim Van Holsbeke, in a release. “It is a single structure that continues the vibrancy of the urban square up to the office floors.”
Vertical fins, horizontal shades, and light shelves help bring light deep inside the building. An enhanced fresh air filtration system and access to water fountains throughout the building complement the daylighting to provide users with a healthy indoor work environment.
SOM also hopes to create a pedestrian bridge that would stretch over nearby rail lines, highways, and the Rio de la Plata to connect to the public river promenade, a nearby ferry terminal, and Puerto Madero, – a mixed-use neighborhood across from Catalinas Norte II.
Construction is slated for completion in 2022.
Related Stories
Reconstruction & Renovation | Feb 18, 2021
Connecticut’s Swift Gold Leaf Factory becomes a community job incubator
Bruner/Cott Architects designed the project.
Mixed-Use | Jan 21, 2021
3XN and IttenBrechbühl to design a wooden tower in Switzerland
The project will be located in Lausanne, Switzerland.
Mixed-Use | Jan 20, 2021
Union Square’s first ground-up development in two decades completes
MBH Architects, in collaboration with Page & Turnbull, designed the project.
Reconstruction Awards | Dec 29, 2020
The reenvisioned Sazerac House: A delectable cocktail that's just perfect for the Big Easy
The 51,987-sf Sazerac House is an interactive cocktail museum, active distillery, corporate headquarters, and event venue, all under one roof, next to the historic French Quarter of New Orleans.
Mixed-Use | Dec 28, 2020
BIG designs new mixed-use development in Harlem
The project, dubbed The Smile, has recently completed construction.
Urban Planning | Dec 6, 2020
Ford lays out plans for mobility innovation district in Detroit
Its centerpiece is an abandoned train depot whose architecture and decay reflect two sides of this city’s past.
Mixed-Use | Oct 19, 2020
Commonwealth Pier revitalization project begins construction in Boston’s Seaport
CBT, in collaboration with Schmidt Hammer Lassen Architects designed the project.
Mixed-Use | Oct 2, 2020
Zaha Hadid Architects unveils 2 Murray Road in Hong Kong
The project reinterprets the structural forms and layering of a Bauhinia bud about to blossom.
Reconstruction & Renovation | Sep 30, 2020
SOM reimagines former Cook County Hospital into mixed-use destination
The project is the first phase of a proposed $1 billion redevelopment plan for the area in Chicago.
Sustainability | Sep 29, 2020
Heatherwick Studio creates a new concept for San Francisco’s Piers 30-32
The new vision is dubbed The Cove.